Complexity Analysis and Stochastic Convergence of Some Well-known Evolutionary Operators for Solving Graph Coloring Problem

Mathematics ◽  
2020 ◽  
Vol 8 (3) ◽  
pp. 303 ◽  
Author(s):  
Raja Marappan ◽  
Gopalakrishnan Sethumadhavan

The graph coloring problem is an NP-hard combinatorial optimization problem and can be applied to various engineering applications. The chromatic number of a graph G is defined as the minimum number of colors required to color the vertex set V(G) so that no two adjacent vertices are of the same color, and different approximations and evolutionary methods can find it. The present paper focused on the asymptotic analysis of some well-known and recent evolutionary operators for finding the chromatic number. The asymptotic analysis of different crossover and mutation operators helps in choosing the better evolutionary operator to minimize the problem search space and computational complexity. The choice of the right genetic operators facilitates an evolutionary algorithm to achieve faster convergence with lesser population size N through an adequate distribution of promising genes. The selection of an evolutionary operator plays an essential role in reducing the bounds for minimum color obtained so far for some of the benchmark graphs. This research also focuses on the necessary and sufficient conditions for the global convergence of evolutionary algorithms. The stochastic convergence of recent evolutionary operators for solving graph coloring is newly analyzed.

Author(s):  
A. Guzmán-Ponce ◽  
J. R. Marcial-Romero ◽  
R. M. Valdovinos ◽  
R. Alejo ◽  
E. E. Granda-Gutiérrez

Algorithms ◽  
2021 ◽  
Vol 14 (8) ◽  
pp. 246
Author(s):  
Yuri N. Sotskov ◽  
Еvangelina I. Mihova

This article extends the scheduling problem with dedicated processors, unit-time tasks, and minimizing maximal lateness for integer due dates to the scheduling problem, where along with precedence constraints given on the set of the multiprocessor tasks, a subset of tasks must be processed simultaneously. Contrary to a classical shop-scheduling problem, several processors must fulfill a multiprocessor task. Furthermore, two types of the precedence constraints may be given on the task set . We prove that the extended scheduling problem with integer release times of the jobs to minimize schedule length may be solved as an optimal mixed graph coloring problem that consists of the assignment of a minimal number of colors (positive integers) to the vertices of the mixed graph such that, if two vertices and are joined by the edge , their colors have to be different. Further, if two vertices and are joined by the arc , the color of vertex has to be no greater than the color of vertex . We prove two theorems, which imply that most analytical results proved so far for optimal colorings of the mixed graphs , have analogous results, which are valid for the extended scheduling problems to minimize the schedule length or maximal lateness, and vice versa.


2015 ◽  
Vol 73 ◽  
pp. 138-145 ◽  
Author(s):  
Meriem Bensouyad ◽  
Nousseiba Guidoum ◽  
Djamel-Eddine Saïdouni

Sign in / Sign up

Export Citation Format

Share Document