Low-voltage ride through (LVRT) testing of full power converter for wind turbines using all-electronic equipment

Author(s):  
A. Petucco ◽  
A. Zuccato ◽  
P. Mattavelli ◽  
A. Abdelhakim
2013 ◽  
Vol 448-453 ◽  
pp. 1865-1870
Author(s):  
Xiang Yu Lv ◽  
Bo Gao ◽  
Guo Wei Cai ◽  
De Xin Li

With an increasing amount of wind energy installed, the behavior of wind turbines during grid disturbances becomes more and more important. This paper introduces the basic structures of doubly-fed wind turbines and direct-drive permanent magnet synchronous wind turbines and analyses the capability of low voltage ride through (LVRT) of the wind turbines. Finally this paper elaborates the principle and the procedures of the LVRT tests. The results of the tests show that: Doubly-fed wind turbines and direct-drive permanent magnet synchronous wind turbines are equipped with LVRT capability. The turbines are able to operate normally without disconnection and provide reactive power to support grid restoration during the dip. The direct-drive permanent magnet synchronous wind turbines are superior to the doubly-fed wind turbines on LVRT since a full-power converter is used.


2020 ◽  
Vol 15 (4) ◽  
pp. 1567-1575
Author(s):  
Aiguo Tan ◽  
Zhihan Tang ◽  
Xianbo Sun ◽  
Jianwei Zhong ◽  
Honghua Liao ◽  
...  

2019 ◽  
Vol 631 (4) ◽  
pp. 042031
Author(s):  
Guanglei Li ◽  
Shuai Yuan ◽  
Fei Jin ◽  
Xiaoliang Liu ◽  
Peng Zhao

EPE Journal ◽  
2010 ◽  
Vol 20 (3) ◽  
pp. 48-58
Author(s):  
Xiangwu Yan ◽  
Giri Venkataramanan ◽  
P.S. Flannery ◽  
Yang Wang ◽  
Qing Dong

Sign in / Sign up

Export Citation Format

Share Document