scholarly journals Optimum Placement of Distribution Generation Units in Power System with Fault Current Limiters Using Improved Coyote Optimization Algorithm

Entropy ◽  
2021 ◽  
Vol 23 (6) ◽  
pp. 655
Author(s):  
Hisham Alghamdi

Electric power frameworks become intensely loaded because of the expanded power demand, and as a result, the power system faces great power losses and fault currents. The integration of Distribution Generation (DG) units plays a key role in minimizing the load pressure on a power system. DGs are transmitted with a high fault current, which surpasses the evaluations of circuit breakers. This paper presents various DG units’ optimal placement with Fault Current Limiters (FCLs) in different phases. The Improved Coyote Optimize Algorithm (ICOA) and Electrical Transient Analyzer Program (ETAP) are assessed for the proposed technique in terms of normal and faulty working status. Similarly, to enhance the efficiency of a distribution system, a fuzzy-based multi-objective mechanism is applied. The proposed method is employed on an IEEE 21-bus and 28-bus distribution system. The simulation analysis proved that the power losses and fault levels are reduced at an acceptable level.

2020 ◽  
Author(s):  
Alexandre Bitencourt ◽  
Daniel H. N. Dias ◽  
Bruno W. França ◽  
Felipe Sass ◽  
Guilherme G. Sotelo

The increase in demand for electric power and the insertion of a distributed generation led to the rise of the short-circuit current in substations. Most of these Brazilian substations were designed decades ago, because of that their equipment may not support the new short-circuit current levels. To protect the installed equipment and avoid excessive costs replacing old devices, it is possible to install Fault Current Limiters (FCLs). This document is a report from an R&D project that evaluated FCL topologies considering real parameters in simulation from used equipment, concluding that the selected FCL topologies accomplished their technical objective. However, before implementing these topologies in the distribution system, one should consider the technical and economic feasibility of using semiconductor switching devices.


Author(s):  
Sarfaraz Nawaz ◽  
Ajay Bansal ◽  
M. P. Sharma

<p>A novel approach is proposed in this paper for optimal placement of DG units in reconfigured distribution system with the aim of reduction of real power losses while satisfying operating constraints. The proposed analytical method for optimal DG placement is developed based on a new mathematical formulation. Type-I and type-II DG units are used here. The results of the proposed technique are validated on IEEE 69 bus distribution system. The level of DG penetration is also considered in a range of 0–50% of total system load. A novel index is also proposed which incorporates level of DG penetration and percentage reduction in real power losses. The results are promising when compared with recently proposed algorithms.</p>


Author(s):  
Zuhaila Mat Yasin ◽  
Izni Nadhirah Sam’ón ◽  
Norziana Aminudin ◽  
Nur Ashida Salim ◽  
Hasmaini Mohamad

<p>Monitoring fault current is very important in power system protection. Therefore, the impact of installing Distributed Generation (DG) on the fault current is investigated in this paper. Three types of fault currents which are single line-to-ground, double line-to-ground and three phase fault are analyzed at various fault locations. The optimal location of DG was identified heuristically using power system simulation program for planning, design and analysis of distribution system (PSS/Adept). The simulation was conducted by observing the power losses of the test system by installing DG at each load buses. Bus with minimum power loss was chosen as the optimal location of DG. In order to study the impact of DG to the fault current, various locations and sizes of DG were also selected. The simulations were conducted on IEEE 33-bus distribution test system and IEEE 69-bus distribution test system. The results showed that the impact of DG to the fault current is significant especially when fault occurs at busses near to DG location.</p>


Sign in / Sign up

Export Citation Format

Share Document