scholarly journals Development of the Nissan YTP-12 Gas Turbine Engine

Author(s):  
Y. Sumi ◽  
S. Yamazaki ◽  
K. Kinoshita

This paper describes the later progress of the Nissan YTP-12 gas turbine engine development. The mechanical design and the progress in its development are reviewed. The discussion includes mechanical arrangement, material, fuel control, major problems encountered and their solution. Component test, engine performance and durability test, and vehicle installation test are discussed briefly.

Author(s):  
Jay-Chul Kim

This paper describes major results of combustor envelopment activities conducted under 1 MW industrial engine (Turbo Green 1200) program at Samsung Aerospace. The program was initiated in 1992 partially supported by Korean government. The main application of the industrial engine is a standby duty unit with a future derivative engine considered for a cogeneration unit. During the engine development, various tests of the engine and its components were carried out to confirm the performance target or the engine. This paper concentrates on the component test activities of the combustion section.


Author(s):  
Peter D. Smout ◽  
Steven C. Cook

The determination of gas turbine engine performance relies heavily on intrusive rakes of pilot tubes and thermocouples for gas path pressure and temperature measurement. For over forty years, Kiel-shrouds mounted on the rake body leading edge have been used as the industry standard to de-sensitise the instrument to variations in flow incidence and velocity. This results in a complex rake design which is expensive to manufacture, susceptible to mechanical damage, and difficult to repair. This paper describes an exercise aimed at radically reducing rake manufacture and repair costs. A novel ’common cavity rake’ (CCR) design is presented where the pressure and/or temperature sensors are housed in a single slot let into the rake leading edge. Aerodynamic calibration data is included to show that the performance of the CCR design under uniform flow conditions and in an imposed total pressure gradient is equivalent to that of a conventional Kiel-shrouded rake.


Author(s):  
V. Pachidis ◽  
P. Pilidis ◽  
I. Li

The performance analysis of modern gas turbine engine systems has led industry to the development of sophisticated gas turbine performance simulation tools and the utilization of skilled operators who must possess the ability to balance environmental, performance and economic requirements. Academic institutions, in their training of potential gas turbine performance engineers have to be able to meet these new challenges, at least at a postgraduate level. This paper describes in detail the “Gas Turbine Performance Simulation” module of the “Thermal Power” MSc course at Cranfield University in the UK, and particularly its practical content. This covers a laboratory test of a small Auxiliary Power Unit (APU) gas turbine engine, the simulation of the ‘clean’ engine performance using a sophisticated gas turbine performance simulation tool, as well as the simulation of the degraded performance of the engine. Through this exercise students are expected to gain a basic understanding of compressor and turbine operation, gain experience in gas turbine engine testing and test data collection and assessment, develop a clear, analytical approach to gas turbine performance simulation issues, improve their technical communication skills and finally gain experience in writing a proper technical report.


Author(s):  
Hideo Kobayashi ◽  
Shogo Tsugumi ◽  
Yoshio Yonezawa ◽  
Riuzou Imamura

IHI is developing a new heavy duty gas turbine engine for 2MW class co-generation plants, which is called IM270. This engine is a simple cycle and single-spool gas turbine engine. Target thermal efficiency is the higher level in the same class engines. A dry low NOx combustion system has been developed to clear the strictest emission regulation in Japan. All parts of the IM270 are designed with long life for low maintenance cost. It is planned that the IM270 will be applied to a dual fluid system, emergency generation plant, machine drive engine and so on, as shown in Fig.1. The development program of IM270 for the co-generation plant is progress. The first prototype engine test has been started. It has been confirmed that the mechanical design and the dry low NOx system are practical. The component tuning test is being executed. On the other hand, the component test is concurrently in progress. The first production engine is being manufactured to execute the endurance test using a co-generation plant at the IHI Kure factory. This paper provides the conceptual design and status of the IM270 basic engine development program.


Author(s):  
D. M. Croker ◽  
T. P. Psichogios

This paper describes the operation and salient design features of a high-speed reversing gear used with the Solar 1100-hp Saturn gas-turbine Engine. Development history leading to successful marine applications is reviewed.


Author(s):  
J. D. MacLeod ◽  
B. Drbanski

The Engine Laboratory of the National Research Council of Canada (NRCC), with the assistance of Standard Aero Ltd., has established a program for the evaluation of component deterioration on gas turbine engine performance. As part of this project, a study of the effects of turbine rebuild tolerances on overall engine performance was undertaken. This study investigated the range of performance changes that might be expected for simply disassembling and reassembling the turbine module of a gas turbine engine, and how these changes would influence the results of the component fault implantation program. To evaluate the effects of rebuilding the turbine on the performance of a single spool engine, such as Allison T56 turboprop engine, a series of three rebuilds were carried out. This study was performed in a similar way to a previous NRCC study on the effects of compressor rebuilding. While the compressor rebuild study had found performance changes in the order of 1% on various engine parameters, the effects of rebuilding the turbine have proven to be even more significant. Based on the results of the turbine rebuild study, new methods to improve the assurance of the best possible tolerances during the rebuild process are currently being addressed. This paper describes the project objectives, the experimental installation, and the results of the performance evaluations. Discussed are performance variations due to turbine rebuilds on engine performance characteristics. As the performance changes were significant, a rigorous measurement uncertainty analysis is included.