Key Points of Whole Process Control of Construction Cost

2021 ◽  
2017 ◽  
Vol 898 ◽  
pp. 1063-1068
Author(s):  
Deng Zun Yao ◽  
Zhi Wen Li ◽  
Jian Wu Liu ◽  
Lin Chen

In the pipeline construction, the girth welds tend to be the weakness because of defects and microstructural heterogeneities. The importance of suitable assessment of various defects in the weld is not only to prevent the cracks from unstable growth to cause catastrophic accident but also can effectively reduce the weld repair to reduce construction cost. Although many welding defects assessment methods and codes have been applied in this field, there are many differences among them. In this paper, the application of weld defect assessment methods was extensively studied. The key points of ECA applications, such as the pipeline axial stress and toughness, have been introduced. Furthermore, some suggestions were given on the application of girth weld ECA assessment.


2014 ◽  
Vol 919-921 ◽  
pp. 199-202
Author(s):  
Lan Lan Zhang ◽  
Xiao Guang Song ◽  
Jing Juan Zhang

During the past two centuries, steel structure has become one of the most popular structural system. How to balance the construction cost, structural properties and other factors is an important aspect needed to be addressed. This paper describes the whole process of performance based optimized design of steel structure. First, the methods on the shape and sizing optimization, cost and others are introduced. Then, the multi-object optimization of steel structure is presented, in which the main aspects of the optimizations are studied. Finally, the design principle and the analytical steps for the multi-object optimization of steel structures are discussed. This paper can be references for the optimization design of steel structures.


2020 ◽  
Vol 4 (2) ◽  
pp. 42
Author(s):  
Jian Yin ◽  
Huiyun Zhou ◽  
Jing Yang

<p>With the development of economic globalization, the scale of international trade continues to expand. Ports are very important for cross regional transactions. However, the construction cost is also very high in the actual construction process because port engineering is a relatively large project. Cost management can effectively control the cost and improve the economic benefits of port engineering project construction. The traditional cost management model has been unable to meet the needs because the construction cost control is a dynamic process and runs through the whole process of the project. BIM information technology is a technology with engineering digital model as the core. Based on BIM, this article studies the refined cost management of port engineering project, and aims to provide some help for relevant practitioners.</p>


Author(s):  
Yanlun Shi ◽  
Jian Wang ◽  
Yongbo Qu ◽  
Zhihong Lang ◽  
Hongjiao Liu

 Since the reform and opening up, the national economy of our country has been developing steadily and steadily, and the overall level of urbanization and industrialization has been upgrading rapidly.Behind its growth is increasingly serious environmental problems, and environmental protection engineering as a key project of ecological environment governance, its process management level and quality are related to the balance of the entire ecological environment.If we want to further improve the overall efficiency and quality of the project and fundamentally realize the standardization and standardization of the environmental protection project, we should strengthen the whole process control and management of the environmental protection project, and promote the full coverage of the whole process control management.In view of this, this article on the importance of the whole process control management focuses on environmental protection projects, according to the actual management of risks in the process to carry on the understanding and control, and make proper treatment, to strengthen risk management and process control of environmental engineering[1].


2018 ◽  
Vol 2 (1) ◽  
Author(s):  
Yanlun Shi ◽  
Jian Wang ◽  
Yongbo Qu ◽  
Zhihong Lang ◽  
Hongjiao Liu

 Since the reform and opening up, the national economy of our country has been developing steadily and steadily, and the overall level of urbanization and industrialization has been upgrading rapidly.Behind its growth is increasingly serious environmental problems, and environmental protection engineering as a key project of ecological environment governance, its process management level and quality are related to the balance of the entire ecological environment.If we want to further improve the overall efficiency and quality of the project and fundamentally realize the standardization and standardization of the environmental protection project, we should strengthen the whole process control and management of the environmental protection project, and promote the full coverage of the whole process control management.In view of this, this article on the importance of the whole process control management focuses on environmental protection projects, according to the actual management of risks in the process to carry on the understanding and control, and make proper treatment, to strengthen risk management and process control of environmental engineering[1].


Sign in / Sign up

Export Citation Format

Share Document