scholarly journals Investigation of Operating Parameters and Degradation of Photovoltaic Panels in a Photovoltaic Power Plant

Energies ◽  
2019 ◽  
Vol 12 (19) ◽  
pp. 3631 ◽  
Author(s):  
Dušan Kudelas ◽  
Marcela Taušová ◽  
Peter Tauš ◽  
Ľubomíra Gabániová ◽  
Ján Koščo

Recently, the use of photovoltaic (PV) cells and the increase in the number of photovoltaic power plants has led to a detailed examination of their operating parameters. In this article, we discuss material and operating parameter influences on the performance and efficiency of photovoltaic panels in a photovoltaic power plant. The plant consisted of 3600 pieces of polycrystalline PV panels from Renewable Energy Corporation (REC) Solar (type REC 230AE) with a maximum power of 230 Wp. Parameter measurements were made three years after the power plant was started. The measured and computed data were statistically processed using multidimensional statistical methods where the relationships between input and output variables were examined, which was subsequently quantified by regression analysis. Using the ANOVA, the variability of the measured efficiency of the panels and the performance for individual years was examined. Efficiency has been found to increase significantly over the years. The reason for this is the statistically proven prevailing operating time of the PV power plant in conditions with lower temperature than standard operating conditions (25 °C). Ageing was not confirmed in optimal conditions and calculated efficiency was constant.

2018 ◽  
Vol 168 ◽  
pp. 06008
Author(s):  
Peter Tauš ◽  
Jana Tomčejová ◽  
Marcela Taušová ◽  
Ľubomíra Gabániová ◽  
Dušan Kudelas ◽  
...  

The paper deals with the results of research on the influence of material and operating parameters on the performance characteristics and efficiency of photovoltaic panels. The disadvantage of PV panels is that their performance depends on a number of factors such as the intensity of the sun's radiation, the outside air temperature, the surface temperature of the photovoltaic panel, its pollution, shielding, etc. In the paper is analyzed the model photovoltaic power plant, from which data were obtained during the monitored period and subsequently the progress of individually measured parameters was evaluated.


2022 ◽  
Vol 0 (0) ◽  
Author(s):  
Qusay Hassan ◽  
Saadoon Abdul Hafedh ◽  
Ali Hasan ◽  
Marek Jaszczur

Abstract The study evaluates the visibility of solar photovoltaic power plant construction for electricity generation based on a 20 MW capacity. The assessment was performed for four main cities in Iraq by using hourly experimental weather data (solar irradiance, wind speed, and ambient temperature). The experimental data was measured for the period from 1st January to 31st December of the year 2019, where the simulation process was performed at a 1 h time step resolution at the same resolution as the experimental data. There are two positionings considered for solar photovoltaic modules: (i) annual optimum tilt angle and (ii) two-axis tracking system. The effect of the ambient temperature and wind on the overall system energy generated was taken into consideration. The study is targeted at evaluating the potential solar energy in Iraq and the viability of electricity generation using a 20 MW solar photovoltaic power plant. The results showed that the overall performance of the suggested power plant capacity is highly dependent on the solar irradiance intensity and the ambient temperature with wind speed. The current 20 MW solar photovoltaic power plant capacity shows the highest energy that can be generated in the mid-western region and the lowest in the northeast regions. The greatest influence of the ambient temperature on the energy genrated by power plants is observed in the southern regions.


Author(s):  
G. Hariharan ◽  
B. Kosanovic

The ability of modern power plant data acquisition systems to provide a continuous real-time data feed can be exploited to carry out interesting research studies. In the first part of this study, real-time data from a power plant is used to carry out a comprehensive heat balance calculation. The calculation involves application of the first law of thermodynamics to each powerhouse component. Stoichiometric combustion principles are applied to calculate emissions from fossil fuel consuming components. Exergy analysis is carried out for all components by the combined application of the first and second laws of thermodynamics. In the second part of this study, techniques from the field of System Identification and Linear Programming are brought together in finding thermoeconomically optimum plant operating conditions one step ahead in time. This is done by first using autoregressive models to make short-term predictions of plant inputs and outputs. Then, parameter estimation using recursive least squares is used to determine the relations between the predicted inputs and outputs. The estimated parameters are used in setting up a linear programming problem which is solved using the simplex method. The end result is knowledge of thermoeconomically optimum plant inputs and outputs one step ahead in time.


2013 ◽  
Vol 68 (10) ◽  
pp. 2220-2227 ◽  
Author(s):  
Elif Senturk

This paper investigates the treatment of zinc-cyanide electroplating rinse water using an electrocoagulation process (ECP). The effects of operating parameters such as electrode material, current density (2.5–40 A/m2), operating time (0–60 min), initial pH (5–12) and electrode connection mode (monopolar parallel (MP-P), monopolar series and bipolar series) on the ECP were evaluated to find the optimum operating conditions. At 20 A/m2, 60 min, the highest removal efficiencies were obtained with 85 and 99% for Fe and 64 and 33% for Al electrodes, for cyanide and zinc, respectively. The optimum operating conditions were found to be 30 A/m2 and 40 min, for the Fe electrode at the original pH (9.5) of the rinse water. Considering efficiency and economy, the MP-P connection mode was determined as the optimum connection mode.


Energies ◽  
2019 ◽  
Vol 12 (12) ◽  
pp. 2356 ◽  
Author(s):  
Ferdinando Chiacchio ◽  
Fabio Famoso ◽  
Diego D’Urso ◽  
Luca Cedola

Grid-connected low voltage photovoltaic power plants cover most of the power capacity installed in Italy. They offer an important contribution to the power demand of the utilities connected but, due to the nature of the solar resource, the night-time consumption can be satisfied only withdrawing the energy by the national grid, at the price of the energy distributor. Thanks to the improvement of storage technologies, the installation of a system of battery looks like a promising solution by giving the possibility to increase auto-consumption dramatically. In this paper, a model-based approach to analyze and discuss the performance and the economic feasibility of grid-connected domestic photovoltaic power plants with a storage system is presented. Using as input to the model the historical series (2008–2017) of the main ambient variables, the proposed model, based on Stochastic Hybrid Fault Tree Automaton, allowed us to simulate and compare two alternative technical solutions characterized by different environmental conditions, in the north and in the south of Italy. The performances of these systems were compared and an economic analysis, addressing the convenience of the storage systems was carried out, considering the characteristic useful-life time, 20 years, of a photovoltaic power plant. To this end the Net Present Value and the payback time were evaluated, considering the main characteristics of the Italian market scenario.


2020 ◽  
Vol 12 (20) ◽  
pp. 3420 ◽  
Author(s):  
Alexandra I. Khalyasmaa ◽  
Stanislav A. Eroshenko ◽  
Valeriy A. Tashchilin ◽  
Hariprakash Ramachandran ◽  
Teja Piepur Chakravarthi ◽  
...  

This article highlights the industry experience of the development and practical implementation of a short-term photovoltaic forecasting system based on machine learning methods for a real industry-scale photovoltaic power plant implemented in a Russian power system using remote data acquisition. One of the goals of the study is to improve photovoltaic power plants generation forecasting accuracy based on open-source meteorological data, which is provided in regular weather forecasts. In order to improve the robustness of the system in terms of the forecasting accuracy, we apply newly derived feature introduction, a factor obtained as a result of feature engineering procedure, characterizing the relationship between photovoltaic power plant energy production and solar irradiation on a horizontal surface, thus taking into account the impacts of atmospheric and electrical nature. The article scrutinizes the application of different machine learning algorithms, including Random Forest regressor, Gradient Boosting Regressor, Linear Regression and Decision Trees regression, to the remotely obtained data. As a result of the application of the aforementioned approaches together with hyperparameters, tuning and pipelining of the algorithms, the optimal structure, parameters and the application sphere of different regressors were identified for various testing samples. The mathematical model developed within the framework of the study gave us the opportunity to provide robust photovoltaic energy forecasting results with mean accuracy over 92% for mostly-sunny sample days and over 83% for mostly cloudy days with different types of precipitation.


Author(s):  
Erik Rosado Tamariz ◽  
Norberto Pe´rez Rodri´guez ◽  
Rafael Garci´a Illescas

In order to evaluate the performance of new turbo gas power plants for putting in commercial operation, it was necessary to supervise, test and, if so the case, to approve the works of commissioning, operational and acceptance of all equipments and systems that constitute the power plant. All this was done with the aim of guaranteeing the satisfactory operation of these elements to accomplish the function for which they were developed. These activities were conducted at the request of the customer to confirm and observe that the evidence of the tests was carried out according to the specifications and international regulations. The putting into commercial operation activities were done in collaboration with the supplier and manufacturer of equipment, the client and the institution responsible for certification and approval of the plant. All this in a logical and chronological order for the sequence of commissioning tests, operation and acceptance. Commissioning tests were carried out on-site at normal operating conditions, according to the design and operation needs of each power plant of a group of 14. Once the commissioning tests were completely executed and in a satisfactory manner, operational tests of the plants were developed. This was done by considering that they must operate reliable, stable, safe and automatically, satisfying at least, one hundred hours of continuous operation at full load. After evaluating the operational capacity of the machine, it was necessary to determinate the quality of the plant by carrying out a performance test. Finally, it was verified if every unit fulfills the technical requirements established in terms of heat capacity of the machine, noise levels and emissions. As a result of this process, it is guaranteed to the customer that the turbo gas power plants, their systems and equipments, satisfy the requirements, specifications and conditions in agreement with the supplier and manufacturers referring to the putting into commercial operation of the plant.


Author(s):  
Cesar Celis ◽  
Sergio Peralta ◽  
Walter Galarza

Abstract The influence of different power augmentation techniques used in gas turbines on the performance of simple cycle type power plants is assessed in this work. A computational model and tool realistically describing the performance of a typical simple cycle type power plant at design and off-design point conditions is initially developed. This tool is complemented with different models of power augmentation technologies. Finally, the whole model including both power plant and power augmentation techniques is used to analyze a case study involving a particular power plant in Peru. The results from the simulations of the specific power plant indicate that power output can be increased through all the evaluated power augmentation technologies. These results show indeed that technologies based on absorption refrigeration systems produce the largest gains in terms of power output (7.1%) and thermal efficiency (0.7%). Such results confirm the suitability of these systems for simple cycle type power plant configurations operating under hot and humid operating conditions as those accounted for here. From an economic perspective, considering the net present value as the key parameter defining the feasibility of a project in this category, power augmentation techniques based on absorption cooling systems result also the most suitable ones for the studied power plant. Power augmentation techniques environmental implications are also quantified in terms of CO2 emissions.


2019 ◽  
Vol 122 ◽  
pp. 02004 ◽  
Author(s):  
Javier Menéndez ◽  
Jorge Loredo

In 2017, electricity generation from renewable sources contributed more than one quarter (30.7%) to total EU-28 gross electricity consumption. Wind power is for the first time the most important source, followed closely by hydro power. The growth in electricity from photovoltaic energy has been dramatic, rising from just 3.8 TWh in 2007, reaching a level of 119.5 TWh in 2017. Over this period, the contribution of photovoltaic energy to all electricity generated in the EU-28 from renewable energy sources increased from 0.7% to 12.3%. During this period the investment cost of a photovoltaic power plant has decreased considerably. Fundamentally, the cost of solar panels and inverters has decreased by more than 50%. The solar photovoltaic energy potential depends on two parameters: global solar irradiation and photovoltaic panel efficiency. The average solar irradiation in Spain is 1,600 kWh m-2. This paper analyzes the economic feasibility of developing large scale solar photovoltaic power plants in Spain. Equivalent hours between 800-1,800 h year-1 and output power between 100-400 MW have been considered. The profitability analysis has been carried out considering different prices of the electricity produced in the daily market (50-60 € MWh-1). Net Present Value (NPV) and Internal Rate of Return (IRR) were estimated for all scenarios analyzed. A solar PV power plant with 400 MW of power and 1,800 h year-1, reaches a NPV of 196 M€ and the IRR is 11.01%.


2013 ◽  
Vol 448-453 ◽  
pp. 2239-2244
Author(s):  
Yi Zhao ◽  
Li Liu ◽  
Wen Yao Sun ◽  
Quan Ping Zou

Smart Grid framework to achieve clean energy friendly access, to achieve energy conservation and reduction of environmental pollution, is to build the smart grid hallmark. Photovoltaic power plants grid, although to bring some impact on the grid, but also a certain role in promoting on the line loss rate decreased. This ignores the impact of other factors, only from the perspective satisfy voltage constraints, analyzing PV power plant different grid location and grid capacity for line loss rate.