Designing Electronic Products to Withstand the Distribution Environment

1989 ◽  
Vol 111 (4) ◽  
pp. 294-298
Author(s):  
R. Peache ◽  
D. Privitera ◽  
J. Gasper ◽  
D. Heasty

During the past few years product mechanical shock fragility analysis has become an accepted part of the product design cycle at Wang Laboratories, Inc. This analysis is used to insure that the product has sufficient strength to work in the user environment without problem, and to survive the shipping environment from Wang to the customer without requiring excessively expensive shipping packaging. In some cases it is possible to make relatively inexpensive changes in the product which increase the mechanical shock resistance of that product. The cost of these changes is weighed against the cost of the amount of cushioning and related recurring costs needed in the shipping package to provide protection for the lower shock level the unmodified product is capable of withstanding. If the cost of product modification is lower than the cost of the increased package materials, freight and storage (increased cube), the modification is made to the product. A brief background of shock testing products is given, with particular attention to the use of ASTM D 3332. This process is presented as a specific case study on a recently developed CRT monitor.

2015 ◽  
Vol 2 (12) ◽  
pp. 1019
Author(s):  
Anggia Jancynthia Nurizki Wardhani ◽  
Sunan Fanani

This study aims to determine the conformity of contract rahn based Fatwa DSN-MUI at Sharia Mandiri Bank Branch Office Dharmahusada Surabaya. Contract rahn at Sharia Mandiri Bank only be used for products BSM Gold Pawn. The method used is a qualitative approach using case study strategy. The research object is the Sharia Mandiri Bank.Results of this research based on five domains from the mechanism of implementation contract Rahn in Sharia Mandiri Bank Branch Office Dharmahusada Surabaya with Fatwa DSN-MUI. From these domains, there are four domains that have conformity with Fatwa DSNMUI, that was marhun utilization domain, maintenance and storage marhun, sale / auction marhun as well as the cost of Ijarah contract. While in the charge domain on marhun against the costs Ijarah in Sharia Bank Mandiri KCP Dharmahusada don’t have conformity based on Fatwa DSN No.25 / DSN-MUI / III / 2002 the second point number four.


2018 ◽  
Vol 10 (12) ◽  
pp. 4501 ◽  
Author(s):  
Linda Bambara ◽  
Marie Sawadogo ◽  
Daniel Roy ◽  
Didier Anciaux ◽  
Joël Blin ◽  
...  

In arid and semi-arid climates, Balanites aegyptiaca (B. aegyptiaca) is a potential plant to produce oilseed-based biofuels. In this paper an optimization model for a wild biomass supply chain is presented. The model was developed to identify the optimal organization of the supply network that minimizes the cost of supplying the feedstock. It was applied to a case study on a B. aegyptiaca seed supply chain in Burkina Faso. Considering different means of transport and different pre-processing locations, the results show that in contexts such as Burkina Faso’s, the most efficient option for the supply of B. aegyptiaca seeds is using animal drawn carts to transport the biomass from the harvest sites to the collection points. Feedstock pre-processing should take place before transport and an improvement in pre-processing operations by mechanical de-hulling could help reduce the cost price of the seeds. The results also show that more than 35% of the cost price of B. aegyptiaca seed is accounted for by transport costs. Pre-processing, handling, and storage costs account for about 50% of the cost of the seeds.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2016 ◽  
Vol 10 (2) ◽  
pp. 162-171
Author(s):  
Hafid Hafid ◽  
Tatang Sutisna

The design and manufacturing of the rotary table with the specification Ø 170 mm (6 inches) for CNC machine 4 axis has been done. The objective of manufacturing a rotary table is to increase the efficiency of CNC machine Hardford 4 axis to be above 80% in line machining center CV. IM’s workshop. The engineering methods was taken, consist of: working preparation, manufacturing of working drawing, engineering process, the manufacturing and testing. The prototype has been tested and operated, the resulting of increasing productivity of which were as follows: the process of assembling was increased to be 3 time ( before 1 time) and processing time for a specific case reduced from 5 hours to 3 hours, number of operators for the case of assembling the rotary reduced to 1 person (before 4 persons), safety and security become to be better. The results show increased efficiency of CNC machine Hardford, from under 50% to be above 80%. Based on the economical analysis obtained by the cost of good sold (C.G.S) of the rotary table is IDR 34.060.000. The results presented in this paper is expected to be case study for developing a business of the metal and engineering SMEs domestic to the effort of improving efficiency, quality, productivity and competitiveness in global market.ABSTRAKPerancangan dan pembuatan alat bantu meja putar (rotary table) dengan spesifikasi teknis Ø 170 mm (6 inci) untuk mesin CNC 4 axis telah dilakukan. Tujuan pembuatan rotary table adalah untuk meningkatkan efisiensi mesin CNC Hardford 4 axis di atas 80% pada line machining center Bengkel CV. IM. Metode rancang bangun yang dilakukan, meliputi: persiapan kerja, pembuatan gambar kerja, proses engineering, pembuatan dan uji coba. Prototip tersebut telah diuji coba dan dioperasikan dengan hasil peningkatan produktivitas sebagai berikut: proses pengerjaan bongkar pasang meningkat menjadi 3 kali (sebelumnya 1 kali) dan waktu pengerjaan untuk kasus tertentu berkurang dari 5 jam menjadi 3 jam, jumlah operator untuk kasus bongkar pasang rotary berkurang menjadi 1 orang (sebelumnya 4 orang), keselamatan kerja dan keamanan menjadi lebih baik. Hasil peningkatan berupa efisiensi mesin CNC Hardford 4 axis dari sebelumnya di bawah 50% menjadi di atas 80%. Berdasarkan hasil perhitungan analisis ekonomi diperoleh harga pokok produksi (HPP) alat bantu meja putar adalah sebesar Rp. 34.060.000. Bahasan ini diharapkan menjadi contoh kasus bagi pengembangan usaha IKM logam dan mesin dalam negeri untuk meningkatkan efisiensi, mutu, produktivitas dan keunggulan daya saing di pasar global.Kata kunci: alat bantu meja putar, mesin CNC, harga pokok produksi


Author(s):  
Michael Woo ◽  
Marcos Campos ◽  
Luigi Aranda

Abstract A component failure has the potential to significantly impact the cost, manufacturing schedule, and/or the perceived reliability of a system, especially if the root cause of the failure is not known. A failure analysis is often key to mitigating the effects of a componentlevel failure to a customer or a system; minimizing schedule slips, minimizing related accrued costs to the customer, and allowing for the completion of the system with confidence that the reliability of the product had not been compromised. This case study will show how a detailed and systemic failure analysis was able to determine the exact cause of failure of a multiplexer in a high-reliability system, which allowed the manufacturer to confidently proceed with production knowing that the failure was not a systemic issue, but rather that it was a random “one time” event.


1992 ◽  
Vol 25 (9) ◽  
pp. 211-216
Author(s):  
A. Akyarli ◽  
Y. Arisoy

As the wave forces are the function of the wave height, period and the angle between the incoming wave direction and the axis of the discharge pipeline, the resultant wave force is directly related to the alignment of the pipeline. In this paper, a method is explained to determine an optimum pipeline route for which the resultant wave force becomes minimum and hence, the cost of the constructive measures may decrease. Also, the application of this method is submitted through a case study.


2019 ◽  
Author(s):  
Michael Petronis ◽  
◽  
Vincent Twomey ◽  
William McCarthy ◽  
Craig MaGee
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document