scholarly journals First experiences with the ATLAS pixel detector control system at the combined test beam 2004

Author(s):  
Martin Imhäuser ◽  
Karl-Heinz Becks ◽  
Tobias Henß ◽  
Susanne Kersten ◽  
Peter Mättig ◽  
...  
2016 ◽  
Vol 11 (11) ◽  
pp. C11004-C11004 ◽  
Author(s):  
N. Lehmann ◽  
M. Karagounis ◽  
S. Kersten ◽  
C. Zeitnitz

2013 ◽  
Vol 60 (2) ◽  
pp. 1265-1271 ◽  
Author(s):  
Tobias Henss ◽  
Dennis Huning ◽  
Susanne Kersten ◽  
Peter Maettig ◽  
Markus Mechtel ◽  
...  

Author(s):  
Tobias Henss ◽  
Dennis Huning ◽  
Susanne Kersten ◽  
Peter Maettig ◽  
Markus Mechtel ◽  
...  

2007 ◽  
Vol 2 (05) ◽  
pp. P05006-P05006 ◽  
Author(s):  
T Henss ◽  
A Andreani ◽  
J Boek ◽  
G Boyd ◽  
M Citterio ◽  
...  

2007 ◽  
Vol 2 (04) ◽  
pp. P04008-P04008 ◽  
Author(s):  
I A Cali ◽  
S Ceresa ◽  
A Kluge ◽  
M Krivda ◽  
P Riedler ◽  
...  

Author(s):  
Joachim Schultes ◽  
Karl-Heinz Becks ◽  
Tobias Flick ◽  
Tobias Henß ◽  
Martin Imhäuser ◽  
...  

2020 ◽  
Author(s):  
Alexander Walsemann ◽  
Rizwan Ahmad ◽  
Susanne Kersten ◽  
Peter Kind ◽  
Niklaus Lehmann ◽  
...  

2019 ◽  
Vol 214 ◽  
pp. 02012
Author(s):  
Vladimir Ivanchenko ◽  
Sunanda Banerjee

We report on the status of the CMS full simulation software for Run 2 operations of the LHC. Initially, Geant4 10.0p02 was used and about 16 billion events were produced for analysis of 2015-2016 data. In 2017, the CMS detector was updated with a new tracking pixel detector, a modified hadronic calorimeter electronics, and extra muon detectors added. Corresponding modifications were introduced in the full simulation and Geant4 10.2p02 was adopted for 2017 simulation productions; that includes an improved Geant4 for multi-threaded mode, which became the default for 2017. For the 2018 Monte Carlo productions, the full simulation has been updated further. The new Geant4 version 10.4 is used, adopted for the production after detailed validations using test-beam and collision data. The results of validations will be described in details. Several aspects of the migration to Geant4 10.4 and modifications in CMSSW simulation software will be also discussed.


2014 ◽  
Vol 977 ◽  
pp. 334-337
Author(s):  
Xi Lei ◽  
Gui Zhi Xu ◽  
Ke Zheng Xing

As a flexible AC transmission system equipment, controlled shunt reactor is becoming increasingly important in the grid with the development of EHV / UHV transmission systems. Since currently rated voltage of controlled shunt reactor has developed to 1100kV, as its capacity control system, or valve-control system, stability and reliability test is very important. In this paper, the test circuit and method for the valve-control system in the laboratory or the test station for combined adjustment test is put forward. By adjustment of power supply and the device parameter, the valve-control system can put the voltage and current of the device to be the same as the on-set operation. Actual test of the world's first 1100kV controlled shunt reactor valve-control system shows that, the test method in this paper is correct and feasible, and the objective of assessment can be achieved.


Sign in / Sign up

Export Citation Format

Share Document