Bromide and chloride tracer application to determine sufficiency of plot size and well depth placement to capture preferential flow and solute leaching
2012 ◽
Vol 9
(2)
◽
pp. 2245-2282
◽
Keyword(s):
2000 ◽
Vol 43
(3-4)
◽
pp. 191-209
◽
Keyword(s):
2012 ◽
Vol 16
(7)
◽
pp. 2069-2083
◽
Keyword(s):
2020 ◽
Vol 15
(1)
◽
pp. 93-102
Keyword(s):
2020 ◽
Vol 85
(769)
◽
pp. 555-565
1963 ◽
Vol 55
(2)
◽
pp. 197-199
◽