scholarly journals Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods

2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Jiao Wang

Based on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investment decision estimate stage, design estimate stage, bidding price stage, construction budget stage, and final account stage. Combined with the basic data obtained from the questionnaire, the membership degree method is adopted to screen the key indicators of the preliminary factors of cost risk and then eliminate the redundant indicators. Furthermore, a set of simple and efficient risk evaluation index system for power grid engineering cost is constructed in order to improve the risk evaluation and management level of power grid construction project in China.

2021 ◽  
Vol 233 ◽  
pp. 03060
Author(s):  
Bing Xu ◽  
Qinling Zeng

The development focus of real estate enterprises has shifted from traditional buildings to industrial park construction. After summarizing and analyzing the risk factors of the traditional construction cost, the WBS-CBS-RBS method is used to classify and identify the whole process cost of the industrial park. Finally, eight first level evaluation indexes and 37 second level evaluation indexes are established to form the whole process cost risk evaluation index system of the industrial park construction, which provides the basis for the whole process cost risk assessment of the subsequent industrial park construction.


2012 ◽  
Vol 45 ◽  
pp. 101-105
Author(s):  
Huang Wenhong ◽  
Hailong Wang ◽  
Xuesheng Li ◽  
Qifu Bao

2014 ◽  
Vol 521 ◽  
pp. 516-520
Author(s):  
Hou Dong Xu ◽  
Pu Yu He ◽  
Shu Xiang Wang ◽  
Chuang Deng ◽  
Wei Dong Zheng ◽  
...  

The demand of electricity is growing fast in recent years, the electricity supply situation was tense especially in summer and winter, power emergency brownouts as effective measures to ease power tensions, has become an important part of demand-side management. Grid Emergency-order arrangement affects the scheduling and reliability of electricity, but also directly affects the user's production and life. This article establishes a grid emergency order bit of evaluation index system from the angle of environment, resources, economy and user perspective, and uses the normalization and AHP analysis to empower indexes.


Sign in / Sign up

Export Citation Format

Share Document