scholarly journals Multi-Size Proppant Pumping Schedule of Hydraulic Fracturing: Application to a MP-PIC Model of Unconventional Reservoir for Enhanced Gas Production

Processes ◽  
2020 ◽  
Vol 8 (5) ◽  
pp. 570 ◽  
Author(s):  
Prashanth Siddhamshetty ◽  
Shaowen Mao ◽  
Kan Wu ◽  
Joseph Sang-Il Kwon

Slickwater hydraulic fracturing is becoming a prevalent approach to economically recovering shale hydrocarbon. It is very important to understand the proppant’s transport behavior during slickwater hydraulic fracturing treatment for effective creation of a desired propped fracture geometry. The currently available models are either oversimplified or have been performed at limited length scales to avoid high computational requirements. Another limitation is that the currently available hydraulic fracturing simulators are developed using only single-sized proppant particles. Motivated by this, in this work, a computationally efficient, three-dimensional, multiphase particle-in-cell (MP-PIC) model was employed to simulate the multi-size proppant transport in a field-scale geometry using the Eulerian–Lagrangian framework. Instead of tracking each particle, groups of particles (called parcels) are tracked, which allows one to simulate the proppant transport in field-scale geometries at an affordable computational cost. Then, we found from our sensitivity study that pumping schedules significantly affect propped fracture surface area and average fracture conductivity, thereby influencing shale gas production. Motivated by these results, we propose an optimization framework using the MP-PIC model to design the multi-size proppant pumping schedule that maximizes shale gas production from unconventional reservoirs for given fracturing resources.

SPE Journal ◽  
1900 ◽  
pp. 1-17
Author(s):  
Shaowen Mao ◽  
Prashanth Siddhamshetty ◽  
Zhuo Zhang ◽  
Wei Yu ◽  
Troy Chun ◽  
...  

Summary Slickwater fracturing has become one of the most leveraging completion technologies in unlocking hydrocarbon in unconventional reservoirs. In slickwater treatments, proppant transport becomes a big concern because of the inefficiency of low-viscosity fluids to suspend the particles. Many studies have been devoted to proppant transport experimentally and numerically. However, only a few focused on the proppant pumping schedules in slickwater fracturing. The impact of proppant schedules on well production remains unclear. The goal of our work is to simulate the proppant transport under real pumping schedules (multisize proppants and varying concentration) at the field scale and quantitatively evaluate the effects of proppant schedules on well production for slickwater fracturing. The workflow consists of three steps. First, a validated 3D multiphase particle-in-cell (MP-PIC) model has been used to simulate the proppant transport at real pumping schedules in a field-scale fracture (180-m length, 30-m height). Second, we applied a propped fracture conductivity model to calculate the distribution of propped fracture width, permeability, and fracture conductivity. In the last step, we incorporated the fracture geometry, propped fracture conductivity, and the estimated unpropped fracture conductivity into a reservoir simulation model to predict gas production. Based on the field designs of pumping schedules in slickwater treatments, we have generated four proppant schedules, in which 100-mesh and 40/70-mesh proppants were loaded successively with stair-stepped and incremental stages. The first three were used to study the effects of the mass percentages of the multisize proppants. From Schedules 1 through 3, the mass percentage of 100-mesh proppants is 30, 50, and 70%, respectively. Schedule 4 has the same proppant percentage as Schedule 2 but has a flush stage after slurry injection. The comparison between Schedules 2 and 4 enables us to evaluate the effect of the flush stage on well production. The results indicate that the proppant schedule has a significant influence on treatment performance. The schedule with a higher percentage of 100-mesh proppants has a longer proppant transport distance, a larger propped fracture area, but a lower propped fracture conductivity. Then, the reservoir simulation results show that both the small and large percentages of 100-mesh proppants cannot maximize well production because of the corresponding small propped area and low propped fracture conductivity. Schedule 2, with a median percentage (50%) of 100-mesh proppants, has the highest 1,000-day cumulative gas production. For Schedule 4, the flush stage significantly benefits the gas production by 8.2% because of a longer and more uniform proppant bed along the fracture. In this paper, for the first time, we provide both the qualitative explanation and quantitative evaluation for the impact of proppant pumping schedules on the performance of slickwater treatments at the field scale by using an integrated numerical simulation workflow, providing crucial insights for the design of proppant schedules in the field slickwater treatments.


2016 ◽  
Vol 9 (1) ◽  
pp. 207-215 ◽  
Author(s):  
Hongling Zhang ◽  
Jing Wang ◽  
Haiyong Zhang

Shale gas is one of the primary types of unconventional reservoirs to be exploited in search for long-lasting resources. Production from shale gas reservoirs requires horizontal drilling with hydraulic fracturing to achieve the most economic production. However, plenty of parameters (e.g., fracture conductivity, fracture spacing, half-length, matrix permeability, and porosity,etc) have high uncertainty that may cause unexpected high cost. Therefore, to develop an efficient and practical method for quantifying uncertainty and optimizing shale-gas production is highly desirable. This paper focuses on analyzing the main factors during gas production, including petro-physical parameters, hydraulic fracture parameters, and work conditions on shale-gas production performances. Firstly, numerous key parameters of shale-gas production from the fourteen best-known shale gas reservoirs in the United States are selected through the correlation analysis. Secondly, a grey relational grade method is used to quantitatively estimate the potential of developing target shale gas reservoirs as well as the impact ranking of these factors. Analyses on production data of many shale-gas reservoirs indicate that the recovery efficiencies are highly correlated with the major parameters predicted by the new method. Among all main factors, the impact ranking of major factors, from more important to less important, is matrix permeability, fracture conductivity, fracture density of hydraulic fracturing, reservoir pressure, total organic content (TOC), fracture half-length, adsorbed gas, reservoir thickness, reservoir depth, and clay content. This work can provide significant insights into quantifying the evaluation of the development potential of shale gas reservoirs, the influence degree of main factors, and optimization of shale gas production.


2021 ◽  
Vol 73 (08) ◽  
pp. 67-68
Author(s):  
Chris Carpenter

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 201694, “Interwell Fracturing Interference Evaluation of Multiwell Pads in Shale Gas Reservoirs: A Case Study in WY Basin,” by Youwei He, SPE, Jianchun Guo, SPE, and Yong Tang, Southwest Petroleum University, et al., prepared for the 2020 SPE Annual Technical Conference and Exhibition, originally scheduled to be held in Denver, Colorado, 5–7 October. The paper has not been peer reviewed. The paper aims to determine the mechanisms of fracturing interference for multiwell pads in shale gas reservoirs and evaluate the effect of interwell fracturing interference on production. Field data of 56 shale gas wells in the WY Basin are applied to calculate the ratio of affected wells to newly fractured wells and understand its influence on gas production. The main controlling factors of fracturing interference are determined, and the interwell fracturing interacting types are presented. Production recovery potential for affected wells is analyzed, and suggestions for mitigating fracturing interference are proposed. Interwell Fracturing Interference Evaluation The WY shale play is in the southwest region of the Sichuan Basin, where shale gas reserves in the Wufeng-Longmaxi formation are estimated to be the highest in China. The reservoir has produced hydrocarbons since 2016. Infill well drilling and massive hydraulic fracturing operations have been applied in the basin. Each well pad usually is composed of six to eight multifractured horizontal wells (MFHWs). Well spacing within one pad, or the distance between adjacent well pads, is so small that fracture interference can occur easily between infill wells and parent wells. Fig. 1 shows the number of wells affected by in-fill well fracturing from 2016 to 2019 in the basin. As the number of newly drilled wells increased between 2017 and 2019, the number of wells affected by hydraulic fracturing has greatly increased. The number of wells experiencing fracturing interaction has reached 65 in the last 4 years at the time of writing.


2013 ◽  
Vol 53 (1) ◽  
pp. 355 ◽  
Author(s):  
Luiz Bortolan Neto ◽  
Aditya Khanna ◽  
Andrei Kotousov

A new approach for evaluating the performance of hydraulic fractures that are partially packed with proppant (propping agent) particles is presented. The residual opening of the partially propped fracture is determined as a function of the initial fracture geometry, the propped length of the fracture, the compressive rock stresses, the elastic properties of the rock, and the compressibility of the proppant pack. A mathematical model for fluid flow towards the fracture is developed, which incorporates the effects of the residual opening profile of the fracture and the high conductivity of the unpropped fracture length. The residual opening profile of the fracture is calculated for a particular case where the proppant pack is nearly rigid and there is no closure of the fracture faces due to the confining (compressive) stresses. A sensitivity study is performed to demonstrate the dependence of the well productivity index on the propped length of the fracture, the proppant pack permeability, and the dimensionless fracture conductivity. The sensitivity study suggests that the residual opening of a fracture has a significant impact on production, and that partially propped fractures can be more productive than fully propped fractures. Application of this new approach can lead to economic benefits.


2019 ◽  
Vol 58 (27) ◽  
pp. 12097-12115 ◽  
Author(s):  
Kaiyu Cao ◽  
Prashanth Siddhamshetty ◽  
Yuchan Ahn ◽  
Rajib Mukherjee ◽  
Joseph Sang-Il Kwon

1985 ◽  
Vol 25 (02) ◽  
pp. 157-170 ◽  
Author(s):  
R.A. Cutler ◽  
D.O. Enniss ◽  
A.H. Jones ◽  
S.R. Swanson

Abstract Lightweight, intermediate-strength proppants have been developed that are intermediate in cost between sand and bauxite. A wide variety of proppant materials is characterized and compared in a laboratory fracture conductivity study. Consistent sample preparation, test, and data reduction procedures were practiced, which allow a relative comparison of the conductivity of various proppants at intermediate and high stresses. Specific gravity, proppants at intermediate and high stresses. Specific gravity, corrosion resistance, and crush resistance of each proppant also were determined. proppant also were determined. Fracture conductivity was measured to a laminar flow of deaerated, deionized water over a closure stress range of 6.9 to 96.5 MPa [1,000 to 14,000 psi] in 6.9-MPa [1,000-psi] increments. Testing was performed at a constant 50 degrees C [122 degrees F] temperature. Results of the testing are compared with values from the literature and analyzed to determine proppant acceptability in the intermediate and high closure stress regions. Fracture strengths for porous and solid proppants agree well with calculated values. Several oxide ceramics were found to have acceptable conductivity at closure stresses to 96.5 MPa [14,000 psi]. Resin-coated proppants have lower conductivities than uncoated, intermediate-strength oxide proppants when similar size distributions are tested. Recommendations are made for obtaining valid conductivity data for use in proppant selection and economic analyses. proppant selection and economic analyses. Introduction Massive hydraulic fracturing (MHF) is used to increase the productivity of gas wells in low-permeability reservoirs by creating deeply penetrating fractures in the producing formation surrounding the well. Traditionally, producing formation surrounding the well. Traditionally, high-purity silica sand has been pumped into the created fracture to prop it open and maintain gas permeability after completing the stimulation. The relatively low cost, abundance, sphericity, and low specific gravity of high-quality sands (e.g., Jordan, St. Peters, and Brady formation silica sands) have made sand a good proppant for most hydraulic fracturing treatments. The closure stress on the proppants increases with depth, and even for selected high-quality sands the fracture conductivity has been found to deteriorate rapidly when closure stresses exceed approximately 48 MPa [7,000 psi]. Several higher-strength proppants have been developed to withstand the increased closure stress of deeper wells. Sintered bauxite, fused zirconia, and resin-coated sands have been the most successful higher-strength proppants introduced. These proppants have improved proppants introduced. These proppants have improved crush resistance and have been used successfully in MHF treatments. The higher cost of these materials as compared to sand has been the largest single factor inhibiting their widespread use. The higher specific gravity of bauxite and zirconia proppants not only increases the volume cost differential compared to sand but also enhances proppant settling. Lower-specific-gravity proppants not only are more cost effective but also have the potential to improve proppant transport. Novotny showed the effect of proppant diameter on settling velocity in non-Newtonian fluids and concluded that proppant settling may determine the success or failure of a hydraulic fracturing treatment. By using the same proppant settling equation as Novotny, the settling velocity of 20/40 mesh proppants is calculated for four different specific gravities and shown as a function of fluid shear rate in Fig. 1. The specific gravity of bauxite is 3.65 and sand is 2.65; therefore, bauxite is 37.7 % more dense than sand. The settling velocity for bauxite, as shown in Fig. 1, however, is approximately 65 % higher than sand. Work on proppants with specific gravities lower than bauxite was initiated to improve the transport characteristics of the proppant during placement. It has been demonstrated that vertical propagation of the fracture can be limited by reducing the fracturing fluid pressure. The viscosity range of existing fracturing pressure. The viscosity range of existing fracturing fluids makes minimizing fluid viscosity a much more effective method of controlling pressure than lowering the pumping rate. A potential advantage of decreasing the pumping rate. A potential advantage of decreasing the specific gravity of the proppant is that identical proppant transport to that currently achievable can take place in lower-viscosity fluids. (Alternatively, higher volumes of proppant can be pumped in a given amount of a proppant can be pumped in a given amount of a high-viscosity fracturing fluid.) Not only are low-viscosity fluids capable of allowing better fracture control, they are also less expensive. More importantly, it recently was shown that the conductivity of a created hydraulic fracture in the Wamsutter area is about one-tenth of that predicted by laboratory conductivity tests. P. 157


Sign in / Sign up

Export Citation Format

Share Document