A Sequential Procedure for Testing Many Composite Hypotheses

1988 ◽  
Vol 32 (1) ◽  
pp. 138-142 ◽  
Author(s):  
I. V. Pavlov
Author(s):  
K. S. Margaret ◽  
G. Sathish Kumar ◽  
J. Narendiran ◽  
M. Raman

The aim of the project is to build an assembly station with the preventive section under the process of poke yoke system. Poke yoke is the general methodology following in industry to avoid mismatching product in assembly stations.  The main aim of this project is to avoid assembling process when the sequential procedure is not followed. The project also deals with AGV – Automatic Guided Vehicle. It automatically shifts the assembling components from store room to work station when the count of components decreases in storage bin. When the material count in the storage bins reaches the preset count it will pass signal to store room, the components will be filled manually in AGV storage bins and then the AGV is moved to the destination point (work station).


2015 ◽  
Vol 33 (5) ◽  
pp. 708-712 ◽  
Author(s):  
Eric Boccio ◽  
Rashmeet Gujral ◽  
Michael Cassara ◽  
Teresa Amato ◽  
Benjamin Wie ◽  
...  
Keyword(s):  

1989 ◽  
Vol 18 (1) ◽  
pp. 43-54 ◽  
Author(s):  
S Fleisher ◽  
E Shwedyk
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document