scholarly journals Research on information models for the construction schedule management based on the IFC standard

Author(s):  
Weirui Xue ◽  
Yaowu Wang ◽  
Qingpeng Man
2014 ◽  
Vol 548-549 ◽  
pp. 1646-1650 ◽  
Author(s):  
Yang Liu ◽  
Yan Li

It has been proved that the construction schedule management was an uncertain problem. Traditional CPM method was a good way to define the total duration and critical paths but can not solve uncertainty. The paper use CPM to define the duration and critical path firstly, then defined the parameters with Delphi and make Monte Carlo simulation. Through simulation results, it is found that the probability to finish the work on time was only 35.3%. The following step is to make sensitivity analysis, through the calculation, the work which has large influence was found and treat as key control points. It is proved that Monte Carlo simulation is useful to solve the problem of construction schedule management.


Author(s):  
Xiaopeng Fang

The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support.


2013 ◽  
Vol 859 ◽  
pp. 284-288
Author(s):  
Yang Liu ◽  
Yan Li

It has been proved that the construction schedule management was an uncertain problem. Traditional CPM method was a good way to define the total duration and critical paths but can not solve uncertainty. The paper use CPM to define the duration and critical path firstly, then defined the parameters with Delphi and make Monte Carlo simulation. Through simulation results, it is found that the probability to finish the work on time was only 68%. The following step is to make sensitivity analysis, through the calculation, the work which has large influence was found and treat as key control points. It is proved that Monte Carlo simulation is useful to solve the problem of construction schedule management.


Sign in / Sign up

Export Citation Format

Share Document