scholarly journals Detail Engineering Completion Rating Index System (DECRIS) for Optimal Initiation of Construction Works to Improve Contractors’ Schedule-Cost Performance for Offshore Oil and Gas EPC Projects

2018 ◽  
Vol 10 (7) ◽  
pp. 2469 ◽  
Author(s):  
Myung-Hun Kim ◽  
Eul-Bum Lee ◽  
Han-Suk Choi

Engineering, Procurement, and Construction (EPC) contractors with lump-sum turnkey contracts have recently been suffering massive profit losses due to re-works and schedule delays in offshore oil and gas EPC megaprojects. The main objective of this research is to develop and implement a detail engineering completion rating index system (DECRIS) to assist EPC contractors to optimize fabrication and construction works schedules while minimizing potential re-work/re-order. This is achieved through adequate detail design development and results in minimizing schedule delays and potential liquidated damages (i.e., delay penalties). The developed DECRIS was based on findings from an extensive review of existing literature, industry-led studies, expert surveys, and expert workshops. The DECRIS model is an evolution, and improvement of existing tools such as the project definition raking index (PDRI) and front-end loading (FEL) developed specifically for the early stage of engineering maturity assessment (i.e., planning, basic design, and front-end engineering design (FEED)), prior to EPC projects. The DECRIS was evaluated and validated with thirteen sample as-built offshore megaprojects completed recently. When the DECRIS was applied to the completed projects post-hoc, a correlation (R-squared 0.71) was found between DECRIS scores and schedule/cost performances. This is much superior to the PDRI-Industrial model’s correlation (R-squared 0.04), which was primarily devised for owners’ basic engineering or FEED completion assessment. Finally, as a means of further validation, project schedule and cost performance of an ongoing project was predicted based on the correlations found on the thirteen completed projects. The resultant predicted schedule and cost performance was well matched with the current project performance status. Based on the accuracy of the DECRIS model found in the validation, said model is an effective prospective tool for EPC contractors to manage their engineering and procurement/construction risks during the initial detail design stages.

1973 ◽  
Vol 11 (3) ◽  
pp. 480
Author(s):  
J. M. Killey

As onshore oil and gas deposits are becoming more difficult to locate, and as the world demands for energy continue to increase at an alarming rate, oil companies are channeling much of their exploration activities towards offshore operations, and in particular, towards operations centered off Canada's coast lines. Because of the environment, offshore drilling presents problems which are novel to the onshore-geared oil industry. J. M. Killey discusses in detail many of the considerations involved in drafting the offshore drilling contract, concentrating on problems such as the liability of the various parties; costs; scheduling; pollution; conflict of laws; etc. Similarly, he discusses service contracts (such as supply boat charters; towing services; helicopter services; etc.^ which are necessity to the operation of an offshore drilling rig. To complement his paper, the author has included number of appendices which list the various considerations lawyer must keep in mind when drafting contracts for offshore operations.


2018 ◽  
Vol 26 (5) ◽  
pp. 1603-1613 ◽  
Author(s):  
Hongjun Zhu ◽  
Zhi Yang ◽  
Youming Xiong ◽  
Yongyou Wang ◽  
Lu Kang

2021 ◽  
Vol 775 ◽  
pp. 145485
Author(s):  
Yiqian Liu ◽  
Hao Lu ◽  
Yudong Li ◽  
Hong Xu ◽  
Zhicheng Pan ◽  
...  