Life-Cycle-Cost-Based Design Criteria for Gulf of Mexico Minimum Structures
On design criteria for a disconnectable FPSO mooring system associated with expected life-cycle cost
2017 ◽
Vol 13
(4)
◽
pp. 432-442
◽
2001 ◽
Vol 127
(3)
◽
pp. 338-346
◽
2001 ◽
Vol 127
(3)
◽
pp. 330-337
◽
2011 ◽
Vol 4
(5)
◽
pp. 158-161
◽
1983 ◽
Keyword(s):