scholarly journals A Study on the Development of leisure boat's Hull Stress Monitoring System using AWG

Author(s):  
Nam-Seon Kang ◽  
Hyen-Woo Kim
IRC-SET 2020 ◽  
2021 ◽  
pp. 623-633
Author(s):  
Siew Woon Ong ◽  
Raghav Sundar ◽  
Aishwarya Bandla ◽  
Noori Kim

IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 228236-228244
Author(s):  
Michal T. Tomczak ◽  
Marek Wojcikowski ◽  
Bogdan Pankiewicz ◽  
Jacek Lubinski ◽  
Jakub Majchrowicz ◽  
...  

2013 ◽  
Vol 9 (11) ◽  
pp. 978313 ◽  
Author(s):  
S. Hou ◽  
Y. Yu ◽  
H. B. Zhang ◽  
X. Q. Mao ◽  
J. P. Ou

2012 ◽  
Vol 170-173 ◽  
pp. 2464-2467
Author(s):  
Zhi Guang Chen ◽  
Chao Kui Qin ◽  
Ye Teng Qiao ◽  
Qin Xia

The ground settlement caused by high-rise buildings is prominent increasingly with the rapid development of city construction, and will have negative influence on the surrounding gas pipelines. In this paper, an on-site monitoring system for settlement and stress-strain of buried gas pipeline is established, located in the neighboring area of Shanghai Center Tower, which is being built and will be the tallest building in china. The continuous online, real-time monitoring of stress changes and pipeline settlement can be realized. With the system of GPRS automatically data acquisition and wireless remote transmissions are achieved. Field test testify the effectiveness of the system, also shows that significant settlement and strain exist in the test pipe, and long-time monitoring and analysis is needed


2012 ◽  
Vol 226-228 ◽  
pp. 2124-2127
Author(s):  
Jun Pu Wang ◽  
Fu Wan ◽  
Jiong Liu ◽  
Hong Xiang Sun ◽  
Hui Zhang

The importance and urgency for security condition monitoring of the in-service derrick is more and more people paying attention. Based on the FBG sensing technology developed a derrick stress monitoring system. The derrick stress monitoring system, composed by the derrick, a certain number of series of FBG sensors, sensor cables, signal demodulation devices, a portable computer that including a central processing and control platform. Carrying out study in the the ZJ70 model derrick. The experimental results show that the set of strain measurement system has good linear characteristics, repeatability and high sensitivity. Can satisfy the derrick stress monitoring requirement, can realize derrick stress real-time, online, continuous monitoring, expanding the development and application of optical fiber sensing technology in the field of the derrick structure monitoring.


Sign in / Sign up

Export Citation Format

Share Document