scholarly journals An Integer Linear Programming Model to Select and Temporally Allocate Resources for Fighting Forest Fires

Forests ◽  
2018 ◽  
Vol 9 (10) ◽  
pp. 583 ◽  
Author(s):  
Jorge Rodríguez-Veiga ◽  
María Ginzo-Villamayor ◽  
Balbina Casas-Méndez

Optimal planning of the amount and type of resources needed for extinguishing a forest fire is a task that has been addressed in the literature, using models obtained from operational research. In this study, a general integer linear programming model is proposed, which addresses the allocation of resources in different time periods during the planning period for extinguishing a fire, and with the goal of meeting Spanish regulations for the non-negligence of fronts and periods of rest for pilots and brigades. A computer program and interface were developed using the R language. By means of an example using historical data, we illustrate the model at work and its exact resolution. Then, we carry out a simulation study to analyze the obtained objective functions and resolution times. Our simulation study shows that an exact solution can be obtained very quickly without requiring heuristic algorithms, provided that the planning period does not exceed five hours.

2015 ◽  
Vol 2015 ◽  
pp. 1-11
Author(s):  
YuFeng Chen ◽  
Abdulrahman Al-Ahmari ◽  
Chi Tin Hon ◽  
NaiQi Wu

This paper focuses on the enforcement of nonlinear constraints in Petri nets. An integer linear programming model is formulated to transform a nonlinear constraint to a minimal number of conjunctive linear constraints that have the same admissible marking space as the nonlinear one does in Petri nets. The obtained linear constraints can be easily enforced to be satisfied by a set of control places with a place invariant based method. The control places make up a supervisor that can enforce the given nonlinear constraint. For a case that the admissible marking space decided by a nonlinear constraint is nonconvex, another integer linear programming model is developed to obtain a minimal number of constraints whose disjunctions are equivalent to the nonlinear constraint with respect to the reachable markings. Finally, a number of examples are provided to demonstrate the proposed approach.


Energies ◽  
2019 ◽  
Vol 12 (4) ◽  
pp. 636 ◽  
Author(s):  
Aristotle Ubando ◽  
Isidro Marfori ◽  
Kathleen Aviso ◽  
Raymond Tan

Community-based off-grid polygeneration plants based on micro-hydropower are a practical solution to provide clean energy and other essential utilities for rural areas with access to suitable rivers. Such plants can deliver co-products such as purified water and ice for refrigeration, which can improve standards of living in such remote locations. Although polygeneration gives advantages with respect to system efficiency, the interdependencies of the integrated process units may come as a potential disadvantage, due to susceptibility to cascading failures when one of the system components is partially or completely inoperable. In the case of a micro-hydropower-based polygeneration plant, a drought may reduce electricity output, which can, in turn, reduce the level of utilities available for use by the community. The study proposes a fuzzy mixed-integer linear programming model for the optimal operational adjustment of an off-grid micro-hydropower-based polygeneration plant seeking to maximize the satisfaction levels of the community utility demands, which are represented as fuzzy constraints. Three case studies are considered to demonstrate the developed model. The use of a diesel generator for back-up power is considered as an option to mitigate inoperability during extreme drought conditions.