scholarly journals U.S. Geological Survey Standard Reference Sample Project: Performance Evaluation of Analytical Laboratories

Fact Sheet ◽  
1998 ◽  
Author(s):  
H. Keith Long ◽  
Richard L. Daddow ◽  
Jerry W. Farrar
2012 ◽  
Vol 204-208 ◽  
pp. 1848-1856
Author(s):  
Wu Gong Wang ◽  
Rong Guo Ma ◽  
Kun Feng ◽  
Guo Hua Liang

On the basis of defining the concept of rural highway project performance, the necessity of the project performance evaluation of rural highway is analyzed. According to the theories of government's public function, fiduciary responsibilities accountability and public finance, the relation between rural highway and public finance are made researches on. Furthermore,with the application of the demand level theory of Maslow, the interrelationship among objects of the rural highway project performance evaluation is made an analysis of, and on top of that, combined with SWOT analysis method, the demand and goal of rural highway project performance evaluation are put forward.


2020 ◽  
Vol 27 (8) ◽  
pp. 1763-1794
Author(s):  
Zhao Xu ◽  
Xiang Wang ◽  
Ya Xiao ◽  
Jingfeng Yuan

PurposeThere is often a lack of accurate performance evaluation in Public–Private Partnership (PPP) projects. It is a challenging issue to effectively use Building Information Modeling (BIM) for PPP project performance evaluation. The objective of this study is to develop a PPP project performance evaluation model based on Industry Foundation Classes (IFC) and an enhanced matter-element method to more precisely evaluate PPP project performance.Design/methodology/approachThe performance evaluation of PPP projects in the construction and operation period was explored. The PPP project performance evaluation indicator system was first established based on a literature review and PPP project practice. Then, the evaluation indicator information was expressed through IFC mapping and extension. After that, an IFC-based PPP project performance evaluation model was developed, and a case study was provided to validate the use of the proposed performance evaluation model.FindingsThe results of the case study show that the proposed approach can accurately and efficiently evaluate PPP projects, and it could favorably contribute to performance evaluation in PPP projects.Research limitations/implicationsThis study only concerns the performance evaluation of one type of PPP project. Further research is required to study different types of PPP projects; the model needs to be more efficient and intelligent.Originality/valueThe performance evaluation of PPP projects utilizing IFC extension and the enhanced matter-element method provides guidance for the government and private parties to accurately and efficiently evaluate PPP project performance.


Sign in / Sign up

Export Citation Format

Share Document