Effects of Comprehensive Quality Assurance/Quality Control Plan on Pavement Management

Author(s):  
Raja Shekharan ◽  
Douglas Frith ◽  
Tanveer Chowdhury ◽  
Charles Larson ◽  
Dennis Morian
Author(s):  
Roger E. Smith ◽  
Thomas J. Freeman ◽  
Olga J. Pendleton

Many agencies responsible for managing pavements have adopted pavement management systems (PMS) to help manage their pavement networks more cost-effectively. One of the most costly parts of operating a PMS is collecting condition information, especially pavement distress information. Many agencies have started to contract for pavement distress data collection. Some of the agencies have experienced problems with the data collected by contract. A study for agencies in Washington and Oregon to define the accuracy of data needed by the agencies with an evaluation of certain participating vendors using semiautomated data collection methods is described. Issues about quality control and quality assurance faced by agencies considering contracting for automated data collection also are raised. These issues need additional study to develop appropriate guidelines. The initial set provided is based on discussions with some of the agencies currently contracting for pavement distress data collection.


Biosensors ◽  
2017 ◽  
Vol 7 (4) ◽  
pp. 3 ◽  
Author(s):  
Nikou Hesari ◽  
Nursel Kıratlı Yılmazçoban ◽  
Mohamad Elzein ◽  
Absar Alum ◽  
Morteza Abbaszadegan

Sign in / Sign up

Export Citation Format

Share Document