scholarly journals THE INFLUENCE AND THE COMPARISON OF TURKISH PROCUREMENT SYSTEMS ON CONSTRUCTION PROJECT PERFORMANCE

Author(s):  
İLKNUR AKINER ◽  
MUHAMMED ERNUR AKINER
Author(s):  
Syed Arslan Haider ◽  
Mário Nuno Mata ◽  
Shehnaz Tehseen ◽  
José Martins

2019 ◽  
Vol 5 (1) ◽  
pp. 29-34
Author(s):  
Ayu Herzanita

WBS (Work Breakdown Structure) plays an important role in every construction project. WBS is a hierarchy of decreasing scope of work to become the smallest level called a work package, making it easier in the process of project management and control. The current problem is that many contractors in Indonesia, both large and small contractors, do not understand the importance of using WBS in a construction project. This causes project performance to be less than optimal, especially on cost and time performance. Currently, WBS standards have been developed for building projects. In this study will look at the cost and time performance of the project from the use of WBS standard building. The sample used in this study are projects that have applied the use of project standards. The projects include Building X, Lecture Building Y, and Sports Facility Building Z. The method used in this study is the EVM (Earn Value Method) approach, collecting data using questionnaires. The results showed that using the WBS standard had an effect on cost and time performance. Good cost and time performance is shown in the Building X and Lecture Y buildings. While the cost and time performance of the Z Sports Facility Building tends to be unstable. This is because the work items that exist in the WBS standard are not in accordance with the project conditions, so it is necessary to adjust work items.


2012 ◽  
Vol 18 (1) ◽  
pp. 133-144 ◽  
Author(s):  
Fu-Cih Siao ◽  
Yu-Cheng Lin

Many interfaces typically exist in the construction phase of a project. Since project participants usually fail to share interface information, most interfaces are difficult to solve effectively during that phase. Furthermore, future activities might not be implemented based on changes made by predecessors. In practice, failure to manage interfaces may result in additional work or in low project performance. In order to manage construction interfaces effectively, this study proposes the novel Multilevel Interface (MI) Matrix approach to enhance interface management during the construction phase of construction projects. By using the MI matrix approach, construction interface issues will be tracked and man-aged easily and effectively. Furthermore, this study develops a construction web matrix-based interface management (WMIM) system integrated with the proposed MI Matrix approach. The MI matrix approach and WMIM system are applied to a pilot test to illustrate how to support interface management during the construction project. As results of the pilot test indicate, the MI matrix approach and WMIM system provide an effective interface management tool for the construction phase. Santrauka Statybos projekto statybos darbų etapui būdinga tai, kad su įvairiais subjektais palaikoma gausybė ryšių. Daugumą jų šiame etape veiksmingai palaikyti dažniausiai ne itin lengva, nes projekto dalyviai paprastai informacija apie juos nesidalija. Be to, perimantys darbą gali ir nesiremti savo pirmtakų padarytais pakeitimais. Praktine prasme nesugebant valdyti ryšių, gali tekti darbus perdaryti arba projekto efektyvumas gali sumažėti. Efektyviam su statyba susijusių ryšių valdymui šiame darbe siūlomas novatoriškas įvairialygių ryšių (ĮR) matricos metodas, leidžiantis pagerinti ryšių valdymą statybos projekto statybos darbų etape. Taikant ĮR matricos metodą lengva veiksmingai sekti ir valdyti statybų ryšių klausimus. Be to, atliekant tyrimą sukuriama projekto dalyviams skirta internetinė matricinė statybų ryšių valdymo (WMIM) sistema, į kurią įtrauktas siūlomas ĮR matricos metodas. Taip pat, taikant ĮR matricos metodą ir WMIM sistemą, atliekamas bandymas, rodantis, kaip jie padeda valdyti statybos projekto ryšius. Bandymo rezultatai rodo, kad ĮR matricos metodas ir WMIM sistema – tai efektyvi ryšių valdymo priemonė statybos darbų etape.


2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Amirali Shalwani ◽  
Brian Lines

PurposeThe Project Management Body of Knowledge recommends the use of issue logs as a best practice to minimize the potential project cost and schedule growth. Although the broader topic of project control has been widely studied in the construction literature, the specific application of issue logs has remained relatively understudied. This study aims to analyze the extent and consistency with which construction teams utilize issue logs and the corresponding project performance outcomes.Design/methodology/approachA dataset of 5,635 individual issues was gathered from the final issue logs of 881 small building projects delivered via the design–bid–build method. Differences between groups were determined using the Kruskal–Wallis H test with post hoc testing via the Mann–Whitney U test with pairwise comparison.FindingsThe results showed that, on average, project teams who used issue logs to a greater extent achieved a 3.1 to 4.3% reduction in cost growth and a 5.3 to 12.3% reduction in schedule growth. This result shows that issue logs can be used to improve construction project performance in the areas of cost and schedule.Originality/valueThis result provides a contribution to practitioners, wherein project teams should be encouraged to establish their issue management practices early in the project schedule to encourage greater issue log usage for the remainder of the project.