Discussion on Present Situation and Countermeasures of Technical Management in Construction Site of Housing Construction Project

2021 ◽  
2019 ◽  
Vol 3 (3) ◽  
pp. 129
Author(s):  
Yingying Wei

<p>Construction project is a project involving many kinds of jobs and a large number of workers. The pros and cons of the construction project site construction management and the measures level directly influences the construction duration, cost and quality. This paper discusses the function of strengthening construction site construction management, the problems existing in construction site construction management and the measures to improve construction site construction management., with a view to providing some meaningful reference for our country's related research of construction project site construction management measures.</p>


2014 ◽  
Vol 529 ◽  
pp. 755-758
Author(s):  
A Ling Zhang ◽  
Dan Ni Qi

Along with large national investment in infrastructure construction, the mileage of the highway, which is one of the infrastructures, has increased year by year. There are many kinds of artificial filling foundation treatment methods for housing construction project in mountain highway facilities. This paper, combined with the engineering example, focuses on the dynamic compaction method and the replacement method.


2014 ◽  
Vol 687-691 ◽  
pp. 4511-4514
Author(s):  
Zhan Gang Su

Housing construction project is closely related to people's production and living, this paper analyzes the basic method and construction quality control theory, illustrates the importance and the importance of quality management and strengthens the construction phase, and proposes to strengthen the system construction, strengthen the internal supervision and related Suggestions.


2019 ◽  
Vol 276 ◽  
pp. 02021
Author(s):  
Ferdinand Fassa ◽  
Irma Paramita Sofia

The construction industry has a huge contribution to economic growth in the world, including Indonesia. Massive urban development occurs as a result of significant population growth. Along with the rapid development, safety issue in the construction site is often neglected. In 2017, there were found that more than 123 thousand cases of construction site accidents have happened. This numbers has increased by almost 20% compared with the number of accidents in 2016. The purpose of this study is to identify significant safety indicators affecting the construction project in Tangerang Selatan. Based on the literature review, a list of 22 safety indicators was produced. These indicators were used in the questionnaire. The main contribution of this paper is providing safety indicators ranking that affects construction work around Tangerang Selatan. The subject of this research includes contractor and consultant experts who work in construction project around Tangerang Selatan. From the survey, we obtained 41 valid responses which then were analyzed using FAII. As a result, we found that the indicator “the company provides safety training for each worker to act safely” has been considered as the most important safety indicator. It is followed by “the contractor always provides PPE such as helmets, boots, gloves, masks, and other tools that can get me out of an accident”. Then the third result is “there are safeguards on the project site; safety signs, fire extinguishers, and security fences”.


2018 ◽  
Vol 53 ◽  
pp. 03082
Author(s):  
Jianxun Deng ◽  
Jing Chen

This article focuses on the damage to the construction project caused by the strong typhoon “Moranti” No. 14 of 2016 to the coastal city of Xiamen, and further analyzes the characteristics of the extreme typhoon climate, like strong destruction,extensive damage and obvious characteristics of the centralization, and the causes of the damage to the construction project. Leading to the conclusion that the risk items in the construction site mainly include personnel, scaffolds, and mechanical and electrical equipment, etc. Combined with the impact factors of duration, structure scale, economic exposure, and corporate management level, establishing the criteria for judging the extreme typhoon climate risk pre-control level and calculating the comprehensive level according to the level of each element and the weight distribution, and then, put forward pre-control measures and recommendations accordingly for government decision-making and construction companies' reference.


2012 ◽  
Vol 209-211 ◽  
pp. 1294-1297
Author(s):  
Zhen Wen ◽  
Qi Lan Zhou

FIDIC contract terms content is quite widespread, it cover project management, technology, economy, law, insurance and so on. It is a normative document been revolve around construction project consultation and management. FIDIC made very detailed regulations to construction management three fields (investment control, quality control and progress control) from law, management, economy, technology and other fields. FIDIC had been became internationally recognized standardization document. It could be use every stage of construction management. This paper through analyze FIDIC contract and combine current construction management state,finally give some advices for construction management.


Sign in / Sign up

Export Citation Format

Share Document