Disaster Risk Reduction and the Capacity Building Plan: Mitigation of the Impacts of Climatic Disasters in the Coastal Area of Bangladesh

2019 ◽  
Vol 5 (2) ◽  
pp. 1-7 ◽  
Author(s):  
Ashraful Alam ◽  
Lipika Bhadra
2015 ◽  
Vol 6 (1) ◽  
pp. 53-57 ◽  
Author(s):  
MS Shaikh ◽  
M Shariot Ullah ◽  
MA Ali ◽  
AKM Adham

This study was undertaken to investigate the strategies for flood disaster risk reduction and adaptation around the coastal area of Bangladesh. Education level and environmental awareness, family size, farm size, adaptation tools, loss due to flood disaster, adaptation tools and area of the rivers and canals of the localities were taken as independent variables. On the other hand, pre and post flood activities were considered as dependent variable of the study. Pre flood activities such as miking around the flood disaster areas reduced flood risk 44.2%, radio and TV bulletin 25.0%, enclosure tube-well by polythene bag 16.7% and shifting the people to cyclone center reduced flood risk 14.2%. However, post flood activities such as food and water supply contributed 48.3% and activities of medical rescue team (i.e. provide medicine, vaccination and saline) and agricultural inputs supply (i.e. seed, fertilizer, livestock’s, fisheries) contributed the same percentage i.e. 25.8% to adapt flood disaster. These variables were tested to explore the relationship between the dependent and independent variables. Education level and environmental awareness, family size, farm size, adaptation tools, loss due to flood disaster were significantly correlated with the pre and post flood activities for flood disaster risk reduction and adaptation around the coastal areas. The findings indicated that the lower the education level and environmental awareness of the coastal area people the lower is the activities (pre and post) during flood disaster in flood disaster risk reduction and adaptation. The findings also indicated that the pre flood preparation is not enough for flood disaster risk reduction and adaptation around the coastal area of Bangladesh and adaptation tools were not sufficient for flood disaster risk reduction and adaptation around the coastal area s of Bangladesh.DOI: http://dx.doi.org/10.3329/jesnr.v6i1.22040 J. Environ. Sci. & Natural Resources, 6(1): 53-57 2013


2011 ◽  
Vol 11 (2) ◽  
pp. 293-300 ◽  
Author(s):  
T. Schlurmann ◽  
M. Siebert

Abstract. It was envisioned that the framework of the German-Indonesian Tsunami Early Warning System (GITEWS) should achieve an integral architecture and overarching technical design of an end-to-end tsunami early warning system (TEWS). In order to achieve this ambitious goal on a national and local level, a tailored set of capacity building measures has been started and implemented. The programme was meant and designed to meet requirements and urgent needs considering awareness raising campaigns, technical trainings and higher level education programs. These components have been integrated as complementary modules in order to ensure facilitating the early warning system to be operated, maintained and improved, and that institutions and people in coastal areas will respond adequately and timely in case of future tsunamis. Remarkable progress has been accomplished as well as programs and campaigns are being implemented in regard to a sustainable capacity development conducted by national institutions in Indonesia. Yet, local administrative and preparedness efforts on the Indonesian coastlines are still underdeveloped. This stems from the fact of missing links towards sustainable coastal zone management schemes on a broad local level. Yet, the demand and urgent need for an adequate and integrated disaster risk reduction and management addressing also other hazards in the region of interest is (still) substantial. Given the tragic loss of life and severe damages resulting from the December 2004 tsunami and recent series of severe earthquakes, the need for urgent mitigating action in the imperilled coastal regions of Sumatra and Java remains extremely high. The conceptual Capacity Building framework, its anticipated goals in the beginning of the project and, lately, the finally achieved objectives are promising. A significant contribution for mainstreaming scientific approaches and transfer methodological disaster risk reduction attempts towards other regions exposed to coastal hazards is still pending. Local authorities and researchers in tentative affected regions are now trained and enabled to disseminate and apply their knowledge and planning experience to other coastal regions in the area to help facilitating and multiplying effective disaster management plans and strategies. Yet, the Capacity Building framework within GITEWS also elucidated gaps in the early warning chain so that updated and to some extent re-iterated needs and demands in Capacity Building programs in any future research or development cooperation project are presented and discussed.


Author(s):  
Avid Leonardo Sari

This research was conducted on the Maribaya Timur school community in Lembang Subdistrict, West Bandung Regency, Indonesia, which is an active community in the area that is threatened by the potential for earthquake disasters due to the active Lembang fault. Disaster risk reduction efforts are pursued through increasing school-based preparedness that involves members of the school community, surrounding communities and various institutions that are associated with reducing the risk of school-based earthquake. Increasing preparedness against earthquakes focuses more on aspects of capacity building of school communities in reducing disaster risk, while aspects of vulnerability and threats have not been the focus of disaster risk reduction. The steps taken refer to the element of preparedness by aligning with the conditions, needs and potential that exist in the school community. Theoretically, if the school community has preparedness to face an earthquake disaster, the risk of earthquake disaster in the school community will be reduced so that it can minimize losses, victims and suffering that will be caused by the earthquake disaster.


2021 ◽  
Vol 1811 (1) ◽  
pp. 012108
Author(s):  
Rr M I Retno Susilorini ◽  
Rina Febrina ◽  
Helmia Adita Fitra ◽  
Juniastel Rajagukguk ◽  
Dhiyan Krishna Wardhani ◽  
...  

2019 ◽  
Vol 16 (3) ◽  
Author(s):  
Wisyanto

Landslides have occurred in various places in Indonesia. Likewise with West Java, there were many regions that has experienced repeated landslides. Having many experience of occurrences of landslides, we should have had a good landslide risk reduction program. Indeed, the incidence of landslides depends on many variables. Due to that condition, it may that a region would have different variable with another region. So it is impossible to generalize the implementation of a mitigation technology for all areas prone to landslides. Research of the Cililin's landslide is to anticipate the next disasters that may happen in around the area of 2013 Cililin Landslide. Through observation lithological conditions, water condition, land cover and landscape, as well as consideration of wide dimension of the building footing, the distance of building to the slopes and so forth, it has been determined some efforts of disaster risk reduction in the area around the landslide against the occurrence of potential landslide in the future.Bencana tanah longsor telah terjadi di berbagai tempat di Indonesia. Demikian halnya dengan Jawa Barat, tidak sedikit daerahnya telah berulang kali mengalami longsor. Seharusnya dengan telah banyaknya kejadian longsor, kita mampu mengupayakan program penurunan risiko longsor secara baik. Memang kejadian longsor bergantung pada banyak variabel, dimana dari satu daerah dengan daerah yang lain akan sangat memungkinkan mempunyai variabel yang berbeda, sehingga tidak mungkin kita membuat generalisasi penerapan suatu teknologi mitigasinya untuk semua daerah rawan longsor. Penelitian longsor di Cililin dilakukan untuk mengantisipasi terjadinya bencana di sekitar daerah Longsor Cililin 2013 yang lalu. Melalui pengamatan kondisi litologi, keairan, tutupan lahan dan bentang alam yang ada, serta pertimbangan akan dimensi luas pijakan bangunan, jarak batas bangunan dengan lereng dan lain sebagainya, telah ditentukan beberapa upaya penurunan risiko bencana di daerah sekitar longsor terhadap potensi kejadian longsor dimasa mendatang.Keywords: Landslide, risk reduction, footing of building, Cililin


Sign in / Sign up

Export Citation Format

Share Document