Deciding feasibility of a booking in the European gas market on a cycle is in P for the case of passive networks
2013 ◽
pp. 23-40
◽
Keyword(s):
2013 ◽
2012 ◽
Vol 12
(12)
◽
pp. 1877-1891
◽
Keyword(s):