scholarly journals Maximizing the Total Number of on TIME Jobs on Identical Machines

Author(s):  
Hairong Zhao
Keyword(s):  
1986 ◽  
Vol 23 (03) ◽  
pp. 841-847 ◽  
Author(s):  
R. R. Weber ◽  
P. Varaiya ◽  
J. Walrand

A number of jobs are to be processed using a number of identical machines which operate in parallel. The processing times of the jobs are stochastic, but have known distributions which are stochastically ordered. A reward r(t) is acquired when a job is completed at time t. The function r(t) is assumed to be convex and decreasing in t. It is shown that within the class of non-preemptive scheduling strategies the strategy SEPT maximizes the expected total reward. This strategy is one which whenever a machine becomes available starts processing the remaining job with the shortest expected processing time. In particular, for r(t) = – t, this strategy minimizes the expected flowtime.


Sign in / Sign up

Export Citation Format

Share Document