Micromachined silicon acoustic delay line with improved structural stability and acoustic directivity for real-time photoacoustic tomography

2017 ◽  
Author(s):  
Young Cho ◽  
Akhil Kumar ◽  
Song Xu ◽  
Jun Zou
2017 ◽  
Vol 9 (3) ◽  
pp. 315-326 ◽  
Author(s):  
Lars Keuninckx ◽  
Jan Danckaert ◽  
Guy Van der Sande

1979 ◽  
Vol 34 (2) ◽  
pp. 123-125 ◽  
Author(s):  
H. R. Fetterman ◽  
P. E. Tannenwald ◽  
C. D. Parker ◽  
J. Melngailis ◽  
R. C. Williamson ◽  
...  

2012 ◽  
Vol 151 ◽  
pp. 291-294
Author(s):  
Jian Hua Cui ◽  
Ping Liu

Based on the construction of the transfer floor of Yunding project in Chengdu, to solve the issues from the integral stability and safety of the transfer beam high-formwork supporting system, the method of the theoretical calculation, the method of the numerical simulation and real-time monitoring were applied in order to make some conclusions. The conclusions will be significance to apply in the future similar projects for reference and guidance.


Sign in / Sign up

Export Citation Format

Share Document