Research on Construction Diversion and Cofferdam Technology in Water Conservancy and Hydropower Construction

2021 ◽  
2020 ◽  
Vol 145 ◽  
pp. 02078
Author(s):  
Yang Qingqing ◽  
Du Chengrong

The determination of diversion risk in the construction of water conservancy and hydropower projects is a key problem related to the guarantee of project safety, saving project investment, giving full play to benefits in advance and facilitating construction. According to the design data, considering the influence of the uncertain factors such as hydrology and hydraulics, this paper analyses the relationship between the elevation of the upstream cofferdam and the upstream design water level, uses the Monte Carlo method to simulate the construction flood process and the discharge capacity of the diversion buildings, makes statistical analysis and determines the risk corresponding to the upstream water level distribution of the cofferdam and the water retaining height of the cofferdam, and establishes the calculation model of the construction diversion risk.


2014 ◽  
Vol 1065-1069 ◽  
pp. 2424-2427
Author(s):  
Xin Fu Chen ◽  
Peng Cheng ◽  
Lang Wu

In this paper, Management of construction projects that the Water Conservancy and Hydropower Construction Project Management to promote the important role of value engineering and practical significance, for the construction of China's water conservancy and hydropower project management to provide a theoretical reference and inspiration.


Sign in / Sign up

Export Citation Format

Share Document