Project Integration Method Based on Knowledge Set Theory in Science and Technology Project Management

Author(s):  
Haifeng Li ◽  
Haifeng Li
2021 ◽  
Vol 2021 ◽  
pp. 1-10
Author(s):  
Jinhua Liu ◽  
Caiping Wang ◽  
Xianchun Xiao

This paper analyzes the user needs of the scientific research project management system, expounds the feasibility of information system development, and analyzes the business needs combined with the reality of scientific research project management. In the system level design, combined with the demand analysis of the information system function, the system module is developed in a hierarchical way. The whole system is divided into four layers: (i) core business layer; (ii) data access interface layer; (iii) neighborhood object layer; (iv) data platform. The specific functions include three various modules, i.e., scientific research project information management module, research achievement management module, and scientific research information portal module. In the system software part, the attribute encryption method is used to effectively encrypt the information of scientific and technological projects and to protect the safe sharing of scientific and technological information in colleges and universities. Finally, we look at the limitations of conducting high-quality design-science research in the context of the larger information system community. The experimental results show that the system can perform the corresponding functions effectively, and the data reading integrity is high, which can meet the requirements of the university science and technology project information management.


2021 ◽  
Vol 292 ◽  
pp. 01017
Author(s):  
Yingcui Chen ◽  
Wangyuan Xie ◽  
Xinru Yu ◽  
Chao Wu

The electric power industry is an important chain in the energy revolution and one of the most important basic industries. At the same time, it is also facing the technology collision and industry innovation brought by various emerging technologies, which constantly promotes the development of the electric power industry in the direction of safety, intelligence and cleanness. Power grid enterprises have a great demand for scientific research and innovation, and the average annual investment in scientific research has exceeded 100 million yuan. With the increasing investment in scientific research and development of power enterprises year by year, the demand for systematic, scientific and efficient management system for scientific and technological projects is becoming increasingly urgent. In view of the shortcomings of the traditional project management mode, this study establishes the corresponding management and evaluation mechanism by combining with the whole life cycle management method of modern project management, realizes the transformation of power enterprise science and technology project management to high efficiency, high quality, specialization and scientization, and promotes the innovation and integration development of traditional technology and emerging technology. The all life-cycle management mode has been widely applied in major power grid projects. By integrating superior resources, breaking through major engineering technology research and development, giving full play to the innovation of projects and avoiding research and development risks, it explores the development direction of science and technology project management in energy industry and improves the industry management level.


2021 ◽  
Vol 2083 (3) ◽  
pp. 032096
Author(s):  
Fan Zhao

Abstract At present, the technical plan project appraised the management systematic characteristic, continuous, the independent not strong third party appraised carries out the advancement to be slow; The project may supervise the measure not strong not to have the explicit monitor target and the baseline data; Has not established a set to conform to the technical project characteristic and the project monitor appraisal system which matches with the science and technology project management. In view of above question, uses JAVA and the STRUTS method of exploitation realization easy to maintain, the easy dynamic expansion, to have the secure technical plan project appraisal management process. Through in the recent three years in the Gansu Province science and technology plan project appraised in the management the application indicated, the system enormous enhancement project appraisal management working efficiency, the system movement has been stable, the speed of response is quick, the security is high.


Sign in / Sign up

Export Citation Format

Share Document