Safety considerations during different stages of a project life cycle in the manufacturing industry

Author(s):  
Sanna Nenonen ◽  
Jouni Kivistö-Rahnasto ◽  
Juha Vasara
2018 ◽  
Vol 49 (2) ◽  
pp. 165-175 ◽  
Author(s):  
Wen Pan ◽  
Bahriye Ilhan ◽  
Thomas Bock

When compared to the manufacturing industry, the advances of intelligent and seamless project management approaches lag behind in the construction industry. This is due to the complexity of the construction projects as well as various stakeholders who acquire specific interest of the project. For instance, public building construction has many sub-tasks and numerous systematised working processes such as planning, mobilisation, scheduling, procurement and controlling. The management of the processes of each phase of the project life cycle is of great importance in order to prevent project delay and cost overrun. A particular importance is required if construction robotics is involved since precise process and scheduling information as well as feedback are critical to ensure each task is completed accordingly. This paper proposes a holistic system approach, which focuses on the process-oriented management for on-site construction. To succeed, the Process Information Modelling (PIM) concept is introduced. The main goal of PIM is to integrate Building Information Modelling (BIM) for extensible solutions with a process-based database platform, which allows for smooth data transfer and supports continuous data sharing among all stakeholders. The overall aim is to develop a collaborative way of planning, designing, producing, assembling and managing the entire project life cycle strategy. Digital documentation, simulation and real-time data are produced progressively to facilitate decision-making. A case study applying the PIM concept for the façade painting task by a painting robot for an on-going consultancy project commissioned by the construction industry council (CIC) in Hong Kong is presented. This paper is the revised version of the paper that has been published in the proceedings of the Creative Construction Conference 2018 (Pan et al., 2018).


2021 ◽  
pp. 875697282199534
Author(s):  
Natalya Sergeeva ◽  
Graham M. Winch

This article develops a framework for applying organizational narrative theory to understand project narratives that potentially perform and change the future. Project narratives are temporal but often get repeated throughout the project life cycle to stabilize meaning, and could be about project mission, vision, identity, value creation, and so forth. Project narratives have important implications for organizational identity and image crafting. This article differentiates among different types of project narratives in relation to a project life cycle, providing case studies of project narratives on three major UK rail projects. We then set out the future research agenda into project narrative work.


2017 ◽  
Vol 7 (4) ◽  
pp. 76
Author(s):  
Prince Destiny Ugo

A fundamental principle of project quality management is that quality is planned into project and not inspected through project. In the context of host communities in developing countries with mineral exploration activities construction projects and contracts generally is a key provider of employment in both short, medium and long term and particularly for the locals, therefore the incorporation of quality management systems in project life cycle is paramount for sustainable development. Ensuring project quality plays an important role in socio-economic development of people as it provides the most basic infrastructure that promotes economic activities. Quality management systems (QMS) has significant value relating to project quality and cost reduction and a comprehensive quality management culture can promote project success, mutual beneficial relationship and organisational sustainability. This study provides empirical findings emanating from local vendor(s) understanding, compliance and implementation of quality management systems in a multinational oil company (MNOC) community assisted projects. The study utilised SPSS version 22 for the statistical data analysis and Goodness-of-fit-test interrogated the assumption that contractors are not complying with quality management systems in project execution. The study found inter alia that 65% of the vendors are registered as closed corporation (sole proprietorship), 15% were limited liability companies, while 20% belong to other category such as subcontractors. Furthermore, 98% of the 222 respondent are yet to develop a quality manual and a conceptual nominated vendor system (NVS) project quality model was developed to improve the contract award and project management status quo, with emphasis on the need for integration of quality management systems in project life cycle for the oil and gas host communities.


2012 ◽  
Vol 8 (1) ◽  
pp. 34-48 ◽  
Author(s):  
Jie Li ◽  
Patrick Zou

To fulfil the increasing demands of the public,Public Private Partnership (PPP) has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP). First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.


Sign in / Sign up

Export Citation Format

Share Document