Geoelectrical Soundings and their Relationship to Channel Seepage Areas at the Kaffrein Dam, Jordan

2003 ◽  
Vol 4 (1) ◽  
pp. 28-37 ◽  
Author(s):  
Awni T. Batayneh ◽  
Abdallah S. Al-Zoub ◽  
Mohammad M. Abu-Aja
Keyword(s):  
2011 ◽  
Vol 306-307 ◽  
pp. 942-945
Author(s):  
Wang Lin Li ◽  
Ying Te Li ◽  
Jian Ying Yu

Concrete lining is commonly used in large channel project to fixup soil slope and prevent channel seepage. Concrete lining is a type of thin plates structure which should have the high compression strength, crack resistance and durability. Two new high performance concrete (HPC) are used in lining project of south main channel of Yellow River-crossing project in east-route of the South-to-North Water Diversion Project. One is flyash HPC with manufactured-sand and the other is HPC with cementitious capillary crystalline waterproofing material (CCCW); meanwhile, the mix proportion of flyash HPC with manufactured-sand and HPC with CCCW are recommended. For flyash HPC with manufactured-sand, the recommendatory water-binder ratio is 0.4 and the recommendatory flyash content is 30%. For HPC with CCCW, the recommendatory water-binder ratio is 0.48 and the recommendatory CCCW content is 1.5%.With the wide application of new HPC, the compression strength, crack resistance and durability of lining concrete are improved, channel seepage discharge is reduced and a large amount of natural building materials are saved.


1972 ◽  
Vol 8 (2) ◽  
pp. 519-524 ◽  
Author(s):  
John C. Bruch ◽  
Leandro B. Fernandez Sainz

2003 ◽  
Vol 2003 (2) ◽  
pp. 1-5
Author(s):  
Gregory J. Street ◽  
Stephen Parsons ◽  
David Allen ◽  
Michael Hatch

1964 ◽  
Vol 90 (2) ◽  
pp. 55-79
Author(s):  
Hubert J. Morel-Seytoux

Sign in / Sign up

Export Citation Format

Share Document