- Strategic Planning and Program Management: Implementing an Organizational Strategic Vision through a Disciplined Program Management Approach

2016 ◽  
pp. 56-73
2021 ◽  
pp. 1063293X2110152
Author(s):  
Qing Yang ◽  
Yingxin Bi ◽  
Qinru Wang ◽  
Tao Yao

Software development projects have undergone remarkable changes with the arrival of agile development approaches. Many firms are facing a need to use these approaches to manage entities consisting of multiple projects (i.e. programs) simultaneously and efficiently. New technologies such as big data provide a huge power and rich demand for the IT application system of the commercial bank which has the characteristics of multiple sub-projects, strong inter-project correlation, and numerous project participating teams. Hence, taking the IT program management of a bank in China as a case, we explore the methods to solve the problems in multi-project concurrent development practice through integrating the ideas of program and batch management. First, to coordinate the multi-project development process, this paper presents the batch-based agile program management approach that synthesizes concurrent engineering with agile methods. And we compare the application of batch management between software development projects and manufacturing process. Further, we analyze the concurrent multi-project development practice in the batch-based agile program management, including the overlapping between stages, individual project’s activities, and multiple projects based on common resources and environment to stimulate the knowledge transfer. Third, to facilitate the communication and coordination of batch-based program management, we present the double-level responsibility organizational structure of batch management.


1989 ◽  
Vol 2 (3) ◽  
pp. 6-38 ◽  
Author(s):  
Bruce W. Harber ◽  
Godwin O. Eni

In a product management structure, the management of separate products is moved down in the organization to achieve greater participatory management as well as greater effectiveness in the identification of factors most relevant to the survival of the product. For the business industry, managing products as separate entitites enables more effective competition in the marketplace. This approach has been used in U.S. hospitals in managing programs and services. Described here are the initial attempts at program management undertaken at the Health Sciences Centre in Winnipeg, a highly specialized, provincial 1, 100-bed teaching and referral hospital. Some issues important in developing and implementing the program management approach are discussed.


Author(s):  
A. B. Zolotareva ◽  

Introduction: the article is devoted to the analysis of normative acts regulating the application of project and program management principles in the budget planning process in Russia. Objectives: to assess the regulatory framework of project and program management for its integrity, consistency and compliance with budget legislation and international standards of program and project management; to formulate the areas to optimize program and project budgeting in Russia. Methods: the research uses methods of comparative legal and system analysis. Results: the main issues in legal regulation in the field of research are identified, including: non-compliance of the actual strategic planning procedure with the requirements of the federal law; excessive number and mutual duplication of the content of project and program documents in the absence of their clear hierarchy; non-compliance in the Russian legislation with such basic principles of project and program management as the limited time of the goals and objectives in program documents, concentration of powers to manage projects (programs) and responsibility for their results in the same position; the actual withdrawal of the legislative power and the Russian Government from participation in program and project management; dual power in industry management. Conclusions: to overcome the above shortcomings the following measures, among all, are advisable: to fix the status of national projects in the Federal Law “On strategic planning in the Russian Federation” as the fundamental planning documents; to include data on the volume of their financial support and main activities in national projects, excluding current costs and measures already listed in the state programs; to restore the powers of the Russian Government to give approval on the national projects content (passports) as well as the federal projects outside the national ones; to bridge the gap between the powers and responsibilities of program (project) managers.


Sign in / Sign up

Export Citation Format

Share Document