scholarly journals Le Lean manufacturing et le Lean management dans le Six Sigma

2012 ◽  
Vol 31 (4) ◽  
pp. 7-18
Author(s):  
Christian Potie
2020 ◽  
Vol 10 (8) ◽  
pp. 197
Author(s):  
Mariusz Bednarek ◽  
Aleksander Buczacki ◽  
Lukasz Bielakowski ◽  
Bartlomiej Gladysz ◽  
Mariusz Bryke

The article elaborates upon a successful model of postgraduate studies on lean manufacturing. The subject of the research was nine editions of the Kaizen Academy postgraduate studies organized by the Warsaw University of Technology and the Kaizen Institute in the years 2009–2018, that still enjoys interest in the market. A detailed qualitative analysis of this case, followed by a comparative analysis with other post-graduate programs of this type on the national, European, and global level should make it possible to find what is necessary to launch and actively operate for a long time in the (considerably competitive) market of qualification raising programs related to Lean Management (critical success factors). The study has also identified the differences between a successful program, analyzed in detail, and other available programs described in the literature and on the Internet. This has been achieved through a structured analysis of thirty-nine postgraduate programs identified by querying scientific databases and the Google Internet search engine. Best practices and models of postgraduate education on Lean Management have been discussed, and the thirty-nine programs comprising the identified sample have been compared. Considering the very general level of the data available in terms of the organization of postgraduate programs, it has also been assessed if they follow constructivism and experiential learning paradigms. This has been achieved by including the industrial days/visit indicator in the comparison. Given its high value, it has been identified as a success factor of the postgraduate curriculum on Lean Management.


Author(s):  
Chittaranjan Sahay ◽  
Suhash Ghosh ◽  
Pradeep Kumar Bheemarthi

This work describes a strategy to reduce the cost associated with poor quality, by reducing the parts per million defects by Defining, Measuring, Analyzing, Implementing and Controlling (DMAIC) the production process. The method uses a combination of principles of Six Sigma applications, Lean Manufacturing and Shanin Strategy. The process has been used in analyzing the manufacturing lines of a brake lever at a Connecticut automotive components manufacturing company for reducing the cost associated with the production of nonconforming parts. The analysis was carried out with the help of the data collected on nonconformance parts and the application of phase change rules from DMAIC (+). Data analysis was carried out on statistical process control softwares, MINITAB and SPC XL 2000. Although, the problem of tight bushing existed on only one line of the brake lever assembly, this problem solving approach has solved the tight bushing problems on all assembly and alternates lines in a time- and cost-effective way.


2016 ◽  
Vol 12 (2) ◽  
pp. 169-182 ◽  
Author(s):  
Ibrahim Alhuraish ◽  
Christian Robledo ◽  
Abdessamad Kobi

2018 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mrigendra Nath Mishra

Purpose The purpose of this paper is analysis of Green and Lean Six Sigma, based on the success factors in its use through a well thought-out literature review, is being planned; a framework has been integrated in a productive manner with the Green and Lean and Six Sigma methods so as to incorporate and actualize the execution. Design/methodology/approach The methodology consists of comparative investigation of Green, Lean management and Six Sigma using open written work, essential analysis at data and master experience of the researchers. To achieve this goal, a significant review of the existing literature of the subject area has been done to prepare a framework in view of the critical success factors. A study was arranged and flowed survey from various businesses utilizing John’s Macintosh Project (JMP) statistical software. Findings The paper establishes the distinguishing proof of five success factors with their situational importance and shows that the integrated Green and Lean Six Sigma can drive the organizations to optimize their resources and cost of services or productions. Practical implications A Green and Lean Six Sigma organization would take profits by the use of the proposed framework in an alternate extent of organizations should be dynamic. The organizations should assess their shortcomings and qualities, set needs and perceive objectives for fruitful implementation. Originality/value Suggestions are being made regarding thoughts and methods that would constitute a Green and Lean Six Sigma organization. The suggested framework compare the method for improvements that may occur in organizations while implementation of the Green and Lean management or Six Sigma.


2014 ◽  
Vol 8 (13) ◽  
pp. 1558-1562 ◽  
Author(s):  
M.C. Prieto-avalos ◽  
C.R. Navarro-gonzalez ◽  
A. Gonzalez-angeles ◽  
S.V. Medina-leon

2016 ◽  
pp. 163-180
Author(s):  
Justyna Maciąg
Keyword(s):  
Iso 9001 ◽  

Wyzwaniem dla szkoły wyższej w XXI wieku stają się: jakość usług oraz skuteczność, efektywność i elastyczność działania. W odpowiedzi na nie szkoły dokonują restrukturyzacji systemów zarządzania, wdrażając nowoczesne koncepcje i metody oparte na podejściu procesowym, takie jak: TQM, w tym EFQM, ISO 9001, Lean Management, Six Sigma, reengineering, benchmarking, outsourcing, centra usług wspólnych. Celem artykułu jest prezentacja dotychczasowego dorobku teoretycznego oraz praktycznego z zakresu problematyki wykorzystania koncepcji i metod zarządzania opartych na podejściu procesowym w zarządzaniu szkołami wyższymi. Artykuł jest oparty na analizie literatury przedmiotu oraz badaniach własnych w zakresie wdrażania podejścia procesowego w szkołach wyższych. Efektem jest wskazanie na podstawowe kwestie podejmowane w badaniach, przesłanki i bariery oraz luki badawcze w tym obszarze.


OPSI ◽  
2018 ◽  
Vol 11 (1) ◽  
pp. 14 ◽  
Author(s):  
Almer Panji Pradana ◽  
Mochammad Chaeron ◽  
Muhammad Shodiq Abdul Khanan

CV Marga Jaya (Pabrik II) adalah perusahaan yang bergerak di bidang pembuatan paving/conblock secara masal. CV Marga Jaya (Pabrik II) selalu berusaha mengurangi pemborosan yang terjadi selama proses produksi paving/conblock. Pemborosan yang terjadi antari lain, adanya produksi berlebih, transportasi, waktu menunggu, dan cacat yang berlebih.  Lean Manufacaturing merupakan pendekatan yang bertujuan untuk merampingkan proses dengan mengurangi pemborosan yang terjadi selama proses produksi. Pendekatan konsep lean manufacturing dimulai dengan membuat big picture mapping, dilanjutkan dengan waste assessment model (WAM), diagram cause and effects, value stream analysis tools (VALSAT), usulan perbaikan waste yang terjadi, dan pembuatan descrete event simulation (DES). Hasil yang didapat bahwa waktu menunggu yang terjadi diperbaiki dengan menggunakan conveyor, produksi berlebih yang terjadi diperbaiki dengan melakukan perencanaan produksi, dan cacat berlebih yang terjadi diperbaiki dengan menggunakan 5W+1H dengan sebelumnya menggunakan konsep lean six sigma dan didapat nilai sigma sebesar 4,31 sigma. Simulasi proses menunjukkan dengan mengurangi pemborosan, kemampuan produksi naik 15,36% (penjemuran 30 hari) dan 147,20% (penjemuran 7 hari).


Sign in / Sign up

Export Citation Format

Share Document