Research on Water Conservancy and Hydropower Project Management and Construction Quality Control

2021 ◽  
2014 ◽  
Vol 1065-1069 ◽  
pp. 2424-2427
Author(s):  
Xin Fu Chen ◽  
Peng Cheng ◽  
Lang Wu

In this paper, Management of construction projects that the Water Conservancy and Hydropower Construction Project Management to promote the important role of value engineering and practical significance, for the construction of China's water conservancy and hydropower project management to provide a theoretical reference and inspiration.


2014 ◽  
Vol 1056 ◽  
pp. 142-145
Author(s):  
Lei Liu

The civil engineering construction is a very complicated production activities. In the whole construction process need to consume a large amount of manpower, consume a large amount of materials, use a lot of equipment, also need to deal with complex technical problems a lot. So this is for the civil engineering construction project management have strict requirements. This paper from the quality control, schedule control, cost control three aspects of the civil engineering construction project management analysis. Quality control Construction quality is the foundation of project management work, is the basic requirement of the construction of the project. Have important influence on the quality of the whole construction quality of engineering quality control. Because the civil engineering construction comprises a plurality of procedures, quality control is usually divided in time for the preparation of construction quality control, the quality control of construction process and quality control of completion and acceptance of three stages. Preparation of construction quality control of the main content is: each enterprise carefully check to participate in the project entity construction qualification, including professional subcontracting subcontracting, materialsand material suppliers; according to the basic principles of quality management, review project quality plan, quality requirements, implementationplan, including examination, treatment and other sectors to establish quality control preliminary scheme;, once appear quality problem, can quickly take thepreliminary scheme, guarantee the quality of the whole project. Figure 1 Quality process control before, during and after the event.


2013 ◽  
Vol 416-417 ◽  
pp. 2083-2086
Author(s):  
Hong Bin Tao

Since reform and opening, water conservancy and hydropower construction industry become more competitive. Water conservancy and hydropower project construction involve a wide range, which is an extremely complex and comprehensive process. It coupled with the production flow of water conservancy and hydropower projects, structure type, quality requirements, construction methods, construction period, and the natural conditions in different situations, which all directly affect the construction quality of the project. This article outlines the construction of water conservancy and hydropower project management features, and discussed ways and means of quality control.