THE DEVELOPMENT AND EARLY PERFORMANCE OF THE NORTH RANKIN FIELD

1986 ◽  
Vol 26 (1) ◽  
pp. 420
Author(s):  
F.M. Posaner ◽  
W.H. Goldthorpe

The North Rankin gas field is the first field to be developed as part of the North West Shelf Project and has now been on stream for some two years. With a most likely gas-initially-in-place of 11TCF (308 × 109 m3), it is the largest appraised gas-condensate field in Australia.At the current stage, gas is being produced from one platform (the North Rankin 'A' platform) entirely for domestic consumption. Future development involves the drilling of additional wells to provide gas for export as liquefied natural gas (LNG) to Japan, installation of a second platform, and construction of an additional onshore plant to manufacture the LNG. In addition, a gas recycling project is to be implemented on the North Rankin 'A' platform to increase the recovery of condensate by utilizing spare platform processing capacity available prior to reaching plateau LNG exports.The present paper reviews the development and performance of this major field over the first two years of its producing life. Emphasis is placed on the reservoir pressure performance, particularly in relation to the reservoir geology.

2005 ◽  
Vol 45 (1) ◽  
pp. 13
Author(s):  
A.J. McDiarmid ◽  
P.T. Bingaman ◽  
S.T. Bingham ◽  
B. Kirk-Burnnand ◽  
D.P. Gilbert ◽  
...  

The John Brookes gas field was discovered by the drilling of John Brookes–1 in October 1998 and appraisal drilling was completed in 2003. The field is located about 40 km northwest of Barrow Island on the North West Shelf, offshore West Australia. The John Brookes structure is a large (>90 km2) anticline with >100 m closure mapped at the base of the regional seal. Recoverable sales gas in the John Brookes reservoir is about 1 Tcf.Joint venture approval to fast track the development was gained in January 2004 with a target of first gas production in June 2005. The short development time frame required parallel workflows and use of a flexible/low cost development approach proven by Apache in the area.The John Brookes development is sized for off-take rates up to 240 TJ/d of sales gas with the development costing A$229 million. The initial development will consist of three production wells tied into an unmanned, minimal facility wellhead platform. The platform will be connected to the existing East Spar gas processing facilities on Varanus Island by an 18-inch multi-phase trunkline. Increasing the output of the existing East Spar facility and installation of a new gas sweetening facility are required. From Varanus Island, the gas will be exported to the mainland by existing sales gas pipelines. Condensate will be exported from Varanus Island by tanker.


2007 ◽  
Vol 47 (1) ◽  
pp. 163 ◽  
Author(s):  
P. E. Williamson ◽  
F. Kroh

Amplitude versus offset (AVO) technology has proved itself useful in petroleum exploration in various parts of the world, particularly for gas exploration. To determine if modern AVO compliant processing could identify potential anomalies for exploration of open acreage offshore Australia, Geoscience Australia reprocessed parts of four publicly available long cable lines. These lines cover two 2006 acreage release areas on the Exmouth Plateau and in the Browse Basin on the North West Shelf. An earlier study has also been done on two publicly available long cable lines from Geoscience Australia’s Bremer Basin study and cover areas from the 2005 frontier acreage release on the southern margin. The preliminary results from these three reprocessing efforts produced AVO anomalies and were made publicly available to assist companies interested in assessing the acreage. The results of the studies and associated data are available from Geoscience Australia at the cost of transfer.The AVO data from the Exmouth Plateau show AVO anomalies including one that appears to be at the Jurassic level of the reservoir in the Jansz/Io supergiant gas field in adjacent acreage to the north. The AVO data from the Caswell Sub-basin of the Browse Basin show an AVO anomaly at or near the stratigraphic zone of the Brecknock South–1 gas discovery to the north. The geological settings of strata possibly relating to two AVO anomalies in the undrilled Bremer Basin are in the Early Cretaceous section, where lacustrine sandstones are known to occur. The AVO anomalies from the three studies are kilometres in length along the seismic lines.These preliminary results from Geoscience Australiaand other AVO work that has been carried out by industry show promise that AVO compliant processing has value—particularly for gas exploration offshore Australia—and that publicly available long-cable data can be suitable for AVO analysis.


2006 ◽  
Vol 46 (1) ◽  
pp. 101 ◽  
Author(s):  
K.J. Bennett ◽  
M.R. Bussell

The newly acquired 3,590 km2 Demeter 3D high resolution seismic survey covers most of the North West Shelf Venture (NWSV) area; a prolific hydrocarbon province with ultimate recoverable reserves of greater than 30 Tcf gas and 1.5 billion bbls of oil and natural gas liquids. The exploration and development of this area has evolved in parallel with the advent of new technologies, maturing into the present phase of revitalised development and exploration based on the Demeter 3D.The NWSV is entering a period of growing gas market demand and infrastructure expansion, combined with a more diverse and mature supply portfolio of offshore fields. A sequence of satellite fields will require optimised development over the next 5–10 years, with a large number of wells to be drilled.The NWSV area is acknowledged to be a complex seismic environment that, until recently, was imaged by a patchwork of eight vintage (1981–98) 3D seismic surveys, each acquired with different parameters. With most of the clearly defined structural highs drilled, exploration success in recent years has been modest. This is due primarily to severe seismic multiple contamination masking the more subtle and deeper exploration prospects. The poor quality and low resolution of vintage seismic data has also impeded reservoir characterisation and sub-surface modelling. These sub-surface uncertainties, together with the large planned expenditure associated with forthcoming development, justified the need for the Demeter leading edge 3D seismic acquisition and processing techniques to underpin field development planning and reserves evaluations.The objective of the Demeter 3D survey was to re-image the NWSV area with a single acquisition and processing sequence to reduce multiple contamination and improve imaging of intra-reservoir architecture. Single source (133 nominal fold), shallow solid streamer acquisition combined with five stages of demultiple and detailed velocity analysis are considered key components of Demeter.The final Demeter volumes were delivered early 2005 and already some benefits of the higher resolution data have been realised, exemplified in the following:Successful drilling of development wells on the Wanaea, Lambert and Hermes oil fields and identification of further opportunities on Wanaea-Cossack and Lambert- Hermes;Dramatic improvements in seismic data quality observed at the giant Perseus gas field helping define seven development well locations;Considerably improved definition of fluvial channel architecture in the south of the Goodwyn gas field allowing for improved well placement and understanding of reservoir distribution;Identification of new exploration prospects and reevaluation of the existing prospect portfolio. Although the Demeter data set has given significant bandwidth needed for this revitalised phase of exploration and development, there remain areas that still suffer from poor seismic imaging, providing challenges for the future application of new technologies.


1990 ◽  
Vol 30 (1) ◽  
pp. 310
Author(s):  
D. Lasserre

A large proportion of the North West Shelf development gas wells are long reach (greater than 3500 m) and highly deviated. For reservoir description and management purposes, comprehensive formation evaluation needs to be carried out in these wells.Considerable difficulties have been encountered with electric log data acquisition due to friction and borehole conditions in these long, highly-deviated wells. As a result, new techniques to log the zones of interest were introduced. A system using the drill pipe to transport the downhole logging tools has been successfully used.Also, low-toxicity oil-based mud (LTM) was introduced in order to ease drilling problems and borehole conditions. However, owing to the non-conductive nature of the oil-based drilling fluid, improvements were required in the vertical resolution of the resistivity measurements and the estimation of the formation porosity.A computer program using a forward deconvolution technique recently developed by Shell's research laboratory in Holland has been successfully applied to enhance the vertical resolution of the resistivity log reading.The large range of uncertainty on the pore volume has been reduced to reasonable level by calibrating the porosity log data against core data obtained in a well drilled with LTM.


1983 ◽  
Vol 23 (1) ◽  
pp. 164
Author(s):  
M. David Agostini

The North Rankin gas field discovered in 1971, has been evaluated by a series of appraisal wells and refinement of this is underway through the use of a 3D seismic survey. Extensive production testing on two wells was used to establish reservoir fluid characteristics, inflow performance and to predict reservoir behaviour.The North Rankin 'A' platform has been constructed of a standard steel jacket design. Components of the structure were built in Japan, Singapore, Geraldton, Jervoise Bay and Adelaide. Provision exists for 34 wells to be drilled from the structure to exploit the southern end of the North Rankin field.Simultaneous drilling and producing activities are planned, requiring well survey and deviation control techniques that will provide a high level of confidence. Wells will be completed using 7 inch tubing, fire resistant christmas trees, and are designed to be produced at about 87 MMSCFD on a continuous basis. Process equipment on this platform is designed to handle 1200 MMSCFD and is intended primarily to dry the gas and condensate and to transfer gas and liquid to shore in a two phase 40 inch pipeline. The maintenance of offshore equipment is being planned to maximise the ratio between planned and unplanned work.The commencement of drilling activities is planned for mid 1983, with commissioning of process equipment occurring in the second quarter of 198 The North Rankin 'A' platform will initially supply the WA market at some 400 MMSCFD offshore gas rate, requiring 7 wells. The start of LNG exports is planned for April 1987. The intial gas for this will be derived from the North Rankin 'A' platform.


2018 ◽  
Vol 7 (3) ◽  
pp. 36
Author(s):  
Samuel Tanjeh Mukah

The pursuit of quality service delivery in the public sector management in Cameroon necessitated the decentralisation of public sector management by transferring more power and resources to the local councils. This is in a bid to make them more self-governing. These councils are expected to meet the aspirations of their municipalities by carrying out approved projects efficiently and effectively. In this regard, this paper sets out to investigate the relationship between budgetary control and performance of local councils in Mezam and Momo Divisions of the North West Region of Cameroon, and the challenges these councils encounter in the process of budgetary control. Data was collected through a survey and analysed using the Ordinary Least Square (OLS) estimation technique to regress the relationship between the budgetary control variables and council performance. The empirical results showed that the key budgetary control variables (planning, participation, monitoring and control, motivation, communication, and responsibility) have a positively and statistically significant effect on performance of the councils. Effective performance of local councils in Mezam and Momo Divisions of the North West Region of Cameroon could then be attributed to effective presence of budgetary control requiring the availability of financial resources rationally allocated, qualified and experienced personnel, participation of all responsibility center managers in the planning and control processes, and regular communication and motivation of the council staff. 


Author(s):  
Charles-Antoine Guérin ◽  
Dylan Dumas ◽  
Anne Molcard ◽  
Céline Quentin ◽  
Bruno Zakardjian ◽  
...  

AbstractWe report on the installation and first results of one compact oceanographic radar in the region of Nice for a long-term observation of the coastal surface currents in the North-West Mediterranean Sea. We describe the specific processing and calibration techniques that were developed at the laboratory to produce high-quality radial surface current maps. In particular, we propose an original self-calibration technique of the antenna patterns, which is based on the sole analysis of the database and does not require any shipborne transponder or other external transmitters. The relevance of the self-calibration technique and the accuracy of inverted surface currents have been assessed with the launch of 40 drifters that remained under the radar coverage for about 10 days.


Author(s):  
Carolina Remorini ◽  
María Laura Palermo

We characterized and analyzed women’s narrative around the idea of becoming asustado (scared)as a cultural way of understanding why children get sick repeatedly or develop illnesses that become increasingly severe, as part of a study carried out in rural communities from the Molinos District, in the North-West of Argentina. We analyze and discuss the implications of becoming asustado for everyday child-rearing and children's health, sociability, and performance in different community endeavors from ethnographic data. We intentionally selected 15 cases elaborated based on 55 semi-structured interviews with 15 women, between 25 and 55 years old, all caregivers of children under 6 years old. Our results show that susto (fright) serves as an explanation for those people who do not fit with cultural expectations about their phenotype and social performance. Also, it is a culturally acceptable way of dealing with both physical and mental stress.


2020 ◽  
Vol 60 (2) ◽  
pp. 371
Author(s):  
Matthew Quinn

Australia’s production has been steadily increasing since 2013 with the main contributors being the large liquefied natural gas (LNG) projects. The North Carnarvon Basin accounted for over half of Australian production in 2019, dominated by North West Shelf LNG, Gorgon, Wheatstone and Pluto. Just under a quarter of production was from the Bowen-Surat Basin, with the highest producing project being the Condabri, Talinga and Orana cluster of coal seam assets. The next most prolific basin was the Browse Basin at just over 10%, with Prelude and Ichthys, followed by the Gippsland at 7%. During the year, the Greater Enfield Project, in the North Carnarvon Basin, was brought onstream, which involved a 30-km tie-in of the Laverda and Cimatti fields to the Ngujima-Yin floating production, storage and offloading vessel at the Vincent Field via sub-sea pipelines. Also brought into production during 2019 was the Roma North and Project Atlas, Bowen-Surat Basin, coal bed methane projects. Gas from Roma North is exclusively contracted to the Gladstone LNG consortium while Project Atlas gas will be supplied to domestic customers.


1992 ◽  
Vol 32 (1) ◽  
pp. 56
Author(s):  
Adrian Williams ◽  
Dave Macey

Since start-up of Harriet oil production in early 1986, the TL/1 joint venturers have attempted to find a use for the oil-associated gas as well as other gas from neighbouring small gas fields. Initially, supplies from the North West Shelf Project were well in excess of local demand and acted as a damper on new development projects. With time, however, gas reserves in the Harriet area were augmented through new discoveries and the State's demand grew steadily until, in mid 1990, a new project could be justified. In December 1990, an agreement was reached with the State Energy Commission of Western Australia (SECWA) for the supply of 140 PJ (123 BCF) of gas over a ten year period, with an option for a further 65 PJ (57 BCF). First gas supplies are planned for June 1992.The project is based on the supply of Harriet solution gas as well as free gas from the Campbell, Sinbad and Rosette fields. Bambra is a potential future addition but is not required initially for the contract.The project involves small offshore platforms at Campbell and Sinbad, a wet gas pipeline from these platforms to Varanus Island, a facility on the Island to dry the gas and boost the pressure, and a transmission line to SECWA's system, approximately 100 km distant.The transmission pipeline has considerable reserve capacity over the initial contract flowrate of 30 to 60 TJ/day (26 to 52 MMCFGD) and provides a basis for further small gas projects utilising either flare gas from new oil developments or new gas field developments.


Sign in / Sign up

Export Citation Format

Share Document