scholarly journals Minimization of the Settling Time of Variable Area Flowmeters

Sensors ◽  
2019 ◽  
Vol 19 (3) ◽  
pp. 530 ◽  
Author(s):  
Mateusz Turkowski ◽  
Artur Szczecki ◽  
Maciej Szudarek

In the article a differential equation describing transient behavior of variable area (VA) meters has been developed and validated experimentally for air as a measured fluid and for two float shapes—plumb bob and sphere. A modified version of simplex algorithm adapted for nonlinear constraint optimization problems was applied to minimize the settling time of VA meters in two cases. In the first case both the float and tube geometry were altered. In the second case only the float geometry was modified. The second case has been validated experimentally. The theory and experiment is in reasonable agreement (under 5% of full scale), which is satisfactory for the purposes of optimization of VA flowmeters dynamic performance. Analytical model of VA flowmeter has been proven to be a proper tool for optimization. Settling times obtained during the optimization process were several times shorter than these of commercially manufactured instruments. Overshoot has not exceeded the assumed value of 3%.

2020 ◽  
Vol 34 (05) ◽  
pp. 7333-7340
Author(s):  
Roie Zivan ◽  
Omer Lev ◽  
Rotem Galiki

Belief propagation, an algorithm for solving problems represented by graphical models, has long been known to converge to the optimal solution when the graph is a tree. When the graph representing the problem includes a single cycle, the algorithm either converges to the optimal solution or performs periodic oscillations. While the conditions that trigger these two behaviors have been established, the question regarding the convergence and divergence of the algorithm on graphs that include more than one cycle is still open.Focusing on Max-sum, the version of belief propagation for solving distributed constraint optimization problems (DCOPs), we extend the theory on the behavior of belief propagation in general – and Max-sum specifically – when solving problems represented by graphs with multiple cycles. This includes: 1) Generalizing the results obtained for graphs with a single cycle to graphs with multiple cycles, by using backtrack cost trees (BCT). 2) Proving that when the algorithm is applied to adjacent symmetric cycles, the use of a large enough damping factor guarantees convergence to the optimal solution.


Author(s):  
Tiep Le ◽  
Tran Cao Son ◽  
Enrico Pontelli

This paper proposes Multi-context System for Optimization Problems (MCS-OP) by introducing conditional costassignment bridge rules to Multi-context Systems (MCS). This novel feature facilitates the definition of a preorder among equilibria, based on the total incurred cost of applied bridge rules. As an application of MCS-OP, the paper describes how MCS-OP can be used in modeling Distributed Constraint Optimization Problems (DCOP), a prominent class of distributed optimization problems that is frequently employed in multi-agent system (MAS) research. The paper shows, by means of an example, that MCS-OP is more expressive than DCOP, and hence, could potentially be useful in modeling distributed optimization problems which cannot be easily dealt with using DCOPs. It also contains a complexity analysis of MCS-OP.


Sign in / Sign up

Export Citation Format

Share Document