scholarly journals Flexible Flow Shop Scheduling Method with Public Buffer

Processes ◽  
2019 ◽  
Vol 7 (10) ◽  
pp. 681
Author(s):  
Han ◽  
Han ◽  
Lin ◽  
Dong ◽  
Shi

Actual manufacturing enterprises usually solve the production blockage problem by increasing the public buffer. However, the increase of the public buffer makes the flexible flow shop scheduling rather challenging. In order to solve the flexible flow shop scheduling problem with public buffer (FFSP–PB), this study proposes a novel method combining the simulated annealing algorithm-based Hopfield neural network algorithm (SAA–HNN) and local scheduling rules. The SAA–HNN algorithm is used as the global optimization method, and constructs the energy function of FFSP–PB to apply its asymptotically stable characteristic. Due to the limitations, such as small search range and high probability of falling into local extremum, this algorithm introduces the simulated annealing algorithm idea such that the algorithm is able to accept poor fitness solution and further expand its search scope during asymptotic convergence. In the process of local scheduling, considering the transferring time of workpieces moving into and out of public buffer and the manufacturing state of workpieces in the production process, this study designed serval local scheduling rules to control the moving process of the workpieces between the public buffer and the limited buffer between the stages. These local scheduling rules can also be used to reduce the production blockage and improve the efficiency of the workpiece transfer. Evaluated by the groups of simulation schemes with the actual production data of one bus manufacturing enterprise, the proposed method outperforms other methods in terms of searching efficiency and optimization target.

2020 ◽  
pp. 1-14
Author(s):  
Waraporn Fangrit ◽  
Hwa Jen Yap ◽  
Mukhtar Fatihu Hamza ◽  
Siow-Wee Chang ◽  
Keem Siah Yap ◽  
...  

Flexible flow shop is becoming more interested and applied in industries due to its impact from higher workloads. Flexible flow shop scheduling problem is focused to minimize the makespan. A metaheuristic model based on Hybrid Tabu Search is developed to overcome this problem. Firstly, Hybrid Tabu Search is modelled based on the factory data. The Earliest Due Date rule is used as the scheduling method for the current status. FlexSim simulation software is used to evaluate the Hybrid Tabu Search model. The outcome is validated with two different basic heuristic solutions; Campbell, Dudek and Smith’s and Gupta’s heuristics. It is found that the proposed model can improve the job sequence based on makespan criteria.


Sign in / Sign up

Export Citation Format

Share Document