scholarly journals Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies

2019 ◽  
Vol 4 (2) ◽  
pp. 14 ◽  
Author(s):  
Mohammadreza Habibi ◽  
Sharareh Kermanshachi ◽  
Behzad Rouhanizadeh

Delay and cost overrun in construction projects are two widespread problems that arouse practitioners’ and scholars’ concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and Construction (EPC) phases separately and then calculate the weight impact that is associated with each of identified KPIs. Additionally, this study aimed to find the most appropriate Best Practices (BPs) for the identified phase-based indicators. Through a review of existing literature, a survey was developed to collect data from the completed construction projects. Various statistical methods, including two sample T-test and Kruskal-Wallis test, were utilized to analyze the data. Subsequently, Epsilon-Squared effect size method was applied to prioritize the identified KPIs. Since the lack of communication and slowness in decision making were found as the primary schedule Performance Indicators, schedule performance was identified to be highly affected by managerial approaches and actions. In addition, clients play a decisive role, because owner-driven change orders were found as the most crucial cost performance indicator affecting the performance of the engineering and construction phases. The outcome of this study helps practitioners and scholars to understand the phase-based cost and schedule KPIs, and appropriate mitigating strategies to improve the construction performance in EPC phases and save time and money.

2021 ◽  
Vol 11 (1) ◽  
pp. 6668-6673
Author(s):  
M. Mbugua ◽  
P. O. Ajwang' ◽  
M. Winja

Building construction projects suffer from many dangers such as cost and time overruns. A major reason for the failure of such projects is the lack of measurements of the construction performance. There is usually a disparity of judgment among the stakeholders when it comes to the perception of failure and success of a building construction project because it is based on personal indices. The aim of this study is to identify and rank the key performance indicators in their relative importance as a way to assist in building construction performance. A thorough literature review was conducted and 10 key performance indicators were identified. A questionnaire survey and interviews were used to collect data and the results were analyzed using the analytical hierarchical process, pair-wise comparison. As a result, the highest prioritized key performance indicator was safety, followed by time effectiveness and client satisfaction. The least prioritized key performance indicator was the environmental performance. The results of this paper may serve as a guideline in improving building construction projects.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2015 ◽  
Vol 4 (2) ◽  
pp. 288 ◽  
Author(s):  
Nabil Al-Hazim ◽  
Zaydoun Abusalem

This study aims to identify the most important factors that cause delay in road construction projects in Jordan, which results in cost and time overrun allocated for this type of engineering projects and cause critical problems for both the developer and the contractor. The gap between the cost at completion and that originally estimated, known as cost overrun, can be regarded as one of the most important parameters reflecting the success of projects. In the public sector, money spent on project change orders results in increased construction time which in return reduces the number and size of the projects that can be completed during any given fiscal year. To achieve this goal, the documents and the final reports for several sample projects implemented over the years 2000 to 2008 were analyzed. All the projects were administered by the same organization taken from Jordan Ministry of Rural and Public Works. The results of this study can assist highway officials in their design, planning, scheduling and projects completions so that necessary actions can be taken to control these overruns in future projects. The study showed that 19 factors might cause delays of road construction projects as defined through a detailed literature review. The analysis of the study indicated that the top causes affecting time and cost overrun in road construction projects in Jordan are Terrain and Weather conditions.


In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper's objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.


Author(s):  
ibraheem Aidan ◽  
Firas Jaber ◽  
Duaa Al-Jeznawi ◽  
Faiq Al-Zwainy

The importance of this study may be defined by using the smart techniques to earned value indicators of residential buildings projects in Republic of Iraq, only one development intelligent forecasting model was presented to predict Schedule Performance Index (SPI), Cost Performance Index (CPI), and To Complete Cost Performance Indicator (TCPI) are defined as the dependent. The approach is principally influenced by the determining numerous factors which effect on the earned value management, that involves Iraqi historical data. In addition, six independent variables (F1: BAC, Budget at Completion., F2: AC, Actual Cost., F3, A%, Actual Percentage., F4: EV, Earned Value. F5: P%, Planning Percentage., and F6: PV, Planning Value) were arbitrarily designated and satisfactorily described for per construction project. It was found that ANN has the capability to envisage the dust storm with a great accuracy. The correlation coefficient (R) has been 90.00%, and typical accuracy percentage has been 89.00%.


Author(s):  
Manu Noushad ◽  
Anu V. Thomas ◽  
Ramaswamy K. P

Construction projects experience claims and disputes due to increased complexity of contract documentation, which subsequently affects the cost performance of projects. Majority of the previous studies on disputes and cost overrun have mainly focused on finding the causes of cost overrun or disputes in the industry. Identification of dispute prone areas and the associated range of cost overrun due to the disputes are less explored. Previous research findings indicate that the various factors resulting in cost overrun itself are the causes of disputes. It is necessary to understand, assess and take appropriate actions for increasing the predictability of claims and disputes in order to improve the cost performance of construction projects. In this study, an attempt is made to identify and prioritize the dispute prone areas in Indian construction projects by analytical hierarchy process (AHP).


2011 ◽  
Vol 4 (9) ◽  
pp. 9 ◽  
Author(s):  
Kritsana Sukboonyasatit ◽  
Chaiwit Thanapaisarn ◽  
Lampang Manmar

The research objective was to develop public universities key performance indicators. Qualitative research and interviews were employed with each public universitys senior executive and quality assessors. The sample group was selected by the office of the public sector development commission and Thailands public universities can be separated into three groups based on their quality assessment score: 1) the high scoring group, 2) the moderate scoring group, and 3) the low scoring group. The results showed that the high scoring group had set a clear strategic context such as vision, mission, core values and corporate goals. In the case of the moderate scoring group it was found that some sections of the strategic context, such as the vision and mission, had already been defined, but corporate goals were yet to be determined. The strategic context was not clear and remained inactive for the low scoring group. In additional, each public university should establish two different sets of key performance indicators; first, a common key performance indicator which is aligned with the public university mission to enhance macro education, and which can be separated by five assessment perspectives as follows: 1) to produce graduates, 2) to promote and expand the universitys research, 3) to provide academic services, 4) to preserve and promote the arts, culture and heritage, and 5) to manage the university. The second specific key performance indicator should be aligned with the universitys strategic context, especially its vision and goals.


2012 ◽  
Vol 446-449 ◽  
pp. 340-344
Author(s):  
Mehdi Nourbakhsh ◽  
Shaik Hussein Mydin ◽  
Rosli Mohamad Zin ◽  
Samaneh Zolfagharian ◽  
Javier Irizarry ◽  
...  

2018 ◽  
Vol 5 (1) ◽  
Author(s):  
Joko Hardono

Pengukuran kinerja Supply Chain PT. XYZ hanya melihat dari produktivitas perusahaan. Produktivitas hanya mampu mengukur kinerja proses internal, pada proses internal dalam satu hubungan rantai pasok. Perusahaan perlu merancang model pengukuran kinerja supply chain secara keseluruhan dan terintegrasi dalam suatu hubungan kausal, mulai dari pemasok, proses internal kepada pelanggan, untuk mengetahui efektivitas perusahaan rantai pasokan. balanced scorecard memenuhi perspektif yang diperlukan. Model balanced scorecard digunakan sebagai kerangka kerja untuk merancang Key Performance Indicator (KPI) dari kinerja supply chain PT. XYZ. KPI adalah desain berdasarkan 4 perspektif, yaitu: proses internal, pelanggan, pembelajaran dan pertumbuhan dan perspektif keuangan. Pembobotan untuk menentukan prioritas antara perspektif dan KPI dilakukan dengan menggunakan Analytical Hierarchy Process (AHP). Hasil dari analisis dihasilkan 20 KPI. perspektif proses internal yang berisi 9 KPI dengan berat total 21,0%, perspektif pelanggan berisi 6 KPI dengan berat total 42,6%, Belajar dan perspektif pertumbuhan berisi 4 KPI dengan berat total 17,5%, perspektif Pemegang Saham mengandung 1 KPI dengan total berat 19,0. Kata kunci: Key Performance Indicator, Supply Chain, Balanced Scorecard, Analytical Hierarchy proceses