Design and Initial Results of EOR and Flow Assurance Lab Tests for K2 Field Development in the Deepwater Gulf of Mexico

Author(s):  
Frank H. Lim ◽  
Eulalia Munoz ◽  
Nikhil B. Joshi
2018 ◽  
Author(s):  
Humoud Almohammad ◽  
Abdullah Al-Derbass ◽  
Abdulaziz Alsubaie ◽  
Mohammed Bumajdad ◽  
Abdulaziz Al-Khamis ◽  
...  

2021 ◽  
Author(s):  
Qasem Dashti ◽  
Saad Matar ◽  
Hanan Abdulrazzaq ◽  
Nouf Al-Shammari ◽  
Francy Franco ◽  
...  

Abstract A network modeling campaign for 15 surface gathering centers involving more than 1800 completion strings has helped to lay out different risks on the existing surface pipeline network facility and improved the screening of different business and action plans for the South East Kuwait (SEK) asset of Kuwait Oil Company. Well and network hydraulic models were created and calibrated to support engineers from field development, planning, and operations teams in evaluating the hydraulics of the production system for the identification of flow assurance problems and system optimization opportunities. Steady-state hydraulic models allowed the analysis of the integrated wells and surface network under multiple operational scenarios, providing an important input to improve the planning and decision-making process. The focus of this study was not only in obtaining an accurate representation of the physical dimension of well and surface network elements, but also in creating a tool that includes standard analytical workflows able to evaluate wells and surface network behavior, thus useful to provide insightful predictive capability and answering the business needs on maintaining oil production and controlling unwanted fluids such as water and gas. For this reason, the model needs to be flexible enough in covering different network operating conditions. With the hydraulic models, the evaluation and diagnosis of the asset for operational problems at well and network level will be faster and more effective, providing reliable solutions in the short- and long-terms. The hydraulic models enable engineers to investigate multiple scenarios to identify constraints and improve the operations performance and the planning process in SEK, with a focus on optimal operational parameters to establish effective wells drawdown, evaluation of artificial lifting requirements, optimal well segregation on gathering centers headers, identification of flow assurance problems and supporting production forecasts to ensure effective production management.


2020 ◽  
Author(s):  
Lawrence Khin Leong Lau ◽  
Kun An ◽  
Xian Di Tang ◽  
Fei Jian Luo ◽  
Yang Yang ◽  
...  

Author(s):  
Jingyun Cheng ◽  
Peimin Cao ◽  
Sherry Xiang

This paper presents a design of a deep draft wet tree semi-submersible with steel catenary risers (SCRs) for 4,000 ft water depth in the Gulf of Mexico (GoM). The integrated system of hull, mooring, and SCRs is discussed. The design challenges of SCRs are highlighted and results of SCR strength and fatigue performance are presented. A comparison study on strength performance of various types of risers under the GoM environment criteria is performed. The assessment of extreme strength responses from various riser and hull configurations provide guidelines for the best hull selection. Sour service requirement creates challenges in the fatigue design of the production riser system at such water depth. Integrated mooring and riser design provides an optimum solution. It’s found that the majority of riser fatigue damage at touch down zone is generated by wave loading & resultant vessel motion and vortex induced vessel motion (VIM). Several fatigue mitigation methods are suggested to improve the riser fatigue performance, such as planned vessel repositioning. The conclusion of this study is that deep draft wet tree semi-submersible with SCRs can be a cost effective solution for field development at 4,000 ft water depth in the Gulf of Mexico.


Author(s):  
Jingyun Cheng ◽  
Peimin Cao

The disconnectable Floating Production Storage and Offloading system (FPSO) is one of the preferred solutions for the deepwater field in the harsh environment and far away from existing pipeline infrastructures. This paper presents a design of steel lazy wave riser (SLWR) system for an internal turret moored disconnectable FPSO in the Gulf of Mexico. The integrated systems of FPSO, disconnectable buoy, riser, and mooring are discussed while focusing on the design challenges of SLWR system. Due to the complexity of SLWR geometry, a systematic configuration approach is introduced based on buoy payload and riser performance criteria. The study includes the strength and fatigue analysis of production, gas export and water injection risers for the connected, disconnecting, and disconnected conditions. The sensitivity of buoy disconnecting due to vessel offset is also presented. It concludes that SLWR with disconnectable FPSO is a feasible and cost effective solution for deepwater field development in the Gulf of Mexico. The study demonstrates the importance of an integrated design approach, and provides guidance for configuring and design of future disconnectable systems with SLWRs.