scholarly journals Choosing approximation function for the model of settlement load curve, in static load test for precast concrete piles

2013 ◽  
Vol 12 (3) ◽  
pp. 105-112
Author(s):  
Zygmunt Meyer ◽  
Grzegorz Szmechel

The main aim of the work is to define better correlation between parameters of Meyer- Kowalów equation [7,8] with the use of mathematical experiments and statistical tests. So far the research has shown that correlation between particular factors are different than common assumed. It was necessary to check non linear correlations between C-constant and k.  A certain constant and starting data were assumed in the theoretical model applied to the paper.  As a result of the mathematical experiments, the best fit proposal of estimation C and equation representingk=k(Ngr)was formulated.

2019 ◽  
Vol 200 ◽  
pp. 109719 ◽  
Author(s):  
Yun Zhou ◽  
Taiping Chen ◽  
Yilin Pei ◽  
Hyeon-Jong Hwang ◽  
Xiang Hu ◽  
...  

Author(s):  
Zygmunt Meyer ◽  
Kamil Stachecki

Abstract In the work authors analysed possibility of obtaining static load tests curve for a pile in case of changed diameter, using load curve based on results of static load tests for given diameter. In calculation analysis authors used Meyer–Kowalów (M-K) method. A mathematical description was shown of determining new M-K curve for a pile with changed diameter, taking as a basis original M-K curve obtained from static load tests. Then an example of calculations is presented in which parameters of M-K model for a new curve were determined. Simulation calculations were carried out in the original computer program, the results of which includes load curves for piles with different diameters and relations between diameter changes, limit load capacity and settlement of a pile.


Author(s):  
A. Z. Zhussupbekov ◽  
Z. A. Shakhmov ◽  
G. T. Tleulenova ◽  
S. B. Akhazhanov

In this paper the analysis results of precast piles different tests are presented. Extreme soil conditions of Astana (Kazakhstan) involve realizing the work precast piles in various soil ground and interaction soil ground and piles. There were carried out dynamic and static load tests of piles in extreme soil ground conditions in Astana. Based on data results of pile foundations the piles bearing capacity was determined. According to the results of DLT with PDA of driving piles (30.0 cm) the bearing capacity of the piles is 911 kN. The bearing capacity of the driven piles according to the results of SLT amounted to be 878 kN. Soils physic-mechanical properties in extreme conditions of Astana along with graphs of dependence are between settlement and load. The precise analysis of climatic and geological factors of the construction sites is shown. Investigations method for precast concrete piles testing is presented. Dynamic load test methodology in Astana for concrete piles testing is shown.  These investigations are important for of Pile-Soil interaction on problematical soil ground.


Different methods have been used to determine the pile bearing capacity such as static equations, dynamic equations, empirical methods (EMs), numerical methods, computer software programs, and the pile static load test, these methods were giving different values for pile bearing capacity. In this paper, three empirical methods (Ems) have been selected (Brinch-Hansen, Chin-Kondner, and Decourt) and (AllPile 6) software (AP) has been applied to determine the capacity load of piles for six cases study of drilled concrete piles with a diameter ranging from 800 mm to 1500mm and embedded length ranged 10.5m to 26m. Four of those six piles are located at Portsudan city near the red seacoast and two piles are located in Khartoum city. The results of the pile bearing capacity (PC) calculations obtained using the above-mentioned different methods were compared with results produced by the pile load test. In all six cases study, the settlement of piles was limited, settlement failure was not reached. The results show that the AllPile 6 (AP) and the three mentioned empirical methods (Ems) gave reasonable piles bearing capacity, the (AP) and (BHM) gave the better result than the CKM and DM. While (DM) gave results similar to results determined using the (CKM). However, it was not preferred to use the (CKM) and (DM), unless the failure settlement has occurred in the pile load test.


2016 ◽  
Vol 8 (5) ◽  
pp. 495-498
Author(s):  
Tautvydas Statkus

In this article jacked pile installation technology and its current processes, altering the base physical and mechanical characteristics are discussed. For the jacked pile static load test simulation Plax 3D software was selected, the opportunities and developments were described. Model building, materials, models, model geometry, finite elements, boundary conditions and assumptions adopted in addressing problems described in detail. Three different tasks formulated and load-settlement dependence a comparison of the results with the experiment given. Conclusions are formulated according to the modeling results. Šiame straipsnyje aptarta spaustinių polių įrengimo technologija ir ją taikant vykstantys procesai, keičiantys pagrindo fizines ir mechanines charakteristikas. Spaustinio polio bandymui statine apkrova modeliuoti pasirinktas PLAXIS 3D programinis paketas ir aprašytos jo galimybės bei raida. Detaliai nupasakotas modelio kūrimas, medžiagų modeliai, modelio geometrija, baigtiniai elementai, kraštinės sąlygos ir priimamos prielaidos sprendžiant problemą. Suformuluoti trys sprendžiami uždaviniai ir apkrovos bei nuosėdžio priklausomybe pateikiamas rezultatų palyginimas su eksperimentu. Atsižvelgiant į modeliavimo rezultatus suformuluotos išvados.


Sign in / Sign up

Export Citation Format

Share Document