scholarly journals Evaluation of the Potential of Sasobit REDUX Additive to Lower Warm-Mix Asphalt Production Temperature

Materials ◽  
2019 ◽  
Vol 12 (8) ◽  
pp. 1285 ◽  
Author(s):  
Arminda Almeida ◽  
Michela Sergio

Environmental and health concerns have been increasing in the road construction industry. This industry has provided several techniques and a wide range of additives to lower the production temperatures of asphalt mixtures, generating, among others, a new mix type called warm-mix asphalt (WMA). This paper aims to evaluate the potential of the Sasobit REDUX additive to lower the production temperatures of WMA. This additive, which is an alternative to the well-known Sasobit, is completely soluble in bitumen at temperatures above 85 °C while the same temperature for the Sasobit is 115 °C. For that reason, three target compaction temperatures were considered (90, 100 and 110 °C) and both Marshall and compactability tests were carried out. A hot-mix asphalt (HMA) was tested in parallel for comparison. It was concluded that the volumetric properties (air voids content about 4%) and the Marshall properties (stability about 11 kN, flow about 4 mm and Marshall quotient higher than 2 kN/km) of the Sasobit REDUX-WMA were globally satisfactory. In relation to the compactability test, the Sasobit REDUX-WMA mixtures were relatively easier to be compacted compared to the HMA mixture. The three Sasobit REDUX-WMA mixtures (90, 100 and 110 °C) exhibited a very similar compactability (differences lower than 0.4%). Therefore, it seems reasonable to conclude that the Sasobit REDUX has potential to lower WMA production temperatures by 20 °C. A reduction of that magnitude would lead to significant environmental gains.

2013 ◽  
Vol 723 ◽  
pp. 639-647
Author(s):  
Andreas Biedermann ◽  
Christian Jacobi ◽  
Andrea Bieder

New technologies enable the manufacturing of asphalt at reduced temperatures. As a result The energy consumption per ton of asphalt and the emissions at the road construction site drop significantly. Whilst conventional asphalt is produced at around 170 ° C, the low - temperature processes of today allow production temperatures of around 100 ° C. Various technologies for this are ready for application by road construction industry. Foam bitumen, waxes and other additives, special bitumen or alternative mixing cycles can be suitable for use, depending on the application. Changing the way of asphalt production in an industry takes several years or even decades. In this paper, we will present low temperature asphalt technologies based on the promising technology of foam bitumen and how they are applied in practice.


2021 ◽  
Vol 83 (4) ◽  
pp. 63-74
Author(s):  
Zulfiqar Ali Jattak ◽  
Norhidayah Abdul Hassan ◽  
Mohd Khairul Idham Mohd Satar ◽  
Ramadhansyah Putra Jaya ◽  
‪Mohd Rosli Hainin

Bottom Ash (BA), a coal combustion by-product, found to be a potential material when used to produce asphalt mixture. However, some of its characteristics make it a questionable material for the surface course. Therefore, this study aims to evaluate the compatibility of BA in Warm Mix Asphalt (WMA) technology through the basic mechanical properties of the asphalt mixtures for binder course layer (AC 28). Two WMA chemical additives, Cecabase RT and Evotherm 3G, were used at the concentrations of 0.3, 0.4 and 0.5% from the binder's weight. The binder properties were assessed through penetration, softening point and viscosity tests. The Marshall mix design was used to determine the optimum binder content (OBC). The additive dosage and production temperature for WMA were determined through Marshall stability, flow, air voids and specific gravity. The results show that the additives did not significantly affect the binder properties, although, at 0.4% Evotherm 3G, a drop of 17.5% in penetration was observed. Cecabase RT produced WMA with promising results but did not enhance the workability of WMA containing bottom ash (BAWMA). By lowering the production temperature of 25 °C, WMA and BAWMA at 0.4 %, Evotherm 3G demonstrated comparable workability to the conventional Hot Mix Asphalt (HMA). The data achieved through this study would be a guiding approach towards the application of BA in WMA technology for sustainable pavements.


2021 ◽  
Vol 13 (6) ◽  
pp. 3315
Author(s):  
Mansour Fakhri ◽  
Danial Arzjani ◽  
Pooyan Ayar ◽  
Maede Mottaghi ◽  
Nima Arzjani

The use of waste materials has been increasingly conceived as a sustainable alternative to conventional materials in the road construction industry, as concerns have arisen from the uncontrolled exploitation of natural resources in recent years. Re-refined acidic sludge (RAS) obtained from a waste material—acidic sludge—is an alternative source for bitumen. This study’s primary purpose is to evaluate the resistance of warm mix asphalt (WMA) mixtures containing RAS and a polymeric additive against moisture damage and rutting. The modified bitumen studied in this research is a mixture of virgin bitumen 60/70, RAS (10, 20, and 30%), and amorphous poly alpha olefin (APAO) polymer. To this end, Marshall test, moisture susceptibility tests (i.e., tensile strength ratio (TSR), residual Marshall, and Texas boiling water), resilient modulus, and rutting assessment tests (i.e., dynamic creep, Marshall quotient, and Kim) were carried out. The results showed superior values for modified mixtures compared to the control mix considering the Marshall test. Moreover, the probability of a reduction in mixes’ moisture damage was proved by moisture sensitivity tests. The results showed that modified mixtures could improve asphalt mixtures’ permanent deformation resistance and its resilience modulus. Asphalt mixtures containing 20% RAS (substitute for bitumen) showed a better performance in all the experiments among the samples tested.


2011 ◽  
Vol 19 (1) ◽  
pp. 301-301 ◽  
Author(s):  
Sippy K. Chauhan ◽  
Anuradha Shukla ◽  
S. Gangopadhyay ◽  
Sangita Sharma

2018 ◽  
Vol 219 ◽  
pp. 04003 ◽  
Author(s):  
Hubert Anysz ◽  
Krzysztof Kaczorek

The existing system of bids evaluation in the construction industry does not bring the clients the certainty if all placed bids comprise real, achievable prices. Especially in the road construction sector, where the earthworks create significant part of the works, comparing e.g. the price of 1 km of roads often gives misleading results. The paper comprises the complete proposal to modify the scope of information provided by offerors in the public procurements (in the construction industry) allowing the clients to determine easily if the contractors have placed the consistent offers i.e. if the bid prices are not too high and if the lowest bid price is not a dumping price. The Conjugated Triangle Method (CTM) of inconsistent bid detection in construction industry is based on the three inter-related parameters: means of production, time of works, on the value of works. Regardless of the offered price it should match the other two parameters.


2015 ◽  
Vol 10 (1) ◽  
pp. 79-88 ◽  
Author(s):  
Xinsheng Li ◽  
Zhaoxing Xie ◽  
Wenzhong Fan ◽  
Lili Wang ◽  
Junan Shen

The objective of this research was to select the most effective warm asphalt additives for mix practice based on a series of laboratory testing programs such as density, Marshall stability, freeze-thaw splitting strength, dynamic stability, and bending beam strain. The experimental design of warm mix asphalt included the use of three commonlyused additives, two typical aggregate gradations, one crushed aggregate, and one modified asphalt. Results showed that: (1) the bulk specific gravity and air voids of all the mix specimens were similar to those of controls; (2) the Marshall stability and flow values of the warm stone mastic asphalt were 6.8%–26.6% and 3.5%–10.3%% higher than those of controls, respectively, and those of the warm asphalt concrete were 6.1%–15.6% and 6.5%–9.7% higher than those of controls, respectively; (3) the indirect tensile strength of two types of mixtures was 1.7%–14.4% lower than that of controls, and the average tensile strength ratio of the warm stone mastic asphalt and asphalt concrete was 4.3% and 1.3% higher than that of controls, respectively; (4) the dynamic stability of warm mix specimens was 10.8%–16.6% lower than that of the controls; (5) the average bending failure strain of warm stone mastic asphalt was 7.6% higher than that of the controls, and that of warm asphalt concrete was 12.8% lower than that of the controls; (6) Overall, warm asphalt mixtures with Sasobit and Rediset had relatively best performances required in Southeast China, where rutting and stripping are the main failures of asphalt pavements.


Jurnal CIVILA ◽  
2018 ◽  
Vol 3 (2) ◽  
pp. 154
Author(s):  
Errine Yulia Rizqi Intanti ◽  
Zulkifli Lubis

In Indonesia, the road construction has experienced a fairly good development. From a wide range of road constructions, flexible pavement is the most chosen one because its characteristics: easy, fast, and efficient. However, flexible pavement has many weaknesses, for example the premature damage on the road surface after some time passed by the traffic so that the road cannot reach the planned age. For that, it is done a research to add a hot asphalt mixture material that aims to improve the quality of the mixture results. The selected ingredient is natural water hyacinth. The method used is trial and error with reference of SNI 03-1737-1989. Variations used are 2%, 4%, 6%, 8% and 10% of the asphalt weight, asphalt level used is 5.72 %. Of the 5 variations of mixture used on Type XI Asphalt Concrete Layer, it is obtained the result that the water hyacinth fiber level which has the best score and meet the specifications of SNI 03-1737-1989 is on the percentage of 6% which obtained from calculation data using graphs and regression model where Marshall Stability is equal to 644,46 Kg, flow 3,39 mm, VMA (voids in the mineral aggregate) is equal to 13,83 %, VFWA (voids filled with asphalt) is equal to 65,35%, VIM (voids in the mix) is equal to 2,52 %, density of 2.31 gr/cc, and Marshall Quotient of 164.03 Kg / mm.


2017 ◽  
Vol 67 (327) ◽  
pp. 123 ◽  
Author(s):  
A. M. Rodríguez-Alloza ◽  
J. Gallego

Warm Mix Asphalt (WMA) refers to technologies that reduce manufacturing and compaction temperatures of asphalt mixtures allowing lower energy consumption and reducing greenhouse gas emissions from asphalt plants. These benefits, combined with the effective reuse of a solid waste product, make asphalt rubber (AR) mixtures with WMA additives an excellent environmentally-friendly material for road construction. The effect of WMA additives on rubberized mixtures has not yet been established in detail and the lower mixing/compaction temperatures of these mixtures may result in insufficient compaction. In this sense, the present study uses a series of laboratory tests to evaluate the volumetric characteristics and compactability of AR mixtures with organic additives when production/compaction temperatures are decreased. The results of this study indicate that the additives selected can decrease the mixing/compaction temperatures without compromising the volumetric characteristics and compactability.


2021 ◽  
Vol 7 (3) ◽  
pp. 594-613
Author(s):  
Pardeep Kumar Oad ◽  
Stephen Kajewski ◽  
Arun Kumar ◽  
Bo Xia

Tender evaluation is the procedure of choosing the best contractor for a particular project from many applicants. Although rational and logical methods can be used for bidding strategies, bid evaluation remains a skill for which an engineer’s verdict is crucial. Contractors commonly witness that tender selection is not an easy job, and the lowest bid does not necessarily win the contract. The tender decision mainly depends on quantifiable measures such as financial costs and paybacks, and qualitative or invisible factors like administrative security accountability, aptitude, and the proficiency of the contractors. Moreover, Bid evaluation is a decision-making procedure that incorporates an extensive criteria range for which the information is not accordingly. Hence, ambiguity linked to such information is not appropriate for this study. This paper aims to evaluate innovation during the bid evaluation process in the road industry. The research results indicate that the private and public sectors in Australia offer innovative products and work methods, given the chance. Therefore, innovation during the bid evaluation process is welcomed and sometimes strongly encouraged. Further, it is important to have strong research in to how to effectively determine value for money in the context of developing suitable and quality roads. Therefore, this research is useful in the context of evaluating factors that help to understand value for money in the road sector in context of bid evaluation process. Doi: 10.28991/cej-2021-03091676 Full Text: PDF


Energies ◽  
2018 ◽  
Vol 11 (11) ◽  
pp. 3025 ◽  
Author(s):  
Syyed Raheel Shah ◽  
Hunain Arshad ◽  
Ahsan Waqar ◽  
Muhammad Saeed ◽  
Salman Hafeez ◽  
...  

Energy consumption and material production are two major factors associated with the road construction industry. Worldwide, millions of tons of hot mix asphalt production consume a huge amount of fuel as an energy source in terms of quantity and cost to achieve the standard temperature of up to 170 °C during the mixing process. Modification of bitumen can not only reduce its usage but also the consumption of energy (fuel) during the asphalt mix production process at low temperatures. This study provides a method to save energy by proposing the addition of bitumen modifier in the road construction sector. Furthermore, to make it compatible with the field conditions for road construction, stability analysis is executed on the prepared samples by partially replacing the bitumen with polyurethane foam (PUF) and plastic waste (PW) (at 10%, 20%, 30%, 40%, and 50%). Experimental results demonstrate a reasonable saving in the amount of energy (33%) and material (40% bitumen) used and showed that similar strength of developed asphalt mix can be achieved using PUF. An extensive calculation concludes that these savings could make a huge difference in construction economics of mega road infrastructure projects, especially during an energy crisis.


Sign in / Sign up

Export Citation Format

Share Document