Viewpoint on “Dissolvable fluidic time delays for programming multi-step assays in instrument-free paper diagnostics”

Lab on a Chip ◽  
2013 ◽  
Vol 13 (20) ◽  
pp. 4004 ◽  
Author(s):  
George M. Whitesides
Lab on a Chip ◽  
2013 ◽  
Vol 13 (14) ◽  
pp. 2840 ◽  
Author(s):  
Barry Lutz ◽  
Tinny Liang ◽  
Elain Fu ◽  
Sujatha Ramachandran ◽  
Peter Kauffman ◽  
...  

The Analyst ◽  
2021 ◽  
Author(s):  
Michael J Hertaeg ◽  
Vidhishri Kesarawani ◽  
Heather McLiesh ◽  
Julia Walker ◽  
Simon Robert Corrie ◽  
...  

Identification of specific antibodies in patient plasma is an essential part of many diagnostic procedures and is critical for safe blood transfusion. Current techniques require laboratory infrastructure and long turnaround...


Author(s):  
Fransiskus Lauson Matondang ◽  
Rosnani Ginting

PT XYZ sering mengalami keterlambatan waktu karena dalam setiap keterlambatan yang dilakukan selalu ada penalty yang diberikan kepada perusahaan dan hal ini mengakibatkan tambahan biaya , oleh karena itu hal ini harus dihindari dengan membuat penjadwalan yang efisien, dalam hal ini dilakukanlah perbaikan dengan meminimisasi waktu penyelesaian maksimum Cmax pada mesin paralel yang berpola aliran flowshop (dan tidak boleh dilakukan interupsi yang dilakukan pada pekerjaan yang sedang diproses, untuk melakukan pekerjaan lainnya, satu lintasan hanya memproduksi satu produk dan hanya satu produk juga yang dikerjakan secara langsung. Waktu penyelesaian yang berbeda dari setiap mesin dengan pengerjaannya juga adalah masalah yang dihadapi untuk menjadikan mesin mesin ini sesuai menjadi satu penjadwalan yang terintegrasi dengan metode integer programming yang membuat penjadwalan dengan konsep riset operasi dengan metode pendekatan 0-1 utuk menjadi lebih efisien lagi , dihasilkan minimisasi keterlambatan total penyelesaian order dengan 42,28 menit lebih baik dari sebelumnya.   PT XYZ often experiences time delays because in every delay made there is always a penalty given to the company and this results in additional costs, therefore this must be avoided by making efficient scheduling, in this case repairs are carried out by minimizing the maximum completion time of Cmax on parallel machines that are patterned with flowshop flow (and no interruptions should be carried out on the work being processed, to do other work, one track only produces one product and only one product is directly worked. Different completion times of each machine with the workmanship is also the problem faced to make this machine suitable to be one scheduling integrated with integer programming methods that makes scheduling with the operational research concept with the 0-1 approach method to be more efficient, resulting in minimization of the delay in the total settlement of orders with 42.28 minutes was better than before.


2018 ◽  
Author(s):  
Shanyouming Sun ◽  
Shangsheng Feng ◽  
Feng Xu ◽  
Changchun Ji ◽  
Meng Shi ◽  
...  

Author(s):  
Corentin Briat ◽  
Olivier Sename ◽  
Jean-Francois Lafay
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document