scholarly journals MONITORING OF THE BENCHES AND SIDES STABILITY OF THE QUARRIES

2021 ◽  
Author(s):  
Farit Nizametdinov ◽  
◽  
Sergey Ozhigin ◽  
Nail Nizametdinov ◽  
Aldiyar Oralbay ◽  
...  

The increase in the volume of opencast mining is facing the main problem of ensuring the stability of the open pit slopes on the planned contour. To achieve this goal, required reliable geomechanical support of the parameters of the slopes of quarry benches and sides, then placing them on the planned contour using special technological schemes of the slopes and constant instrumental monitoring of their condition in an automated mode. The main emphasis in the work has been given to the method of instrumental monitoring of the quarry’s arrays state using modern instruments with the analysis of their measurement’s accuracy. The approved instrumental methods of monitoring at the open-pit mines of Kazakhstan are presented.

2013 ◽  
Vol 671-674 ◽  
pp. 245-250
Author(s):  
Wen Hui Tan ◽  
Ya Liang Li ◽  
Cong Cong Li

At present, in-situ stress was not considered in Limit Equilibrium Method (LEM) of slopes, the influence of in-situ stress is very small on the stability of conventional slopes, but in deep-depressed open-pit mines, the influence should not be neglected. Formula for calculating the Factor of Safety (FOS) under the effect of horizontal in-situ stress was deduced using General Slice Method (GSM) of two-dimensional (2D) limit equilibrium method in this paper,a corresponding program SSLOPE was built, and the software was used in a deep- depressed open-pit iron mine. The results show that the FOS of the slope decreased by 20% when horizontal in-situ stress is considered, some reinforcements must be taken. Therefore, the influence of in-situ stress on slope stability should be taken into account in deep open –pit mines.


2021 ◽  
Author(s):  
Zihan Zhou ◽  
Yanjun Shen ◽  
Zhonghui Chen

Abstract Rock slopes with intermittent joints in open-pit mines are complex geological bodies composed of intact rock and discontinuous structural planes, and their stability analysis are necessary for mine disaster prevention. In this study, a series of base friction tests were performed to determine the failure process and displacement field evolution of rock slopes with intermittent joints using the speckle technique of a noncontact measurement system. Next, stability calculation models of the slopes were established from the energy perspective using the plastic limit analysis theory, and the effects of the joint inclination angle and coalescence coefficient of rock bridges on the slope stability were evaluated. The four main conclusions are as follows. (1) The failure of rock slopes with intermittent joints shows the feature of collapse-lower traction-upper push. (2) Based on the failure modes of rock bridges in slopes, the failure of rock slopes with intermittent joints could be divided into three types: tensile coalescence (Type A), shear coalescence (Type B), and tensile–shear coalescence (Type C). (3) Among the three slope types, the stability of the Type A slope is significantly influenced by rock cohesion, whereas that the Type B slope is significantly influenced by joint cohesion. The stability of the Type C slope is significantly influenced by the joint inclination angle and joint friction angle. (4) The local-stable slope is unstable while the first through-tensile crack in the zone of the potential sliding body higher than the critical instability height appeared. This study guides the stability evaluation and instability prediction of jointed rock slopes in open-pit mines.


2020 ◽  
Author(s):  
Emanuele Intrieri ◽  
Tommaso Carlà ◽  
Giovanni Gigli ◽  
Nicola Casagli

<p>In general, the most reliable parameters to forecast the occurrence of a landslide are kinematics parameters, such as displacement, velocity and acceleration, since they represent the direct indicator of the stability conditions of a slope. Despite recent advancement in satellite interferometry, the highest temporal resolution, necessary to set up an effective early warning system, are still achievable from ground-based instrumentation.</p><p>Within this framework a few methods to forecast the time of failure of landslides at slope-scale have been developed in the last decades and, in many instances, they have been successfully used to prevent casualties and economic losses.</p><p>Common applications include public safety situations and open-pit mines, for which accurate warnings are crucial to protect workers and at the same time avoid unnecessary interruptions of the extraction activities.</p><p>In this work, a review of the most relevant kinematics-based forecasting methods is presented. Some examples are shown to illustrate the respective advantages, limitations and range of applicability of each method. Future challenges, trends and opportunities provided by technological innovations and scientific advances, also in related fields such as Material Science and Applied Mathematics, are also presented.</p>


2009 ◽  
Vol 61 (4) ◽  
pp. 741-755 ◽  
Author(s):  
Fehmi Arikan ◽  
Fatih Yoleri ◽  
Sureyya Sezer ◽  
Dincer Caglan ◽  
Bengu Biliyul

2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Quang Hieu TRAN

Blasting is one of the most effective methods for fragmenting rock in quarries. Nevertheless, itsadverse effects are significant, especially blast-induced ground vibration. Field measurement andempirical equations are simple methods to determine and estimate the intensity of blast-induced groundvibration. However, we cannot evaluate the effects of blast-induced ground vibration on the surroundingenvironment based on these outcomes. Therefore, this study explores the relation between seismiccoefficient and rock properties through field measurements and an empirical model for evaluating theeffect of blast-induced ground vibration in open-pit mines. Accordingly, the seismic coefficient (K) isconsidered the main objective in this study. Firstly, it was determined based on the rock properties.Subsequently, an empirical model for estimating blast-induced ground vibration was developed based onfield measurements. This empirical equation was then expanded to determine K to check whether itmatches the determined K by the rock properties. Finally, it was used as the threshold to determine themaximum explosive charged per delay to ensure the safety of the surrounding environment from blastinducedground vibration. For this aim, the Thuong Tan III quarry (in Binh Duong province, Vietnam)was selected as a case study. Fifth-teen blasting events with a total of 75 blast-induced ground vibrationvalues were recorded and collected. An empirical equation for estimating blast-induced ground vibrationwas then developed based on the collected dataset, and K was determined in the range of 539 to 713 forthe Thuong Tan III quarry. Based on the measured blast-induced ground vibrations, developed empiricalmodel, and K values, the Phase 2 software was applied to simulate the effects of blast-induced groundvibration on the stability of slopes as one of the impacts on the surrounding environment. From thesimulation results, we can determine the maximum explosive charged per delay for each type of rock toensure the stability of the slope.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


2018 ◽  
Vol 5 ◽  
pp. 59-64
Author(s):  
P.A. Prokhorov ◽  
◽  
Val.V. Sencus ◽  
A.L. Mansurov ◽  
◽  
...  