scholarly journals Design for Deconstruction Using Integrated Lean Principles and BIM Approach

2021 ◽  
Vol 13 (14) ◽  
pp. 7856
Author(s):  
Mohamed Marzouk ◽  
Ahmed Elmaraghy

Existing buildings are characterized by the continuous change in the functional requirements of their end-users. As such, they are subjected to renovation or reconstruction, which is associated with total or partial demolition of the buildings, leading to an increase in construction and demolition waste. In addition, the materials abandoning the circular loop leave an adverse impact on the environment. This research integrates the building information modeling (BIM) approach and lean principles to ensure the early involvement of key participants in the decision-making process. This approach aids in planning the sequencing of deconstruction planning phases required before actual demolition activities take place. The paper presents the practical implementation of a BIM plug-in Tool. The assumptions and the scope based on which the plug-in was designed are briefly discussed. A case study for a mechanical, electrical, and plumbing (MEP) BIM model is introduced to illustrate the practical features of the proposed BIM plug-in Tool. The results encourage the selective dismantling of building elements based on the customers’ needs. Building information modeling capabilities in deconstruction planning were also investigated. The proposed tool aids in decreasing the uncertainties involved in demolition projects. The tool can be implemented on a national level to automate the deconstruction projects and optimize the extraction of salvaged building elements. The recovery option for such elements and their final destiny can be secured with sufficient time before their dismantling from their original locations.

2021 ◽  
Vol 13 (23) ◽  
pp. 12983
Author(s):  
Dongchen Han ◽  
Mohsen Kalantari ◽  
Abbas Rajabifard

Construction and demolition waste (C&DW) contribute to approximately 30% of the total waste generation worldwide, by which heterogeneous ecological impacts, such as resource depletion, global warming, and land degradation, are engendered. Despite ongoing research efforts to minimize construction waste via the Building Information Modeling (BIM)-aided design, there is a paucity of research on integrating BIM in demolition waste management (DWM). This study investigates prominent barriers and future research directions toward the wider adoption of BIM in C&DWM by conducting a systematic literature review. First, this study identifies the barriers that hinder the implementation of C&DWM in Australia; then, it explores the benefits and challenges of leveraging BIM applications for C&DWM. The findings suggest that, for existing buildings without up-to-date design drawings, it is imperative to improve the accuracy of data capturing and object recognition techniques to overcome the bottlenecks of BIM-DWM integration. Moreover, the development of regional-oriented material banks and their harmonization with life cycle assessment databases can extend the potential of BIM-based sustainability analysis, making it applicable to the DWM domain. This study proposes a research agenda on tackling these challenges to realize BIM’s full potential in facilitating DWM.


2020 ◽  
Vol 10 (3) ◽  
pp. 821 ◽  
Author(s):  
Schimanski ◽  
Marcher ◽  
Monizza ◽  
Matt

Many researchers have stated that lean and building information modeling (BIM) have positive synergies. This integrative literature review aims at exploring this body of knowledge within the scope of combinations of BIM and the Last Planner® System, as an important Lean construction method, in the phase of construction execution. The research motivation is to find out whether a comprehensive understanding of how to take advantage of these synergies exists. Eventually, the question arises of how to condense this understanding—if existing—into a robust conceptual model for integration. As a theoretical backbone, we will make use of the original BIM-Lean interaction matrix. The hypothesis is that new BIM functionalities have been evolved since the first formulation of this interaction matrix almost 10 years ago. These new BIM functionalities cause new interactions with existing lean principles. We will focus on interactions that refer directly or indirectly to production planning and control and use them to find the most relevant literature for this review. Within the content analysis, as a part of this review, we focus on existing conceptual models and frameworks for integration of BIM and the Last Planner® System and reveal their shortcomings. Eventually, we will propose a new conceptual model.


Author(s):  
Nguyen Manh Tuan

The concepts of Building Information Modeling (BIM) and Lean construction are increasingly popular and used for the purpose of improving the efficiency of construction projects. The Lean construction approach helps optimize the system, thereby minimizing the waste and increase the maximum amount of value for clients. This is in line with the effectiveness of BIM for the purpose of analyzing, evaluating, and managing projects based on the virtual information model before, during and after construction. The combination of BIM and Lean construction will certainly be the trend of the construction industry in the near future. This paper aims to analyze the integration of Lean construction principles in the BIM coordination process through a specific case study. The project management unit is responsible for managing and evaluating BIM models from consultants and contractors and serves as the project's BIM coordinator. Keywords: building information modeling; BIM coordination process; Lean construction; Lean principles. Received 20 November 2018, Revised 30 December 2018, Accepted 25 January 2019


2021 ◽  
Vol 10 (10) ◽  
pp. 700
Author(s):  
Qi Qiu ◽  
Mengjun Wang ◽  
Qingsheng Xie ◽  
Junjun Han ◽  
Xiaoping Zhou

Indoor maps lay the foundation for most indoor location-based services (LBS). Building Information Modeling (BIM) data contains multiple dimensional computer-aided design information. Some studies have utilized BIM data to automatically extract 3D indoor maps. A complete 3D indoor map consists of both floor-level maps and cross-floor paths. Currently, the floor-level indoor maps are mainly either grid-based maps or topological maps, and the cross-floor path generation schemes are not adaptive to building elements with irregular 3D shapes. To address these issues, this study proposes a novel scheme to extract an accurate 3D indoor map with any shape using BIM data. Firstly, this study extracts grid-based maps from BIM data and generates the topological maps directly through the grid-based maps using image thinning. A novel hybrid indoor map, termed Grid-Topological map, is then formed by the grid-based maps and topological maps jointly. Secondly, this study obtains the cross-floor paths from cross-floor building elements by a four-step process, namely X-Z projection, boundary extraction, X-Z topological path generation, and path-BIM intersection. Finally, experiments on eight typical types of cross-floor building elements and three multi-floor real-world buildings were conducted to prove the effectiveness of the proposed scheme, the average accuracy rates of the evaluated paths are higher than 88%. This study will advance the 3D indoor maps generation and inspire the application of indoor maps in indoor LBS, indoor robots, and 3D geographic information systems.


2017 ◽  
Vol 35 (12) ◽  
pp. 1285-1295 ◽  
Author(s):  
Young-Chan Kim ◽  
Won-Hwa Hong ◽  
Jae-Woo Park ◽  
Gi-Wook Cha

Most existing studies on demolition waste (DW) quantification do not have an official standard to estimate the amount and type of DW. Therefore, there are limitations in the existing literature for estimating DW with a consistent classification system. Building information modeling (BIM) is a technology that can generate and manage all the information required during the life cycle of a building, from design to demolition. Nevertheless, there has been a lack of research regarding its application to the demolition stage of a building. For an effective waste management plan, the estimation of the type and volume of DW should begin from the building design stage. However, the lack of tools hinders an early estimation. This study proposes a BIM-based framework that estimates DW in the early design stages, to achieve an effective and streamlined planning, processing, and management. Specifically, the input of construction materials in the Korean construction classification system and those in the BIM library were matched. Based on this matching integration, the estimates of DW by type were calculated by applying the weight/unit volume factors and the rates of DW volume change. To verify the framework, its operation was demonstrated by means of an actual BIM modeling and by comparing its results with those available in the literature. This study is expected to contribute not only to the estimation of DW at the building level, but also to the automated estimation of DW at the district level.