Study on the Whole Process Risk Management System of Power Grid Construction Projects

2012 ◽  
Vol 8 (8) ◽  
Author(s):  
Zizhi Xu ◽  
Jinpeng Liu ◽  
Xin Lu
2020 ◽  
Vol 8 (2) ◽  
pp. 237-243
Author(s):  
Oğuzhan Yavuz Bayraktar

The major requirement of every construction project is meeting client’s need of cost, quality and time. However, the construction industry is overwhelmed with risks more than any other industry due to the fact that they are present in every activity from design to completion. These risks need to be controlled early or face the possibility of cost overruns, time delays and poor quality work leading to displeasure of client and public. Although risk management in construction projects is a very important issue in terms of the firms operating in the construction sector, it has not yet gained clarity and prevalence in our country. Within the scope of this research, the aim of this research is to introduce the risk management system as a concept and to classify the risk in construction projects and to demonstrate the risk management techniques. Risk management system is a cyclic process. In the monitoring and control phase of applied risk responding strategies, some of the risks will be eliminated or reduced, some of unforeseen risks will appear and analysis steps will be realized again. At the end of the project, determination of to what degree project aims and targets have been reached and documentation of risk management system after evaluation regarding to the project will enable the company to use project risk management system more effectively and usefully in the projects undertaken later. Due to construction activities, processes, environment and organization’s structures, construction industry and the clients are broadly in relation with high risk degrees. Therefore, it is highly important for our country’s firms in construction industry to give necessary significance to project risk management idea and system and to consider them as a basic function of the projects for permanence of their enterprise existence.


2020 ◽  
Vol 8 (2) ◽  
pp. 237-243
Author(s):  
Oğuzhan Yavuz Bayraktar

The major requirement of every construction project is meeting client’s need of cost, quality and time. However, the construction industry is overwhelmed with risks more than any other industry due to the fact that they are present in every activity from design to completion. These risks need to be controlled early or face the possibility of cost overruns, time delays and poor quality work leading to displeasure of client and public. Although risk management in construction projects is a very important issue in terms of the firms operating in the construction sector, it has not yet gained clarity and prevalence in our country. Within the scope of this research, the aim of this research is to introduce the risk management system as a concept and to classify the risk in construction projects and to demonstrate the risk management techniques. Risk management system is a cyclic process. In the monitoring and control phase of applied risk responding strategies, some of the risks will be eliminated or reduced, some of unforeseen risks will appear and analysis steps will be realized again. At the end of the project, determination of to what degree project aims and targets have been reached and documentation of risk management system after evaluation regarding to the project will enable the company to use project risk management system more effectively and usefully in the projects undertaken later. Due to construction activities, processes, environment and organization’s structures, construction industry and the clients are broadly in relation with high risk degrees. Therefore, it is highly important for our country’s firms in construction industry to give necessary significance to project risk management idea and system and to consider them as a basic function of the projects for permanence of their enterprise existence.


2019 ◽  
Vol 288 ◽  
pp. 02001
Author(s):  
ZHAI Yi ◽  
SUN Gang ◽  
Li Bin ◽  
ZHU Kaimin ◽  
Wang Qiang

In this article, the Process Fault Tree Analysis (PFTA) method is researched, which is about to the risk management of spacecraft Assembly Integration and Test (AIT) process. The method of how to identify the top event and bottom event of Spacecraft AIT process risk and the method of how to assess the risk severity of the bottom event is introduced. The model of risk control matrix is established. From the responsibilities, tools, methods, monitor and other dimensions about the post roles involved of the AIT process, how to establish a risk management system based on the identification, assessment, analysis and control of the whole AIT process is researched. In this risk management system, through technology subject, quantitative topic, process improve, Quality Control (QC) subjects, implementation of product assurance elements, writing Standard Operating procedure (SOP), maintaining system documents, combing knowledge and operation taboo items and other method is used.


2021 ◽  
Vol 266 ◽  
pp. 06001
Author(s):  
A.S. Altemirova ◽  
I.V. Burenina

The purpose of this article is to select and justify the optimal contract model for one of the largest investment and construction projects of PJSC based on a preliminary assessment of the project under several alternative contracts. To achieve this goal, the following results were obtained: first, a classification of contracts for investment and construction projects (ICP) was developed, adapted to the specifics of the oil and gas business, second, the process steps for planning the contract model of oil and gas construction projects were formed, and third, a conclusion was made about the feasibility of using a particular contract model in terms of the project economy, its timing, the quality of decisions at each stage, and the risk management system.


2020 ◽  
Vol 22 (1) ◽  
pp. 59-63
Author(s):  
Ihor Nestoryshen ◽  
◽  
Ivan Berezhnyuk ◽  
Alina Brendak ◽  
◽  
...  

Introduction. The article emphasizes that the current features of the implementation of foreign economic activity require consideration of two factors that are contradictory to each other. In particular, on the one hand, the growth of external threats is forcing the governments of many countries to tighten control measures when crossing the state border of goods and commercial vehicles. On the other hand, according to international conventions and agreements (Kyoto Convention, WMO Framework Standards for Security, WTO Facilitation Agreement), measures to reduce the interference of regulatory authorities in the operational activities of economic operators are envisaged. In this context, the use of risk-oriented customs control tools, which allow simplifying business without reducing the level of national security, is becoming especially important. Purpose. The purpose of the article is to generalize and systematize foreign and domestic approaches to simplification of customs procedures through the use of risk-oriented instruments of customs control, as well as to develop their own proposals for simplification of foreign trade entities in the domestic regulatory field by using subject-oriented criteria. Results. The authors analyzed the provisions of the International Convention on the Simplification and Harmonization of Customs Procedures, the Framework Standards for Security and Facilitation of International Trade, the WTO Agreement on Trade Facilitation, which are provided for significant simplification of international trade procedures by reducing the share of customs inspections and controls. Сustoms security, customs clearance of goods and vehicles on the territory of the subjects of foreign economic activity or in another place permitted by the customs, without the direct participation of customs officials. These measures are based on the widespread use of risk-oriented instruments of customs control. It is noted that some of the provisions of international conventions and agreements on the use of risk-oriented instruments of customs control and simplification of economic operators have been implemented in domestic customs legislation, namely Art. 320 of the Customs Code of Ukraine introduced selective customs control, it is determined that the forms and scope of control sufficient to ensure compliance with legislation on state customs and international treaties of Ukraine in customs clearance are selected by customs (customs posts) based on the results of risk management. Conclusion. The study analyzes the peculiarities of the customs risk management system application in customs control in Ukraine, and offers proposals for the use of subject-oriented criteria of customs control as a simplification for honest economic operators to reduce the selectivity of risk profiles ASUR.