scholarly journals Mechanism of the Rapid Shrinkage of Limboto Lake in Gorontalo, Indonesia

2020 ◽  
Vol 12 (22) ◽  
pp. 9598
Author(s):  
Satomi Kimijima ◽  
Masayuki Sakakibara ◽  
Abd. Kadir Mubarak A Amin ◽  
Masahiko Nagai ◽  
Yayu Indriati Arifin

This study explores the mechanisms behind the rapid shrinkage of Limboto Lake, Gorontalo, Indonesia, using remotely sensed imagery and river outcrop investigation data. The results show that more than 70% of the sedimentation resulting in shrinkage is contributed by riverbank erosion causing rivers to drain into the lake during the period 2003–2017. From geological investigation, it is found that the lowland area to the west of Limboto Lake comprises 1 m of flood sediments, followed by at least 5 m of fine-grained inner bay sediments. Severe riverbank erosion is also observed at many points. Hence, it is concluded that the shrinkage of Limboto Lake resulted from rapid-induced rapid erosion of inner bay sediments formed during plate collision which readily flowed into and were deposited in Limboto Lake; this created a delta, especially on the west side of the lake. Accelerated sedimentation caused by river erosion has led to rapid lake shrinkage. This phenomenon could be typical of the transformation of enclosed seas into lakes by the rapid uplifting movement of land in collision zones.

Data Series ◽  
10.3133/ds566 ◽  
2010 ◽  
Author(s):  
John A. Barras ◽  
John C. Brock ◽  
Robert A. Morton ◽  
Laurinda J. Travers

Author(s):  
J. M. Tenenbaum ◽  
H. G. Barrow ◽  
R. C. Bolles ◽  
M. A. Fischler ◽  
H. C. Wolf

2018 ◽  
Vol 81 (3) ◽  
pp. 411-417
Author(s):  
Laurence Terrier Aliferis

Abstract The ruined Cistercian church of Vaucelles is known only by a few preserved fragments and a plan of the choir reproduced by Villard of Honnecourt. Historical sources provide three key dates: 1190 (start of construction), 1215 (entry into the new church), 1235 (date of the dedication). From the nineteenth century until now, it was considered that the foundations were laid in 1190 and that the construction started on the west side of the church. In 1216, the nave would have been completed, and the choir would have been built between 1216 and 1235. Consultation of the historical sources and examination of the historiographic record changes this established chronology of the site. In fact, the construction proceeded from east to west. The choir reproduced in 1216 or shortly before by Villard de Honnecourt presents the building as it then appeared, with the eastern part of the building totally completed.


Sign in / Sign up

Export Citation Format

Share Document