Consequences of The Implementation of Lesotho Highlands Water Project on Agricultural Production of Dam-Affected and Relocated Farm Families: Mohale Dam Maseru

2020 ◽  
Vol 6 (2) ◽  
pp. 28-33
Author(s):  
M Mopeli ◽  
◽  
AM Rantlo ◽  
RA Mojaki ◽  
KJB Keregero
2019 ◽  
Vol 6 (04) ◽  
Author(s):  
M S MEENA ◽  
R B KALE ◽  
S K SINGH ◽  
A K SINGH

A study was undertaken in collaboration with eight Krishi Vigyan Kendras (KVKs) and five Learning and Experience based Advisor (LEAD) farmers were selected by each KVK, employing socio-metric technique. Hence, data were solicited from 40 LEAD farmers from eight districts who were trained by KVKs. Role of KVKs were determined based on their Index Value (IV). Study reveals that KVKs played an important role in skill development of LEAD farmers through organisation of need based and skill-oriented trainings (IV=62) followed by front-line demonstrations on location specific agricultural technologies at farmers’ fields (IV=59.42), and developing linkages between LEAD and fellow farmers (IV=58.33). Key determinants accountable for enhancing effectiveness of this model were enhanced technology adoption (IV=60.13) followed by enhanced agricultural production (IV=57.48) and productivity (IV=57.10). Study reveals that one LEAD farmer adopted 5 agricultural technologies from KVKs. Further, fellow farmers adopted 2 agricultural technologies from LEAD farmers. Hence, it was concluded that this approach may play a significant role in complementing Indian public extension system through reducing cost and coverage of more farm families. This model needs community as well as government support for sustainability and its scalability.


Daedalus ◽  
2021 ◽  
Vol 150 (4) ◽  
pp. 181-193
Author(s):  
Oscar Gakuo Mwangi

Abstract The Lesotho Highlands Water Project, which exports water to South Africa, has enhanced the unequal structural relationship that exists between both states. Lesotho, one of the few countries in the world that exports water, has transformed from one of the largest sources of labor for South Africa to a water reservoir for South Africa. Though the project provides mutual strategic economic and political benefits to both riparian states, its construction has negatively affected environmental and human security in Lesotho. Due to hydropolitics, environmental threats in Lesotho caused by the project's construction are overlooked. These threats, which have devastating effects on resettled communities and the country's ecosystem, also constitute a threat to domestic and international security. The desire to prevent interstate conflict and maintain cooperation between the two riparian states further enhances the lopsided interstate relationship.


Sign in / Sign up

Export Citation Format

Share Document