Construction Technology and Key Points of High Piers in Expressway Bridge Engineering

2021 ◽  
2015 ◽  
Vol 4 (4) ◽  
pp. 49
Author(s):  
Chao Chen

<p>Study of steel structure construction technology on high-rise building was needed to strengthen, in order to improve the construction quality and safety of our building, ensure the normal operation of production and living of people. Therefore, the article will analyze the common technology in steel structure construction of high-rise building, and expect able to play a certain reference function.</p>


2011 ◽  
Vol 480-481 ◽  
pp. 1266-1270
Author(s):  
Liu Hui

During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.


Sign in / Sign up

Export Citation Format

Share Document