Wake Wash Risk Assessment of High-Speed Ferry Routes - A Case Study and Suggestions for Model Improvements

Author(s):  
Henrik Kofoed-Hansen ◽  
◽  
Thomas Jensen ◽  
Ole Rene Sorensen ◽  
Jesper Fuchs ◽  
...  
Keyword(s):  
2013 ◽  
Vol 655-657 ◽  
pp. 2335-2339 ◽  
Author(s):  
Bi Hong Lu ◽  
Peng Hua ◽  
Zhen Liang Fu ◽  
Feng Gao

Based on the FMEA and risk assessment analysis method, authors proposed 25 kinds of failure modes about the door system of high-speed train, conducted a risk assessment from the risk grade and criticality. Four kinds of failure modes are obtained with the highest level of risk and criticality in the door system of high-speed train. They are control failure, communication failure, compensator failure and poor function. Four key components, affecting the door system safety of high-speed train, are identified in terms of door control unit, driving device, locking mechanism and platform compensator. Research outcomes can be used in analyzing the failure causes and specific solutions to reduce and avoid the high-speed train operation risk.


2018 ◽  
Author(s):  
Michael H. Azarian

Abstract As counterfeiting techniques and processes grow in sophistication, the methods needed to detect these parts must keep pace. This has the unfortunate effect of raising the costs associated with managing this risk. In order to ensure that the resources devoted to counterfeit detection are commensurate with the potential effects and likelihood of counterfeit part usage in a particular application, a risk based methodology has been adopted for testing of electrical, electronic, and electromechanical (EEE) parts by the SAE AS6171 set of standards. This paper provides an overview of the risk assessment methodology employed within AS6171 to determine the testing that should be utilized to manage the risk associated with the use of a part. A scenario is constructed as a case study to illustrate how multiple solutions exist to address the risk for a particular situation, and the choice of any specific test plan can be made on the basis of practical considerations, such as cost, time, or the availability of particular test equipment.


2000 ◽  
Vol 14 (5) ◽  
pp. 1264-1270 ◽  
Author(s):  
Elisabeth Slooten ◽  
David Fletcher ◽  
Barbara L. Taylor
Keyword(s):  

2020 ◽  
Vol 34 (5) ◽  
pp. 627-640 ◽  
Author(s):  
Shi Xianwu ◽  
Qiu Jufei ◽  
Chen Bingrui ◽  
Zhang Xiaojie ◽  
Guo Haoshuang ◽  
...  

IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Amir Farmahini Farahani ◽  
Kaveh Khalili-Damghani ◽  
Hosein Didehkhani ◽  
Amir Homayoun Sarfaraz ◽  
Mehdi Hajirezaie

Sign in / Sign up

Export Citation Format

Share Document