Selection and assessment of mining equipment used in open pit rock mines relies chiefly on estimates of overall exploitation cost. The rational arrangement of mining equipment and systems comprising loading machines, haul trucks and crushing plants should be preceded by a thorough analysis of technical and economic aspects, such as investment outlays and the costs of further exploitation, which largely determine the costs of mining operations and the deposit value. Additionally, the operational parameters of the mining equipment ought to be considered. In this study, a universal set of evaluation criteria has been developed, and an evaluation method has been applied for the selection of surface mining equipment and the processing system to be operated in specific mining conditions, defined by the user. The objective of this study is to develop and apply the new methodology of multi-criteria selection of open pit rock mining equipment based on multiple criteria decision-making (MCDM) procedures, to enable the optimization of loading, handling and crushing processes. The methodology, underpinned by the principles of MCDM, provides the dedicated ranking procedures, including the ELECTRE III. The applied methodology allows the alternative options (variants) to be ranked accordingly. Ultimately, a more universal methodology is developed, applicable in other surface mines where geological and mining conditions are similar. It may prove particularly useful in selection and performance assessment of mining equipment and process line configurations in mining of low-quality rock deposits. Therefore, we undertook to develop universal criteria and applications for the selection and performance assessment of process machines for surface mines, taking into account environmental aspects as well as deposit quality.


2017 ◽  
Vol 4 (5) ◽  
pp. 5877-5882 ◽  
Author(s):  
Pawel Maslak ◽  
Grzegorz Przybylek ◽  
Tadeusz Smolnicki

2018 ◽  
Vol 18 (10) ◽  
pp. 7361-7378 ◽  
Author(s):  
Sabour Baray ◽  
Andrea Darlington ◽  
Mark Gordon ◽  
Katherine L. Hayden ◽  
Amy Leithead ◽  
...  

Abstract. Aircraft-based measurements of methane (CH4) and other air pollutants in the Athabasca Oil Sands Region (AOSR) were made during a summer intensive field campaign between 13 August and 7 September 2013 in support of the Joint Canada–Alberta Implementation Plan for Oil Sands Monitoring. Chemical signatures were used to identify CH4 sources from tailings ponds (BTEX VOCs), open pit surface mines (NOy and rBC) and elevated plumes from bitumen upgrading facilities (SO2 and NOy). Emission rates of CH4 were determined for the five primary surface mining facilities in the region using two mass-balance methods. Emission rates from source categories within each facility were estimated when plumes from the sources were spatially separable. Tailings ponds accounted for 45 % of total CH4 emissions measured from the major surface mining facilities in the region, while emissions from operations in the open pit mines accounted for ∼ 50 %. The average open pit surface mining emission rates ranged from 1.2 to 2.8 t of CH4 h−1 for different facilities in the AOSR. Amongst the 19 tailings ponds, Mildred Lake Settling Basin, the oldest pond in the region, was found to be responsible for the majority of tailings ponds emissions of CH4 (> 70 %). The sum of measured emission rates of CH4 from the five major facilities, 19.2 ± 1.1 t CH4 h−1, was similar to a single mass-balance determination of CH4 from all major sources in the AOSR determined from a single flight downwind of the facilities, 23.7 ± 3.7 t CH4 h−1. The measured hourly CH4 emission rate from all facilities in the AOSR is 48 ± 8 % higher than that extracted for 2013 from the Canadian Greenhouse Gas Reporting Program, a legislated facility-reported emissions inventory, converted to hourly units. The measured emissions correspond to an emissions rate of 0.17 ± 0.01 Tg CH4 yr−1 if the emissions are assumed as temporally constant, which is an uncertain assumption. The emission rates reported here are relevant for the summer season. In the future, effort should be devoted to measurements in different seasons to further our understanding of the seasonal parameters impacting fugitive emissions of CH4 and to allow for better estimates of annual emissions and year-to-year variability.


2014 ◽  
Vol 32 (5) ◽  
pp. 397-405
Author(s):  
Md. Obaidul Haque ◽  
Ahmed Sharif

Informal incineration or open pit burning of waste materials is a common practice in the peripheral area of Dhaka, one of the fastest growing mega-cities in the world. This study deals with the effect of open pit burned (i.e. open burned) household waste bottom ash on fired clay bricks. Between 0 to 50% (by weight) of open pit burned household waste bottom ash was mixed with clay to make bricks. The molded specimens were air-dried at room temperature for 24 h and then oven dried at 100 °C for another 24 h to remove the water. The raw bricks were fired in a muffle furnace to a designated temperature (800, 900 and 1000 °C, respectively). The firing behaviour (mechanical strength, water absorption and shrinkage) was determined. The microstructures, phase compositions and leachates were evaluated for bricks manufactured at different firing temperatures. These results demonstrate that open pit burned ash can be recycled in clay bricks. This study also presents physical observations of the incinerated ash particles and determination of the chemical compositions of the raw materials by wet analysis. Open pit burned ash can be introduced easily into bricks up to 20% wt. The concentrations of hazardous components in the leachates were below the standard threshold for inert waste category landfill and their environmental risk during their use-life step can be considered negligible.


2004 ◽  
pp. 69-72
Author(s):  
Changsheng Ji ◽  
Songlin Xia ◽  
Youdi Zhang

2021 ◽  
Vol 303 ◽  
pp. 01029
Author(s):  
Alexander Katsubin ◽  
Victor Martyanov ◽  
Milan Grohol

Information about the geological structure of Kuznetsky coal basin (Kuzbass) allows us to note that coal deposits developed by open-cast method are characterized by complicated conditions and have the following features: large length of deposits at significant depths of occurrence; coal series bedding of different thicknesses (from 1 to 40 m); different dip angles (from 3 to 90º); a significant number of dip and direction disturbances; different thickness of unconsolidated quaternary sediments (from 5 to 40 m); a wide range of strength values of rocks. In addition, there is a thickness irregularity and frequent variability of elements of occurrence of coal seams within the boundaries of a quarry field both in length and depth of mining. From the point of view of open-pit mining, such deposits are complex-structured. The factors listed above have a decisive influence on the choice of technical means, the order of development and the possibility of carrying out surface mining operations. Therefore, there is a need for a systematization of mining and geological conditions for the development of coal deposits, the purpose of which is to ensure a process of evaluation of complex-structured coal deposits for the development of coal-bearing zones by various complexes of equipment.


2021 ◽  
Vol 315 ◽  
pp. 01015
Author(s):  
Alexei Selyukov

With surface mining of inclined and steeply dipping coal deposits, the so-called deeping longitudinal mining methods with a gradual deepening of mining from the surface to the final depth are widely spread, while orienting the mining front along the strike line of the seams (strata). When using such mining methods, the volumes of internal dumping are limited or completely absent; there is a peak-like increase in overburden volumes and transportation distance, the land resources disturbing proceeds at a progressive pace. In this regard, it is obvious that an important production task is to find technological solutions and methods to develop coal deposits that reduce the environmental hazard and increase resource conservation in mining by placing overburden in the mined-out space while reducing the area for external dumps and disturbing the earth's surface. If this is not foreseen at the present time, then all coal surface mines in the coming decades will be limited by their own external dumps of overburden, and their further development will be problematic.


Author(s):  
V.N. Tyupin ◽  

At present, to ensure seismic safety in massive explosions, the analytical dependence of the determination of the vibration velocity of M.A. Sadovsky rock mass is mainly used. This dependence is widely used in the creation of seismic-safe technologies for mineral deposits open-pit and underground mining. However, scientific research and production experience showed that the rate of oscillation depends on the energy parameters of the explosive, the diameter and length of its charges, the number of simultaneously exploded charges, the number of deceleration stages, the deceleration interval, etc. The purpose of this article is to predict the speed fluctuations of the massif on the earth surface when conducting the underground explosions depending on the parameters of large-scale explosions and physical-technical properties of the rock masses in the areas of explosion of the protected object. The formulas for calculating the velocity of rock mass on the earth surface during large-scale explosions in the underground conditions are substantiated and presented. The formulas were used for calculating the vibration velocities of the rock mass on the earth surface in accordance with the parameters of drilling and blasting operations during large-scale explosions in the mines of GK VostGOK. Comparison of theoretical (calculated) data and the results of actual measurements indicates their convergence. By changing the controlled parameters in the calculation formulas, it is possible to quantitatively reduce the seismic effect of a large-scale explosions on the protected objects. Further research will be aimed at studying the influence of tectonic faults, artificial contour crevices, filling massif or mined-out space on the rate of seismic-explosive vibrations during blasting operations in the mines. The research results can be used in the preparation of rules for conducting large-scale explosions at the underground mining.


Author(s):  
P.I. Zuev ◽  
◽  
V.S. Vedernikov ◽  
D.V. Grigoriev ◽  
◽  
...  

The article presents field and calculation methods for determining the rock hardness at the chrysotile-asbestos deposit mined by the open–pit mining. The methods presented are necessary for technological improvement of mining (including optimization of drilling and blasting operations), which, in the turn, improves the economic feasibility of the chrysotile-asbestos mining.