scholarly journals Better Algorithm of Ordinal Online Schedule for Jobs with Similar Sizes on Two Machines

2019 ◽  
Vol 09 (05) ◽  
pp. 235-243
Author(s):  
Limin Wang ◽  
Rongheng Li ◽  
Yunxia Zhou
Keyword(s):  
GIS Business ◽  
2019 ◽  
Vol 14 (6) ◽  
pp. 577-585
Author(s):  
T. Vivekanandan ◽  
S. Sachithanantham

In inventory control, suitable models for various real life systems are constructed with the objective of determining the optimal inventory level.  A new type of inventory model using the so-called change of distribution property is analyzed in this paper. There are two machines M1 and M2  in series and the output of M1 is the input of M2. Hence a reserve inventory between M1 and M2 is to be maintained. The method of obtaining the optimal size of reserve inventory, assuming cost of excess inventory, cost of shortage and when the rate of consumption of M2  is a constant, has already been attempted.  In this paper, it is assumed that the repair time of M1  is a random variable and the distribution of the same undergoes a change of distribution  after the truncation point X0 , which is taken to be a random variable.  The optimal size of the reserve inventory is obtained under the above said  assumption . Numerical illustrations are also provided.


2021 ◽  
Vol 12 (1) ◽  
pp. 12
Author(s):  
Huan Qu ◽  
Zi Qiang Zhu ◽  
Toru Matsuura ◽  
Dusan Ivanovic ◽  
Takashi Kato ◽  
...  

In this paper, two types of dual permanent magnet (PM) machines, i.e., stator slot dual-PM (SSDPM) machine and split-tooth dual-PM (STDPM) machine, are investigated and compared. Both machines have consequent pole structure with Halbach array PMs. Their difference lies in the position of stator PM. The SSDPM machine has Halbach array PMs in the stator slots, while the STDPM machine has PMs between the split teeth. Torque characteristics, i.e., average torques and torque ripples, of different slot/pole number combinations of the two machines are compared. The 24 stator slots/20 rotor slots/4 armature pole pair (24S20R4Pa) SSDPM machine with distributed windings and the 24 stator slots/10 rotor slots/4 armature pole pair (12S20R4Pa) STDPM machine with concentrated windings are compared under both open-circuit and on-load conditions. The results show that the SSDPM machine is more competitive by delivering higher torque density and higher power density.


2004 ◽  
Vol 30 (1) ◽  
pp. 103-120 ◽  
Author(s):  
Frédéric Guinand ◽  
Aziz Moukrim ◽  
Eric Sanlaville

1985 ◽  
Vol 29 (5) ◽  
pp. 470-474 ◽  
Author(s):  
Paul Green ◽  
Lisa Wei-Haas

The Wizard of Oz technique is an efficient way to examine user interaction with computers and facilitate rapid iterative development of dialog wording and logic. The technique requires two machines linked together, one for the subject and one for the experimenter. In this implementation the experimenter (the “Wizard”), pretending to be a computer, types in complete replies to user queries or presses function keys to which common messages have been assigned (e.g., Fl=“Help is not available”). The software automatically records the dialog and its timing. This paper provides a detailed description of the first implementation of the Oz paradigm for the IBM Personal Computer. It also includes application guidelines, information which is currently missing from the literature.


2014 ◽  
Vol 2014 ◽  
pp. 1-6 ◽  
Author(s):  
Taibo Luo ◽  
Yinfeng Xu

This paper investigates semi-online scheduling problems on two parallel machines under a grade of service (GoS) provision subject to minimize the makespan. We consider three different semi-online versions with knowing the total processing time of the jobs with higherGoSlevel, knowing the total processing time of the jobs with lowerGoSlevel, or knowing both in advance. Respectively, for the three semi-online versions, we develop algorithms with competitive ratios of3/2,20/13, and4/3which are shown to be optimal.


2015 ◽  
Vol 55 (2) ◽  
pp. 128-135 ◽  
Author(s):  
Peter Ondac ◽  
Jan Horacek ◽  
Jakub Seidl ◽  
Petr Vondrácek ◽  
Hans Werner Müller ◽  
...  

<!-- p, li { white-space: pre-wrap; } --><p style="text-indent: 0px; margin: 0px;">In this article we have used the 2D fluid turbulence numerical model, ESEL, to simulate turbulent transport in edge tokamak plasma. Basic plasma parameters from the ASDEX Upgrade and COMPASS tokamaks are used as input for the model, and the output is compared with experimental observations obtained by reciprocating probe measurements from the two machines. Agreements were found in radial profiles of mean plasma potential and temperature, and in a level of density fluctuations. Disagreements, however, were found in the level of plasma potential and temperature fluctuations. This implicates a need for an extension of the ESEL model from 2D to 3D to fully resolve the parallel dynamics, and the coupling from the plasma to the sheath.</p>


2020 ◽  
Vol 27 (4) ◽  
Author(s):  
Diego Carvalho do Nascimento ◽  
Pedro Luiz Ramos ◽  
André Ennes ◽  
Camila Cocolo ◽  
Márcio José Nicola ◽  
...  

Abstract: The present study aimed to analyze factors associated with the equipment failures of the sugarcane harvester, whose machineries has high importance in the harvest process and cost involved. Part of the data was originally provided by a company located in the countryside of Sao Paulo State, from two machines, collected from January 2015 to August 2017, corresponding to 2.5 crops. The overall dataset was obtained from three different sources: a stop-tracking system, which provides the track of a preventive and corrective maintenance historical of the analyzed equipment; telemetry data of the equipment, captured through embedded computer systems, installed in the machine’ type under study, which provide information on its operation; and meteorological data from the Brazilian National Institute of Meteorology. Multivariate analyzes were used such as principal components and multiple regression models, therefore creating a model for prediction considering the next equipment’ break, then pointing to causes of process failures. Thus, the results point to some improvements concerned with individualized reliability scheme in order to reduce the number of corrective stops given the equipment.