Hispanic laborer on roadway construction work site run over and killed by a backing flat bed dump truck - North Carolina.

2006 ◽  
BANGUNAN ◽  
2020 ◽  
Vol 25 (2) ◽  
pp. 11
Author(s):  
Sugiyanto Sugiyanto ◽  
Made Wena

Abstrak:Kelompok pekerja bangunan yang mengerjakan jenis pekerjaan pengalian tanah, pasangan anstampeng batu kali, pasangan pondasi batu kali, dan pasangan rolag diatas pondasi masih perlu mendapat perhatian, terutama munculnya faktor pengaruh ekternal dan internal dalam bekerja, sehinga mengurangi capaian hasil kerja yang masih rendah dan kurang memberi keuntungan terhadap jasa pelaksana konstruksi. Penelitian mengunakan cara survei, wawancara dan observasi hasil kerja pada setiap jenis pekerjaan konstruksi kepada kelompok pekerja dari pekerja, tukang, mandor dan pelaksana di kota Malang bekerja pada jasa pengembang bangunan tak bertingkat. Hasil penelitian diperoleh sumbangan atribut pada sosio ekonomi meliputi: pengalamam profesi pekerja antara 5-7 th, pendidikan formal yang dicapai sebelum bekerja min SD, Pelatihan ketrampilan kerja yang diperoleh melalui belajar dari tukang atasan, upah satuan harian,Jarak timbunan material kerja terhadap tempat pasangan komponen konstruksi, dan penataan site material dan tempat kerja konstruksi.sumbangan pada lingkungan sarana kerja meliputi variabel: site lokasi pekerjaan konstruksi, ketersediaan material sebelum mengawali pekerjaan konstruksi, kelengkapan peralatan kerja bantu yang dimiliki oleh masing profesi, cara mengunakan material dan metode kerja, Kondisi Cuaca saat berlangsung jam kerja, Profesi tetap sebagai tenaga kerja disektor bangunan, Koefisien upah dari kelompok pekerja dari jenis pekerjaan diperoleh dari hasil capaian produktivitas kerja real dilapangan dalam ukuran waktu kerja 7 jam sehari.Kata-kata kunci: produktivitas, Jenis pekerja bangunan, koefisien upah kerjaAbstract: The group of construction workers who performs the type of earth excavation work, river stone masonry pairs, river stone foundation pairs, and rollerag pairs on the foundation still need attention, especially the emergence of external and internal influencing factors in their work, thereby reducing low and insufficient performance. provide benefits for construction implementation services. The research used surveys, interviews and observations of the work results of each type of construction work to groups of workers, from workers, masons, foremen and implementers in Malang to work in multilevel building developer services. The results showed that the contribution of attributes to the socio-economy includes: professional experience of workers between 5-7 years, formal education achieved before working at elementary school, work skills training obtained through learning from a superior, daily unit wages, distance of work material hoarding to the partner’s place. construction components, and the arrangement of site material and construction workplaces. contributions to the work facility environment include variables: construction work site sites, availability of materials before starting construction work, completeness of work tools owned by each profession, how to use materials and work methods, conditions Weather during working hours, permanent profession as labor in the building sector, the wage coefficient of the group of workers from the type of work is obtained from the results of real work productivity achievements in the field in terms of working time of 7 hours a day.Keywords: productivity, type of construction worker, coefficient of wages


2017 ◽  
Vol 11 (3) ◽  
pp. 173-177 ◽  
Author(s):  
Bogdan Korobko ◽  
Ievgen Vasyliev

AbstractThis paper offers a test method for rheological behavior of mortars with different mobility and different composition, which are used for execution of construction work. This method is based on investigation of the interaction between the valve ball and the mortar under study and allows quick defining of experimental variables for any composition of building mortars. Certain rheological behavior will permit to calculate the design parameters of machines for specific conditions of work performance – mixing (pre-operation), pressure generation, pumping to the work site, workpiece surfacing.


2021 ◽  
Vol 4 (1) ◽  
pp. 59
Author(s):  
M. Irsan Sangadji ◽  
Edward Rizki Ahadian ◽  
M Darwis

The development of the construction world has resulted in the increasing need for heavy equipment for each project. Heavy equipment is a vital resource in a construction project. However, the costs required to procure heavy equipment are not cheap. Therefore, the choice of heavy equipment has a big influence on the efficiency and profitability of construction work. Productivity is used as a guide in determining the duration of each job and the number of heavy equipment to be treated. This research was conducted by observing the field to obtain the time needed by each heavy equipment in the reclamation work which then carried out the calculation of productivity. The results of the research are that the trailer/trailer truck has a productivity of 60.614 minutes, the excavator has a productivity of 21 m³/hour, the roller vibrator has a productivity of 155.625 m³/hour, the wheel loader has a productivity of 91.098 m³ hour, the water tanker has a productivity of 14.229 m³/hour, the motor grader has a productivity is 942,880 m²/hour, and the dump truck has a productivity of 26,981 m³/hour, then after analyzing the productivity of heavy equipment the next stage is calculating the time efficiency that occurs in each work item, and the mobilization work takes 17 days or less than the expected time. it has been planned in the contract document that is 28 days, in the usual piling work from the excavation source it will take 247 days or less than the time planned in the contract document which is 287 days.


Itinerario ◽  
2000 ◽  
Vol 24 (2) ◽  
pp. 146-169 ◽  
Author(s):  
Michael Leroy Oberg

In August of 1587 Manteo, an Indian from Croatoan Island, joined a group of English settlers in an attack on the native village of Dasemunkepeuc, located on the coast of present-day North Carolina. These colonists, amongst whom Manteo lived, had landed on Roanoke Island less than a month before, dumped there by a pilot more interested in hunting Spanish prize ships than in carrying colonists to their intended place of settlement along the Chesapeake Bay. The colonists had hoped to re-establish peaceful relations with area natives, and for that reason they relied upon Manteo to act as an interpreter, broker, and intercultural diplomat. The legacy of Anglo-Indian bitterness remaining from Ralph Lane's military settlement, however, which had hastily abandoned the island one year before, was too great for Manteo to overcome. The settlers found themselves that summer in the midst of hostile Indians.


Sign in / Sign up

Export Citation Format

Share Document